9595 McGlade School Road, Dresden, OH 43821Plant Summary Information
Dresden Energy Facility is ranked #14 out of 195 power plants in Ohio in terms of total annual net electricity generation.
Dresden Energy Facility is comprised of 3 generators and generated 1.1 TWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Dresden Energy Facility |
|---|---|
| Utility Name | Appalachian Power Co |
| Location | Muskingum County, OH |
| Initial Operation Date | February 2012 |
| Last Update | Nov 2025 |
| Annual Generation | 4.2 TWh |
| Annual Consumption | 31.2 M MMBtu |
| Ranked #273 out of 12,574 Power Plants Nationwide | |
| Ranked #139 out of 2,244 Natural Gas Power Plants Nationwide | |
| Ranked #14 out of 195 Ohio Power Plants | |
| Ranked #8 out of 55 Ohio Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Dresden Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dresden Energy Facility.
Monthly Net Generation for Dresden Energy Facility
Dresden Energy Facility Details
| Summary Information | |
|---|---|
| Plant Name | Dresden Energy Facility (55350) |
| Plant Address | 9595 McGlade School Road, Dresden, OH 43821 |
| Utility | Appalachian Power Co (733) |
| Latitude, Longitude | 40.0928, -82.0276 |
| Generation Dates on File | Nov 2012 to Nov 2025 |
| Initial Operation Date | February 2012 |
| Annual Generation | 4.2 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 00-28 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Muskingum River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Appalachian Power Co (733) OH |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
| Natural Gas Storage | No |
Generator 1 Details Operating February 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158.3 MW |
| Winter Capacity | 183.3 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating February 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158.3 MW |
| Winter Capacity | 183.3 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating February 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 280.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 223.4 MW |
| Winter Capacity | 258.4 MW |
| Minimum Load | 173 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Dresden Energy Facility Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #129 | West Riverside Energy Center | Beloit, WI | 4.4 TWh |
| #130 | Allegheny Energy Units 3 4 & 5 | Springdale, PA | 4.4 TWh |
| #131 | Keys Energy Center | Brandywine, MD | 4.4 TWh |
| #132 | Quantum Choctaw Power LLC | Ackerman, MS | 4.4 TWh |
| #133 | Lowman Energy Center | Leroy, AL | 4.3 TWh |
| #134 | ExxonMobil Beaumont Refinery | Beaumont, TX | 4.4 TWh |
| #135 | Hill Top Energy Center, LLC | Carmichaels, PA | 4.3 TWh |
| #136 | Ouachita | Sterlington, LA | 4.3 TWh |
| #137 | Thad Hill Energy Center | Clifton, TX | 4.2 TWh |
| #138 | Rio Nogales Power Project | Seguin, TX | 4.2 TWh |
| #140 | West Phoenix | Phoenix, AZ | 4.2 TWh |
| #141 | Central Alabama Generating Station | Billingsley, AL | 4.2 TWh |
| #142 | Fremont Energy Center | Fremont, OH | 4.1 TWh |
| #143 | Ontelaunee Energy Center | Reading, PA | 4.1 TWh |
| #144 | Tracy | Sparks, NV | 4.1 TWh |
| #145 | Ratcliffe | De Kalb, MS | 4.0 TWh |
| #146 | Newman | El Paso, TX | 4.0 TWh |
| #147 | Cane Island | Intercession City, FL | 4.0 TWh |
| #148 | Mesquite Generating Station Block 2 | Arlington, AZ | 4.0 TWh |
| #149 | Buck | Salisbury, NC | 4.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dresden Energy Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 3100 Valleyview Drive | Columbus, OH | 548.0 MWh | 53.8 mi |
| Anadarko | Woodsfield, OH | 42.0 MWh | 53.6 mi |
| Broshco Fabricated Products | Mansfield, OH | 281.0 MWh | 55.1 mi |
| Denison Solar Array | Granville, OH | 2.1 GWh | 26 mi |
| DG AMP Solar Brewster | Brewster, OH | 2.3 GWh | 48 mi |
| DG AMP Solar Orrville 3 | Orrville, OH | 3.3 GWh | 54.6 mi |
| Dodge Park Engine No 1 | Columbus, OH | 1.0 MWh | 53.1 mi |
| Dover (OH) | Dover, OH | 51.7 GWh | 41.7 mi |
| Dover Peaking | Dover, OH | 402.0 MWh | 41.7 mi |
| Galion Generating Station | Galion, OH | 2.8 GWh | 58.8 mi |
| Guernsey Power Station | Byesville, OH | 11.3 TWh | 28.2 mi |
| Orrville | Orrville, OH | 22.0 GWh | 54.2 mi |
| Orrville Peaking | Orrville, OH | 209.0 MWh | 54.9 mi |
| Progress Drive Generation Station | Shelby, OH | 103.0 MWh | 36 mi |
| PS ST-8 Engine No 1 | Columbus, OH | 3.0 MWh | 54.8 mi |
| Renick Run Pumping Station 03-04 | Columbus, OH | 1.0 MWh | 53.3 mi |
| ST-1/1A Engine No 1 | Columbus, OH | 2.0 MWh | 53.2 mi |
| Suburban Landfill Gas Recovery | Glenford, OH | 28.2 GWh | 17 mi |
| Washington Energy Facility | Beverly, OH | 3.5 TWh | 40.5 mi |
| Waterford Power, LLC | Waterford, OH | 5.2 TWh | 42 mi |