Dresden Energy Facility
9595 McGlade School Road, Dresden, OH 43821Plant Summary Information
Dresden Energy Facility is ranked #15 out of 194 power plants in Ohio in terms of total annual net electricity generation.
Dresden Energy Facility is comprised of 3 generators and generated 1.1 TWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Dresden Energy Facility |
|---|---|
| Utility Name | Appalachian Power Co |
| Location | Muskingum County, OH |
| Initial Operation Date | February 2012 |
| Last Update | Mar 2026 |
| Annual Generation | 4.0 TWh |
| Annual Consumption | 30.3 M MMBtu |
| Ranked #282 out of 12,332 Power Plants Nationwide | |
| Ranked #141 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #15 out of 194 Ohio Power Plants | |
| Ranked #9 out of 51 Ohio Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
Map of Dresden Energy Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dresden Energy Facility.
Monthly Net Generation for Dresden Energy Facility
Monthly Plant Fuel Consumption for Dresden Energy Facility
Dresden Energy Facility Details
| Summary Information | |
|---|---|
| Plant Name | Dresden Energy Facility (55350) |
| Plant Address | 9595 McGlade School Road, Dresden, OH 43821 |
| Utility | Appalachian Power Co (733) |
| Latitude, Longitude | 40.0928, -82.0276 |
| Generation Dates on File | Nov 2012 to Mar 2026 |
| Initial Operation Date | February 2012 |
| Annual Generation | 4.0 TWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 00-28 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | RFC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Muskingum River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Appalachian Power Co (733) OH |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | DOMINION TRANSMISSION INCORPORATED |
| Natural Gas Storage | No |
Generator 1 Details Operating February 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158.3 MW |
| Winter Capacity | 183.3 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating February 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Combustion Turbine Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Can Bypass Heat Recovery Steam Generator | Yes |
| Nameplate Capacity | 198.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 158.3 MW |
| Winter Capacity | 183.3 MW |
| Minimum Load | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating February 2012
| Technology | Natural Gas Fired Combined Cycle |
|---|---|
| Prime Mover | Combined Cycle Steam Part |
| Unit Code | CC1 |
| Ownership | Single Owner |
| Duct Burners | Yes |
| Nameplate Capacity | 280.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 223.4 MW |
| Winter Capacity | 258.4 MW |
| Minimum Load | 173 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | February 2012 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Dresden Energy Facility Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #131 | Hill Top Energy Center, LLC | Carmichaels, PA | 4.3 TWh |
| #132 | Cane Island | Intercession City, FL | 4.3 TWh |
| #133 | Lowman Energy Center | Leroy, AL | 4.3 TWh |
| #134 | Ouachita | Sterlington, LA | 4.2 TWh |
| #135 | Tracy | Sparks, NV | 4.2 TWh |
| #136 | ExxonMobil Beaumont Refinery | Beaumont, TX | 4.3 TWh |
| #137 | Ratcliffe | De Kalb, MS | 4.2 TWh |
| #138 | Fort St Vrain | Platteville, CO | 4.1 TWh |
| #139 | Fremont Energy Center | Fremont, OH | 4.1 TWh |
| #140 | Griffith Energy LLC | Golden Valley, AZ | 4.1 TWh |
| #142 | Northport | Northport, NY | 4.5 TWh |
| #143 | Harding Street | Indianapolis, IN | 4.0 TWh |
| #144 | Buck | Salisbury, NC | 4.0 TWh |
| #145 | Woodbridge Energy Center | Keasbey, NJ | 4.0 TWh |
| #146 | Dan River | Eden, NC | 4.0 TWh |
| #147 | Granite Ridge | Londonderry, NH | 4.0 TWh |
| #148 | Jack Fusco Energy Center | Thompsons, TX | 3.9 TWh |
| #149 | Dearborn Industrial Generation | Dearborn, MI | 4.1 TWh |
| #150 | Dell Power Station | Dell, AR | 3.9 TWh |
| #151 | Chattahoochee Energy Facility | Franklin, GA | 3.9 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dresden Energy Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 3100 Valleyview Drive | Columbus, OH | 548.0 MWh | 53.8 mi |
| Anadarko | Woodsfield, OH | 42.0 MWh | 53.6 mi |
| Broshco Fabricated Products | Mansfield, OH | 198.0 MWh | 55.1 mi |
| Carroll County Energy | Carrollton, OH | 5.5 TWh | 62 mi |
| Denison Solar Array | Granville, OH | 2.6 GWh | 26 mi |
| DG AMP Solar Brewster | Brewster, OH | 2.3 GWh | 48 mi |
| DG AMP Solar Orrville 3 | Orrville, OH | 3.3 GWh | 54.6 mi |
| Dodge Park Engine No 1 | Columbus, OH | 1.0 MWh | 53.1 mi |
| Dover (OH) | Dover, OH | 51.7 GWh | 41.7 mi |
| Dover Peaking | Dover, OH | 402.0 MWh | 41.7 mi |
| Galion | Galion, OH | 273.0 MWh | 59.7 mi |
| Galion Generating Station | Galion, OH | 2.8 GWh | 58.8 mi |
| Guernsey Power Station | Byesville, OH | 11.7 TWh | 28.2 mi |
| Morton Salt Rittman | Rittman, OH | 13.4 GWh | 62 mi |
| Orrville Peaking | Orrville, OH | 209.0 MWh | 54.9 mi |
| Progress Drive Generation Station | Shelby, OH | 103.0 MWh | 36 mi |
| Suburban Landfill Gas Recovery | Glenford, OH | 28.2 GWh | 17 mi |
| Washington Energy Facility | Beverly, OH | 3.6 TWh | 40.5 mi |
| Waterford Power, LLC | Waterford, OH | 5.5 TWh | 42 mi |
| Willow Island Hydroelectric Plant | Willow Island, WV | 182.5 GWh | 63.3 mi |