Beaver Dam Solar
8101 N Crystal Lake Rd, Dodge, WI 53916Plant Summary Information
Beaver Dam Solar is ranked #14 out of 91 solar farms in Wisconsin in terms of total annual net electricity generation.
Beaver Dam Solar generated 33.1 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Beaver Dam Solar |
|---|---|
| Utility Name | Wisconsin Power & Light Co |
| Location | Dodge County, WI |
| Initial Operation Date | December 2023 |
| Last Update | Sep 2025 |
| Annual Generation | 100.5 GWh |
| Annual Consumption | 369.7 k MMBtu |
| Ranked #3,387 out of 12,539 Power Plants Nationwide | |
| Ranked #801 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #56 out of 239 Wisconsin Power Plants | |
| Ranked #14 out of 91 Wisconsin Solar Power Plants | |
| Fuel Types | Solar |
Map of Beaver Dam Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Beaver Dam Solar.
Monthly Net Generation for Beaver Dam Solar
Beaver Dam Solar Details
| Summary Information | |
|---|---|
| Plant Name | Beaver Dam Solar (65001) |
| Plant Address | 8101 N Crystal Lake Rd, Dodge, WI 53916 |
| Utility | Wisconsin Power & Light Co (20856) |
| Latitude, Longitude | 43.49394, -88.78389 |
| Generation Dates on File | Dec 2023 to Sep 2025 |
| Initial Operation Date | December 2023 |
| Annual Generation | 100.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | American Transmission Co (659) |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | ALTE.BVRDAM |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | ALTE.BVRDAM |
| Nameplate Capacity | 50 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Other Planned Modifications | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 64.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Beaver Dam Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #791 | Elevation Solar C | Lancaster, CA | 103.2 GWh |
| #792 | Airport Solar | Lakeview, OR | 102.8 GWh |
| #793 | Ranchland Solar, LLC | Moyock, NC | 102.4 GWh |
| #794 | Bullock Solar, LLC | Manson, NC | 102.4 GWh |
| #795 | Mountain View Solar (FL) | Dade City, FL | 102.0 GWh |
| #796 | Red Horse 2 | Willcox, AZ | 147.6 GWh |
| #797 | Luning Energy | Luning, NV | 101.5 GWh |
| #798 | Blue Harvest Solar Park | Continental, OH | 101.4 GWh |
| #799 | Riverside Solar | Ruskin, FL | 101.3 GWh |
| #800 | Timber Road Solar Park | Payne, OH | 100.5 GWh |
| #802 | Pearl Solar | Fort Stockton, TX | 100.5 GWh |
| #803 | North Rock | Edgerton, WI | 100.1 GWh |
| #804 | Assembly Solar Project | Venice Township, MI | 100.1 GWh |
| #805 | Waipio Solar | Waipio, HI | 100.0 GWh |
| #806 | Bear Creek (WI) | Lone Rock, WI | 99.9 GWh |
| #807 | Kimmel Road Solar, LLC | Du Quoin, IL | 99.7 GWh |
| #808 | Brantley Solar | Spring Hope, NC | 99.5 GWh |
| #809 | ENGIE Solidago Solar Project - Hybrid | Townsend, DE | 99.5 GWh |
| #810 | Innovative Solar 54 | Kinston, NC | 98.9 GWh |
| #811 | Pleasant Creek Unit 1 | Palo, IA | 98.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Beaver Dam Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Auburn Solar WI, LLC | Campbellsport, WI | 80.0 MWh | 28.3 mi |
| Berlin Landfill Gas | Berlin, WI | 13.6 GWh | 32.9 mi |
| Butler Ridge | Mayville, WI | 140.2 GWh | 16.5 mi |
| Cedar Ridge | Eden, WI | 174.6 GWh | 26.6 mi |
| Columbia (WI) | Pardeville, WI | 6.3 TWh | 31.9 mi |
| Concord | Watertown, WI | 175.2 GWh | 23.1 mi |
| Crawfish River | Jefferson, WI | 131.0 GWh | 34.4 mi |
| Dane County Airport Solar | Madison, WI | 17.7 GWh | 35.8 mi |
| Deertrack Park Gas Recovery | Watertown, WI | 37.0 GWh | 28 mi |
| ENGIE 2020 ProjectCo-WI1 LLC | Fond Du Lac, WI | 2.1 GWh | 22.8 mi |
| Fond du Lac Community Solar | Fond Du Lac, WI | 2.1 GWh | 22.7 mi |
| Forward Wind Energy Center | Brownsville, WI | 145.7 GWh | 16.7 mi |
| Glacier Hills | Cambria, WI | 374.6 GWh | 18.9 mi |
| Jefferson Solar Park | Jefferson, WI | 918.0 MWh | 33.1 mi |
| Ledgeview | Fond du Lac, WI | 2.2 GWh | 29.5 mi |
| Portage Solar Plant | Portage, WI | 22.8 GWh | 24.3 mi |
| Regal Ware | West Bend, WI | 2.8 GWh | 30.8 mi |
| South Fond Du Lac | Fond du Lac, WI | 5.4 GWh | 22 mi |
| Springfield Solar (WI) | Lomira, WI | 202.6 GWh | 18.7 mi |
| Washington County | West Bend, WI | 3.8 GWh | 31.5 mi |