Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Manchester Street | Manchester Street, LLC. | Providence, RI | ISO New England (ISNE) | 2.1 TWh | Aug 1995 | May 2026 | Natural Gas : 92.2% Distillate Fuel Oil : 7.8% |
| H B Robinson | Duke Energy Progress - (NC) | Hartsville, SC | Duke Energy Progress East (CPLE) | 6.7 TWh | Feb 1971 | May 2026 | Nuclear |
| W S Lee | Duke Energy Carolinas, LLC | Williamston, SC | Duke Energy Carolinas (DUK) | 5.9 TWh | Feb 1951 | May 2026 | Natural Gas |
| Oconee | Duke Energy Carolinas, LLC | Seneca, SC | Duke Energy Carolinas (DUK) | 22.0 TWh | Jun 1973 | May 2026 | Nuclear |
| McMeekin | Dominion Energy South Carolina, Inc | Columbia, SC | Dominion Energy South Carolina, Inc. (SCEG) | 385.7 GWh | Jun 1958 | May 2026 | Natural Gas |
| Urquhart | Dominion Energy South Carolina, Inc | Beech Island, SC | Dominion Energy South Carolina, Inc. (SCEG) | 1.9 TWh | Nov 1953 | May 2026 | Natural Gas : 98.8% Distillate Fuel Oil : 1.2% |
| Wateree | Dominion Energy South Carolina, Inc | Eastover, SC | Dominion Energy South Carolina, Inc. (SCEG) | 2.6 TWh | Aug 1970 | May 2026 | Bituminous Coal : 99.4% Distillate Fuel Oil : 0.6% |
| Williams | South Carolina Genertg Co, Inc | Goose Creek, SC | Dominion Energy South Carolina, Inc. (SCEG) | 2.5 TWh | May 1972 | May 2026 | Bituminous Coal : 99.6% |
| Ben French | Black Hills Power, Inc. | Rapid City, SD | Western Area Power Administration - Rocky Mountain Region (WACM) | 17.4 GWh | Mar 1960 | May 2026 | Natural Gas : 99.6% |
| Allen | Tennessee Valley Authority | Memphis, TN | Tennessee Valley Authority (TVA) | 5.4 TWh | Apr 1959 | May 2026 | Natural Gas |
| Cumberland (TN) | Tennessee Valley Authority | Cumberland City, TN | Tennessee Valley Authority (TVA) | 9.2 TWh | Feb 1973 | May 2026 | Bituminous Coal : 99.0% Distillate Fuel Oil : 1.0% |
| Gallatin (TN) | Tennessee Valley Authority | Gallatin, TN | Tennessee Valley Authority (TVA) | 4.9 TWh | Oct 1956 | May 2026 | Subbituminous Coal : 94.7% Natural Gas : 5.1% |
| John Sevier | Tennessee Valley Authority | Rogersville, TN | Tennessee Valley Authority (TVA) | 4.2 TWh | Jan 1956 | May 2026 | Natural Gas |
| Johnsonville | Tennessee Valley Authority | New Johnsonville, TN | Tennessee Valley Authority (TVA) | 1.5 TWh | Sep 1951 | May 2026 | Natural Gas : 99.9% |
| Kingston | Tennessee Valley Authority | Kingston, TN | Tennessee Valley Authority (TVA) | 3.4 TWh | Jan 1954 | May 2026 | Subbituminous Coal : 66.7% Bituminous Coal : 33.0% |
| Nueces Bay | City of San Antonio - (TX) | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.8 TWh | Jun 1972 | May 2026 | Natural Gas |
| Newman | El Paso Electric Co | El Paso, TX | El Paso Electric Company (EPE) | 3.5 TWh | Apr 1960 | May 2026 | Natural Gas |
| Lewis Creek | Entergy Texas Inc. | Willis, TX | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 TWh | Nov 1970 | May 2026 | Natural Gas |
| Sabine | Entergy Texas Inc. | Orange, TX | Midcontinent Independent System Operator, Inc. (MISO) | 3.7 TWh | Dec 1961 | May 2026 | Natural Gas |
| Cedar Bayou | NRG Texas Power LLC | Baytown, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 2.1 TWh | Nov 1970 | May 2026 | Natural Gas |
| T H Wharton | NRG Texas Power LLC | Houston, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 655.1 GWh | Jun 1967 | May 2026 | Natural Gas |
| W A Parish | NRG Texas Power LLC | Thompsons, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 14.3 TWh | May 1958 | May 2026 | Subbituminous Coal : 81.6% Natural Gas : 18.4% |
| Jones | Southwestern Public Service Co | Lubbock, TX | Southwest Power Pool (SWPP) | 3.2 TWh | Dec 1970 | May 2026 | Natural Gas |
| Handley | Constellation Power, Inc | Fort Worth, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 890.5 GWh | Jun 1963 | May 2026 | Natural Gas |
| V H Braunig | City of San Antonio - (TX) | Elmendorf, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 281.9 GWh | Feb 1966 | May 2026 | Natural Gas : 99.3% Distillate Fuel Oil : 0.7% |
| R W Miller | RW Miller Power LLC | Palo Pinto, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 586.3 GWh | Sep 1968 | May 2026 | Natural Gas |
| Gadsby | PacifiCorp | Salt Lake City, UT | PacifiCorp East (PACE) | 191.3 GWh | Aug 1951 | May 2026 | Natural Gas |
| Ascutney | Green Mountain Power Corp | Weatherfield, VT | ISO New England (ISNE) | 437.0 MWh | Jul 1961 | May 2026 | Distillate Fuel Oil |
| Berlin 5 | Green Mountain Power Corp | Berlin, VT | ISO New England (ISNE) | 1.9 GWh | May 1972 | May 2026 | Kerosene |
| Essex Junction 19 | Green Mountain Power Corp | Essex Junction, VT | ISO New England (ISNE) | 33.8 GWh | Dec 1916 | May 2026 | Water : 98.8% Distillate Fuel Oil : 1.2% |
| Clinch River | Appalachian Power Co | Cleveland, VA | PJM Interconnection, LLC (PJM) | 323.9 GWh | Aug 1958 | May 2026 | Natural Gas |
| Chesterfield | Virginia Electric & Power Co | Chester, VA | PJM Interconnection, LLC (PJM) | 2.0 TWh | Nov 1952 | May 2026 | Natural Gas : 96.3% Distillate Fuel Oil : 3.7% |
| Possum Point | Virginia Electric & Power Co | Dumfries, VA | PJM Interconnection, LLC (PJM) | 2.5 TWh | May 1955 | May 2026 | Natural Gas : 99.6% |
| Surry | Virginia Electric & Power Co | Surry, VA | PJM Interconnection, LLC (PJM) | 12.2 TWh | Nov 1972 | May 2026 | Nuclear |
| Swift 1 | PacifiCorp | Cougar, WA | PacifiCorp West (PACW) | 508.0 GWh | Nov 1958 | May 2026 | Water |
| Crystal Mountain | Puget Sound Energy Inc | Greenwater, WA | Puget Sound Energy, Inc. (PSEI) | 775.0 MWh | Nov 1969 | May 2026 | Distillate Fuel Oil |
| Rocky Reach | PUD No 1 of Chelan County - (WA) | Wenatchee, WA | Public Utility District No. 1 of Chelan County (CHPD) | 6.2 TWh | May 1961 | May 2026 | Water |
| Wells | PUD No 1 of Douglas County - (WA) | Chelan, WA | PUD No. 1 of Douglas County (DOPD) | 4.3 TWh | Aug 1967 | May 2026 | Water |
| Priest Rapids | PUD No 2 of Grant County - (WA) | Mattawa, WA | Bonneville Power Administration (BPAT) | 4.9 TWh | Sep 1959 | May 2026 | Water |
| Wanapum | PUD No 2 of Grant County - (WA) | Beverly, WA | Public Utility District No. 2 of Grant County, Washington (GCPD) | 5.3 TWh | May 1963 | May 2026 | Water |
| The Dalles | USACE Northwestern Division | The Dalles, OR | Bonneville Power Administration (BPAT) | 6.5 TWh | May 1957 | May 2026 | Water |
| Mossyrock | City of Tacoma - (WA) | Silver Creek, WA | City of Tacoma, Department of Public Utilities, Light Division (TPWR) | 1.0 TWh | Sep 1968 | May 2026 | Water |
| Chief Joseph | USACE Northwestern Division | Bridgeport, WA | Bonneville Power Administration (BPAT) | 11.5 TWh | Aug 1955 | May 2026 | Water |
| Ice Harbor | USACE Northwestern Division | Burbank, WA | Bonneville Power Administration (BPAT) | 1.5 TWh | Dec 1961 | May 2026 | Water |
| Little Goose | USACE Northwestern Division | Dayton, WA | Bonneville Power Administration (BPAT) | 1.6 TWh | Mar 1970 | May 2026 | Water |
| Lower Monumental | USACE Northwestern Division | Kahlotus, WA | Bonneville Power Administration (BPAT) | 1.5 TWh | May 1969 | May 2026 | Water |
| John E Amos | Appalachian Power Co | St Albans, WV | PJM Interconnection, LLC (PJM) | 8.3 TWh | Aug 1971 | May 2026 | Bituminous Coal : 99.4% Distillate Fuel Oil : 0.6% |
| FirstEnergy Harrison Power Station | Monongahela Power Co | Haywood, WV | PJM Interconnection, LLC (PJM) | 11.1 TWh | Nov 1972 | May 2026 | Refined Coal : 81.7% Bituminous Coal : 18.2% |
| Mitchell (WV) | Kentucky Power Co | Captina, WV | PJM Interconnection, LLC (PJM) | 4.2 TWh | Apr 1971 | May 2026 | Bituminous Coal : 99.0% Distillate Fuel Oil : 1.0% |
| Mt Storm | Virginia Electric & Power Co | Mount Storm, WV | PJM Interconnection, LLC (PJM) | 4.9 TWh | Aug 1965 | May 2026 | Bituminous Coal : 99.7% |
| French Island | Northern States Power Co - Minnesota | La Cross, WI | Midcontinent Independent System Operator, Inc. (MISO) | 65.3 GWh | Dec 1939 | May 2026 | Wood/Wood Waste Solids : 43.5% Non-biogenic Municipal Solid Waste : 25.3% Biogenic Municipal Solid Waste : 20.7% Distillate Fuel Oil : 10.2% |
| Port Washington Generating Station | Wisconsin Electric Power Co | Port Washington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 TWh | Jun 2005 | May 2026 | Natural Gas |
| South Oak Creek | Wisconsin Electric Power Co | Oak Creek, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Nov 1959 | May 2026 | Subbituminous Coal : 99.5% |
| Valley (WI) | Wisconsin Electric Power Co | Milwaukee, WI | Midcontinent Independent System Operator, Inc. (MISO) | 376.3 GWh | May 1968 | May 2026 | Natural Gas |
| Point Beach Nuclear Plant | NextEra Energy Point Beach LLC | Two Rivers, WI | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 TWh | May 1969 | May 2026 | Nuclear |
| Edgewater | Wisconsin Power & Light Co | Sheboygan, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Jun 1951 | May 2026 | Subbituminous Coal : 99.8% |
| Pulliam | Wisconsin Public Service Corp | Green Bay, WI | Midcontinent Independent System Operator, Inc. (MISO) | 103.2 GWh | Aug 1949 | May 2026 | Natural Gas |
| Weston | Wisconsin Public Service Corp | Rothschild, WI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 TWh | Nov 1954 | May 2026 | Subbituminous Coal : 99.3% Natural Gas : 0.7% |
| New Badger | City of Kaukauna (WI) | Kaukauna, WI | Midcontinent Independent System Operator, Inc. (MISO) | 43.8 GWh | Dec 2013 | May 2026 | Water |
| Manitowoc | Manitowoc Public Utilities | Manitowoc, WI | Midcontinent Independent System Operator, Inc. (MISO) | 178.4 GWh | May 1955 | May 2026 | Wood/Wood Waste Solids : 88.2% Petroleum Coke : 6.6% Bituminous Coal : 4.9% |
| Dave Johnston | PacifiCorp | Glen Rock, WY | PacifiCorp East (PACE) | 3.2 TWh | Jan 1959 | May 2026 | Subbituminous Coal : 99.8% |
| Naughton | PacifiCorp | Kemmerer, WY | PacifiCorp East (PACE) | 1.7 TWh | Apr 1963 | May 2026 | Subbituminous Coal : 65.9% Natural Gas : 34.1% |
| Easton 2 | Easton Utilities Comm | Easton, MD | PJM Interconnection, LLC (PJM) | 6.6 GWh | Feb 1978 | May 2026 | Distillate Fuel Oil |
| Waterford 3 | Entergy Louisiana LLC | Killona, LA | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 TWh | Aug 1985 | May 2026 | Nuclear |
| John P Madgett | Dairyland Power Coop | Alma, WI | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Oct 1979 | May 2026 | Subbituminous Coal : 99.5% |
| Barney M Davis | City of San Antonio - (TX) | Corpus Christi, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.6 TWh | Apr 1974 | May 2026 | Natural Gas |
| Riverside (OK) | Public Service Co of Oklahoma | Jenks, OK | Southwest Power Pool (SWPP) | 686.0 GWh | Mar 1974 | May 2026 | Natural Gas |
| Donald C Cook | Indiana Michigan Power Co | Bridgman, MI | PJM Interconnection, LLC (PJM) | 18.5 TWh | Jul 1975 | May 2026 | Nuclear |
| Joseph M Farley | Alabama Power Co | Columbia, AL | Southern Company Services, Inc. - Trans (SOCO) | 14.7 TWh | Nov 1977 | May 2026 | Nuclear |
| James H Miller Jr | Alabama Power Co | Quinton, AL | Southern Company Services, Inc. - Trans (SOCO) | 19.1 TWh | Sep 1978 | May 2026 | Subbituminous Coal : 99.0% Natural Gas : 1.0% |
| Pleasants Power Station | Omnis Pleasants, LLC | Willow Island, WV | PJM Interconnection, LLC (PJM) | 1.1 TWh | Mar 1979 | May 2026 | Bituminous Coal : 96.8% Natural Gas : 3.2% |
| Palo Verde | Arizona Public Service Co | Wintersburg, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 31.2 TWh | Dec 1985 | May 2026 | Nuclear |
| Calvert Cliffs Nuclear Power Plant | Constellation Nuclear | Lusby, MD | PJM Interconnection, LLC (PJM) | 14.9 TWh | Apr 1975 | May 2026 | Nuclear |
| Brunswick Nuclear | Duke Energy Progress - (NC) | Southport, NC | Duke Energy Progress East (CPLE) | 15.3 TWh | Oct 1975 | May 2026 | Nuclear |
| Harris (NC) | Duke Energy Progress - (NC) | New Hill, NC | Duke Energy Progress East (CPLE) | 7.8 TWh | Apr 1987 | May 2026 | Nuclear |
| Newton | Illinois Power Generating Co | Newton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 3.4 TWh | Oct 1977 | May 2026 | Subbituminous Coal : 99.8% |
| East Bend | Duke Energy Kentucky Inc | Union, KY | PJM Interconnection, LLC (PJM) | 2.9 TWh | Feb 1981 | May 2026 | Bituminous Coal : 99.6% |
| Perry | Energy Harbor Nuclear Generation LLC | Perry, OH | PJM Interconnection, LLC (PJM) | 11.0 TWh | Oct 1987 | May 2026 | Nuclear |
| Craig (CO) | Tri-State G & T Assn, Inc | Craig, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 3.2 TWh | Oct 1979 | May 2026 | Subbituminous Coal : 99.6% |
| Braidwood Generation Station | Constellation Nuclear | Braceville, IL | PJM Interconnection, LLC (PJM) | 19.6 TWh | Jun 1988 | May 2026 | Nuclear |
| Byron Generating Station | Constellation Nuclear | Byron, IL | PJM Interconnection, LLC (PJM) | 19.6 TWh | Aug 1985 | May 2026 | Nuclear |
| LaSalle Generating Station | Constellation Nuclear | Marseilles, IL | PJM Interconnection, LLC (PJM) | 18.5 TWh | Dec 1983 | May 2026 | Nuclear |
| Coal Creek | Rainbow Energy Center | Underwood, ND | Midcontinent Independent System Operator, Inc. (MISO) | 8.0 TWh | May 1979 | May 2026 | Refined Coal : 99.9% |
| Belle River | DTE Electric Company | China Twp, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.7 TWh | Oct 1981 | May 2026 | Subbituminous Coal : 78.5% Natural Gas : 21.1% |
| Greenwood (MI) | DTE Electric Company | Avoca, MI | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | Jun 1979 | May 2026 | Natural Gas |
| Catawba | Duke Energy Carolinas, LLC | York, SC | Duke Energy Carolinas (DUK) | 18.3 TWh | May 1985 | May 2026 | Nuclear |
| McGuire | Duke Energy Carolinas, LLC | Huntersville, NC | Duke Energy Carolinas (DUK) | 19.0 TWh | Aug 1981 | May 2026 | Nuclear |
| Beaver Valley | Energy Harbor Nuclear Generation LLC | Shippingport, PA | PJM Interconnection, LLC (PJM) | 14.5 TWh | Aug 1976 | May 2026 | Nuclear |
| H L Spurlock | East Kentucky Power Coop, Inc | Maysville, KY | PJM Interconnection, LLC (PJM) | 8.8 TWh | Aug 1977 | May 2026 | Bituminous Coal : 99.3% Tire-derived Fuels : 0.5% |
| Manatee | Florida Power & Light Co | Parrish, FL | Florida Power & Light Co. (FPL) | 7.2 TWh | Sep 1976 | May 2026 | Natural Gas |
| Martin | Florida Power & Light Co | Indiantown, FL | Florida Power & Light Co. (FPL) | 8.0 TWh | Nov 1980 | May 2026 | Natural Gas |
| St Lucie | Florida Power & Light Co | Jensen Beach, FL | Florida Power & Light Co. (FPL) | 15.4 TWh | Apr 1976 | May 2026 | Nuclear |
| Edwin I Hatch | Georgia Power Co | Baxley, GA | Southern Company Services, Inc. - Trans (SOCO) | 13.9 TWh | Nov 1975 | May 2026 | Nuclear |
| Big Cajun 2 | Louisiana Generating LLC | New Roads, LA | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 TWh | Jun 1981 | May 2026 | Subbituminous Coal : 69.2% Natural Gas : 30.8% |
| R D Morrow | Cooperative Energy | Purvis, MS | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 TWh | Mar 1978 | May 2026 | Natural Gas |
| Nearman Creek | City of Kansas City - (KS) | Kansas, KS | Southwest Power Pool (SWPP) | 1.3 TWh | May 1981 | May 2026 | Subbituminous Coal : 90.1% Natural Gas : 8.9% Distillate Fuel Oil : 1.0% |
| Iatan | Evergy Metro | Weston, MO | Southwest Power Pool (SWPP) | 4.9 TWh | Apr 1980 | May 2026 | Subbituminous Coal : 99.0% Distillate Fuel Oil : 1.0% |
| Jeffrey Energy Center | Evergy Kansas Central, Inc | St. Mary's, KS | Southwest Power Pool (SWPP) | 7.5 TWh | Jun 1978 | May 2026 | Subbituminous Coal : 99.8% |
| Trimble County | Louisville Gas & Electric Co | Bedford, KY | Louisville Gas and Electric Company and Kentucky Utilities Company (LGEE) | 8.6 TWh | Nov 1990 | May 2026 | Bituminous Coal : 70.5% Natural Gas : 17.9% Subbituminous Coal : 11.6% |
| Grand Gulf | System Energy Resources, Inc | Port Gibson, MS | Midcontinent Independent System Operator, Inc. (MISO) | 10.0 TWh | Jun 1985 | May 2026 | Nuclear |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |