Cedar Point Wind
63095 CR 21, Limon, CO 80828Plant Summary Information
Cedar Point Wind is ranked #23 out of 282 power plants in Colorado in terms of total annual net electricity generation.
Cedar Point Wind generated 171.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Cedar Point Wind |
|---|---|
| Utility Name | Cedar Point LLC |
| Location | Lincoln County, CO |
| Initial Operation Date | May 2011 |
| Last Update | Sep 2025 |
| Annual Generation | 671.2 GWh |
| Annual Consumption | 2.5 M MMBtu |
| Ranked #1,041 out of 12,539 Power Plants Nationwide | |
| Ranked #222 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #23 out of 282 Colorado Power Plants | |
| Ranked #9 out of 34 Colorado Wind Power Plants | |
| Fuel Types | Wind |
Map of Cedar Point Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Point Wind.
Monthly Net Generation for Cedar Point Wind
Cedar Point Wind Details
| Summary Information | |
|---|---|
| Plant Name | Cedar Point Wind (57315) |
| Plant Address | 63095 CR 21, Limon, CO 80828 |
| Utility | Cedar Point LLC (56662) |
| Latitude, Longitude | 39.42179, -103.67814 |
| Generation Dates on File | May 2011 to Sep 2025 |
| Initial Operation Date | May 2011 |
| Annual Generation | 671.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of Colorado (PSCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1-139 Details Operating May 2011
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 252 MW |
| Summer Capacity | 252 MW |
| Winter Capacity | 252 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2011 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 139 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 139 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V90-1.8 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 265 |
Cedar Point Wind Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Cedar Point LLC | 1100 Louisiana, Suite 3300, Houston, TX 77002 | 51.00% |
| Clover US Blocker LLC | 65 Queen St West, Suite No. 605, Toronto, ON M5H2M5 | 49.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #212 | Cedar Springs Wind IV | Douglas, WY | 683.4 GWh |
| #213 | Osborn Wind Energy | Stewartsville, MO | 680.9 GWh |
| #214 | Harvest Ridge Wind Farm | Newman, IL | 677.9 GWh |
| #215 | Raymond Wind Farm, LLC | Lyford, TX | 676.2 GWh |
| #216 | Patriot Wind Farm | Bishop, TX | 675.3 GWh |
| #217 | Wildcat Wind Farm I, LLC | Elwood, IN | 673.8 GWh |
| #218 | Streator Cayuga Ridge South | Odell, IL | 673.4 GWh |
| #219 | Bearkat | St. Lawrence, TX | 673.1 GWh |
| #220 | Griffin Trail Wind | E Seymour, TX | 672.9 GWh |
| #221 | Windy Flats Wind Project | Centerville, WA | 671.6 GWh |
| #223 | Seiling Wind I | Seiling, OK | 669.0 GWh |
| #224 | California Ridge Wind Energy LLC | Fithian, IL | 668.6 GWh |
| #225 | Ledyard Windpower, LLC | Lakota, IA | 668.2 GWh |
| #226 | El Algodon Alto Wind Farm, LLC | Mathis, TX | 668.2 GWh |
| #227 | South Plains Wind Phase I | Floydada, TX | 668.2 GWh |
| #228 | Broadview Energy JN, LLC | Texico, NM | 665.7 GWh |
| #229 | Chickasaw Wind Farm | New Hampton, IA | 660.3 GWh |
| #230 | Brazos Wind Farm | Fluvanna, TX | 658.7 GWh |
| #231 | Minonk Wind Farm | Minonk, IL | 651.1 GWh |
| #232 | Wildcat Ranch Wind Project | Morton, TX | 649.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Point Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bronco Plains Wind II, LLC | Kit Carson, CO | 688.5 GWh | 41.3 mi |
| Bronco Plains Wind, LLC | Flagler, CO | 1.1 TWh | 41.8 mi |
| Crossing Trails Wind Power Project LLC. | Seibert, CO | 396.7 GWh | 52.6 mi |
| Golden West Power Partners LLC | Calhan, CO | 805.3 GWh | 44.1 mi |
| Grazing Yak Solar | Calhan, CO | 77.7 GWh | 43.4 mi |
| Hunter Solar, LLC (CO) | Bennett, CO | 200.0 GWh | 44.3 mi |
| Limon Generating Station | Limon, CO | 216.3 GWh | 15.1 mi |
| Limon III Wind LLC | Limon, CO | 623.9 GWh | 11.9 mi |
| Limon Wind I | Limon, CO | 567.2 GWh | 6.3 mi |
| Limon Wind II | Limon, CO | 473.6 GWh | 7.6 mi |
| Oak Leaf - CSG Portfolio (OL 36) | Watkins, CO | 3.2 GWh | 48.2 mi |
| Oak Leaf - CSG Portfolio (OL 39) | Watkins, CO | 3.5 GWh | 48.1 mi |
| Oak Leaf Solar XXI (CSG) | Watkins, CO | 3.4 GWh | 51.6 mi |
| Oak Leaf Solar XXIV LLC (CSG) | Watkins, CO | 2.0 GWh | 49.3 mi |
| Oak Leaf Solar XXV LLC (CSG) | Watkins, CO | 3.6 GWh | 47.7 mi |
| Pioneer Solar (CO), LLC | Bennett, CO | 180.5 GWh | 47.7 mi |
| Quincy Solar (CO) | Watkins, CO | 3.4 GWh | 49.5 mi |
| Rush Creek Wind | Matheson, CO | 2.2 TWh | 19.4 mi |
| Titan Solar | Deer Trail, CO | 96.5 GWh | 25.6 mi |
| Victory Solar LLC | Bennett, CO | 29.2 GWh | 47.7 mi |