Quilt Block Wind Farm LLC
340 Donahoe Drive, Darlington, WI 53530Plant Summary Information
Quilt Block Wind Farm LLC is ranked #16 out of 240 power plants in Wisconsin in terms of total annual net electricity generation.
Quilt Block Wind Farm LLC generated 109.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Quilt Block Wind Farm LLC |
|---|---|
| Utility Name | Quilt Block Wind Farm LLC |
| Location | Lafayette County, WI |
| Initial Operation Date | September 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 381.1 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,651 out of 12,613 Power Plants Nationwide | |
| Ranked #475 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #16 out of 240 Wisconsin Power Plants | |
| Ranked #1 out of 13 Wisconsin Wind Power Plants | |
| Fuel Types | Wind |
Map of Quilt Block Wind Farm LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Quilt Block Wind Farm LLC.
Monthly Net Generation for Quilt Block Wind Farm LLC
Monthly Plant Fuel Consumption for Quilt Block Wind Farm LLC
Quilt Block Wind Farm LLC Details
| Summary Information | |
|---|---|
| Plant Name | Quilt Block Wind Farm LLC (57116) |
| Plant Address | 340 Donahoe Drive, Darlington, WI 53530 |
| Utility | Quilt Block Wind Farm LLC (56424) |
| Latitude, Longitude | 42.67333, -90.26528 |
| Generation Dates on File | Sep 2017 to Dec 2025 |
| Initial Operation Date | September 2017 |
| Annual Generation | 381.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | American Transmission Co (659) WI |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator GEN 1 Details Operating September 2017
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 98 MW |
| Summer Capacity | 98 MW |
| Winter Capacity | 98 MW |
| Minimum Load | 2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 49 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 49 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V110-2.0 |
| Design Wind Speed | 12 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 311 |
Quilt Block Wind Farm LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #465 | Shiloh I Wind Project | Rio Vista, CA | 389.6 GWh |
| #466 | Voyager Wind I | Mojave, CA | 388.9 GWh |
| #467 | Fenton Wind Farm | Chandler, MN | 387.9 GWh |
| #468 | Anticline Wind | Casper, WY | 386.9 GWh |
| #469 | New Frontier Wind | Ruso, ND | 386.8 GWh |
| #470 | Pegasus Wind | Reese, MI | 386.8 GWh |
| #471 | Cimarron Wind Energy LLC | Cimmaron, KS | 382.9 GWh |
| #472 | Pocahontas Prairie Wind Farm | Pomeroy, IA | 382.0 GWh |
| #473 | Wildhorse Mountain Wind Facility | Clayton, OK | 381.9 GWh |
| #474 | Baldwin Wind LLC | Wilton, ND | 381.1 GWh |
| #476 | Pine River Wind Park | Shepherd, MI | 380.6 GWh |
| #477 | Grand Meadow | Dexter, MN | 380.3 GWh |
| #478 | Lost Creek Wind Energy Facility | King City, MO | 380.3 GWh |
| #479 | Oliver Wind III, LLC | Mandan, ND | 380.1 GWh |
| #480 | Alta Wind X | Mojave, CA | 379.0 GWh |
| #481 | Trimont Area Wind Farm | Trimont, MN | 378.9 GWh |
| #482 | Prairie Winds SD1 | Crow Lake, SD | 378.9 GWh |
| #483 | Bluff Point Wind Facility | Portland, IN | 378.6 GWh |
| #484 | Victory Wind Farm | Westside, IA | 378.4 GWh |
| #485 | Stoneray Power Partners, LLC | Woodstock, MN | 377.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Quilt Block Wind Farm LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alliant SBD 9205 A Y McDonald | Dubuque, IA | 8.8 MWh | 27.5 mi |
| Alliant SBD 9301 Prairie Farms | Dubuque, IA | 86.2 MWh | 23.5 mi |
| Apple Canyon Lake Solar | Apple River, IL | 3.5 GWh | 16.9 mi |
| Argyle | Argyle, WI | 24.0 MWh | 20.2 mi |
| Badger Hollow I | Montfort, WI | 203.8 GWh | 19.3 mi |
| Badger Hollow II | Cobb, WI | 205.8 GWh | 19.3 mi |
| Bellevue | Bellevue, IA | 61.0 MWh | 30.3 mi |
| Dodds (CSG) | Lena, IL | 4.5 GWh | 29.6 mi |
| EcoGrove Wind LLC | Lena, IL | 258.0 GWh | 25 mi |
| Fennimore | Fennimore, WI | 27.0 MWh | 29.1 mi |
| Fennimore Solar | Fennimore, WI | 3.6 GWh | 28.8 mi |
| Gala (CSG) | Lena, IL | 4.9 GWh | 30.9 mi |
| Grant County | Town of Potosi, WI | 376.2 GWh | 22.4 mi |
| High Point Solar LLC | Lena, IL | 193.2 GWh | 24.7 mi |
| IGS Stockton DG CSG | Stockton, IL | 3.4 GWh | 25.9 mi |
| John Deere Dubuque Works | Dubuque, IA | 46.0 MWh | 22.8 mi |
| Lena | Lena, IL | 4.2 GWh | 29.2 mi |
| Montfort Wind Energy Center | Montfort, WI | 54.6 GWh | 20.9 mi |
| Red Barn Energy | Montfort, WI | 253.7 GWh | 21.2 mi |
| West Dubuque Solar | Dubuque, IA | 6.5 GWh | 29.6 mi |