Cedar Creek II
67125 CR 132, New Raymer, CO 80742Plant Summary Information
Cedar Creek II is ranked #26 out of 286 power plants in Colorado in terms of total annual net electricity generation.
Cedar Creek II generated 174.7 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Cedar Creek II |
|---|---|
| Utility Name | AE Power Services LLC |
| Location | Weld County, CO |
| Initial Operation Date | March 2011 |
| Last Update | Dec 2025 |
| Annual Generation | 606.9 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,131 out of 12,613 Power Plants Nationwide | |
| Ranked #269 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #26 out of 286 Colorado Power Plants | |
| Ranked #12 out of 34 Colorado Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
First Wind O&M, LLC (2013 to 2013) AE Power Services LLC (2014 to 2024) |
Map of Cedar Creek II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cedar Creek II.
Monthly Net Generation for Cedar Creek II
Monthly Plant Fuel Consumption for Cedar Creek II
Cedar Creek II Details
| Summary Information | |
|---|---|
| Plant Name | Cedar Creek II (57210) |
| Plant Address | 67125 CR 132, New Raymer, CO 80742 |
| Utility | AE Power Services LLC (55963) |
| Latitude, Longitude | 40.9475, -103.78389 |
| Generation Dates on File | Mar 2011 to Dec 2025 |
| Initial Operation Date | March 2011 |
| Annual Generation | 606.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 11-8-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Public Service Company of Colorado (PSCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Public Service Co of Colorado (15466) CO |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1 Details Operating March 2011
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 248.3 MW |
| Summer Capacity | 248.3 MW |
| Winter Capacity | 248.3 MW |
| Minimum Load | 1.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2011 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 122 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 122 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.4 |
Cedar Creek II Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| BP Wind Energy North America Inc | 201 Helios Way, Houston, TX 77079 | 50.00% |
| IRG Acquisition Holdings LLC | One South Wacker Drive, Suite 1800, Chicago, IL 60606 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #259 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
| #260 | Headwaters Wind Farm LLC | Winchester, IN | 617.8 GWh |
| #261 | Aragonne Wind LLC | Santa Rosa, NM | 614.6 GWh |
| #262 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
| #263 | Pattern Panhandle Wind 2 LLC | Panhandle, TX | 614.0 GWh |
| #264 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
| #265 | Golden Hill Wind | Wasco, OR | 610.9 GWh |
| #266 | Mesteno | Rio Grande City, TX | 609.9 GWh |
| #267 | Pioneer Hutt Wind Energy | Midland, TX | 609.4 GWh |
| #268 | Route 66 Wind Plant | Panhandle, TX | 608.2 GWh |
| #270 | Logans Gap Wind LLC | Comanche, TX | 604.0 GWh |
| #271 | Weatherford Wind Energy Center | Weatherford, OK | 602.5 GWh |
| #272 | Mountain Breeze Wind, LLC | Grover, CO | 599.0 GWh |
| #273 | Jumbo Hill Wind Project | Andrews, TX | 598.9 GWh |
| #274 | Ledyard Windpower, LLC | Lakota, IA | 595.9 GWh |
| #275 | Prairie Breeze | Elgin, NE | 595.7 GWh |
| #276 | Colorado Green Holdings LLC | Lamar, CO | 594.9 GWh |
| #277 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 594.1 GWh |
| #278 | Tatanka Ridge | Toronto, SD | 593.8 GWh |
| #279 | King Plains Wind Project | Garber, OK | 592.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cedar Creek II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| CBEP Solar 1, LLC | Sterling, CO | 10.7 GWh | 36.1 mi |
| Cedar Creek Wind | Grover, CO | 688.7 GWh | 12.9 mi |
| Kimball | Kimball, NE | 61.0 MWh | 21 mi |
| Kimball Wind | Kimball, NE | 121.0 GWh | 23 mi |
| Logan 1 Community Solar Array | Sterling, CO | 3.5 GWh | 40.8 mi |
| Logan Wind Energy | Peetz, CO | 557.0 GWh | 27.4 mi |
| Mountain Breeze Wind, LLC | Grover, CO | 599.0 GWh | 11.5 mi |
| Mtn Solar 6 LLC (CSG) | Sterling, CO | 3.9 GWh | 36.9 mi |
| Northern Colorado Wind LLC | Peetz, CO | 557.5 GWh | 46.4 mi |
| NSE Camber Solar PS11 LLC (CSG) | Sterling, CO | 3.9 GWh | 36.9 mi |
| NSE Camber Solar PS13 LLC (CSG) | Sterling, CO | 3.8 GWh | 39.8 mi |
| Panorama Wind, LLC | Grover, CO | 572.2 GWh | 6.5 mi |
| Peetz Table Wind Energy | Peetz, CO | 686.8 GWh | 18.3 mi |
| Pivot Solar 12 LLC(CSG) | Sterling, CO | 1.9 GWh | 36.9 mi |
| Pivot Solar 37 | Sterling, CO | 2.6 GWh | 36.6 mi |
| Ridge Crest Wind Partners | Peetz, CO | 51.4 GWh | 32.5 mi |
| Riverview Solar | Sterling, CO | 3.5 GWh | 39.2 mi |
| Spring Canyon | Peetz, CO | 154.4 GWh | 42.8 mi |
| Spring Canyon Expansion Wind Energy Ctr | Peetz, CO | 71.9 GWh | 36.9 mi |
| Sterling PV 3 | Sterling, CO | 3.8 GWh | 37.8 mi |