IP Radian, LLC
12224 FM 586 S, Brookesmith, TX 76827Plant Summary Information
IP Radian, LLC is ranked #48 out of 6,400 solar farms nationwide in terms of total annual net electricity generation.
IP Radian, LLC generated 196.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | IP Radian, LLC |
|---|---|
| Utility Name | IP Radian, LLC |
| Location | Brown County, TX |
| Initial Operation Date | May 2023 |
| Last Update | Sep 2025 |
| Annual Generation | 627.7 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #1,089 out of 12,539 Power Plants Nationwide | |
| Ranked #48 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #207 out of 799 Texas Power Plants | |
| Ranked #19 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of IP Radian, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for IP Radian, LLC.
Monthly Net Generation for IP Radian, LLC
IP Radian, LLC Details
| Summary Information | |
|---|---|
| Plant Name | IP Radian, LLC (64859) |
| Plant Address | 12224 FM 586 S, Brookesmith, TX 76827 |
| Utility | IP Radian, LLC (64370) |
| Latitude, Longitude | 31.5481, -99.1872 |
| Generation Dates on File | May 2023 to Sep 2025 |
| Initial Operation Date | May 2023 |
| Annual Generation | 627.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 21-248-000, 24-142-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator IPRAD Details Operating May 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | RADN_SLR_ALL |
| Nameplate Capacity | 320 MW |
| Summer Capacity | 320 MW |
| Winter Capacity | 320 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 415.5 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
IP Radian, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #38 | Copper Mountain Solar 5, LLC | Boulder City, NV | 688.1 GWh |
| #39 | Dunns Bridge II Solar | San Pierre, IN | 670.9 GWh |
| #40 | Aquamarine | Lemoore, CA | 679.2 GWh |
| #41 | Mount Signal Solar Farm V | Calexico, CA | 673.8 GWh |
| #42 | Silver State Solar Power South | Primm Valley, NV | 672.7 GWh |
| #43 | Prospero Solar II | Andrews, TX | 671.4 GWh |
| #44 | McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh |
| #45 | Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh |
| #46 | Arlington Energy Center II | Blythe, CA | 633.4 GWh |
| #47 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 609.1 GWh |
| #49 | Genesis Solar Energy Project | Blythe, CA | 623.0 GWh |
| #50 | Stateline Solar | Nipton, CA | 619.9 GWh |
| #51 | Victory Pass | Desert Center, CA | 609.7 GWh |
| #52 | Oberon II Solar Project | Desert Center, CA | 598.4 GWh |
| #53 | Arrow Canyon Solar Hybrid | Moapa, NV | 600.6 GWh |
| #54 | Moapa Southern Paiute | Moapa, NV | 613.1 GWh |
| #55 | Copper Mountain Solar 3 | Boulder City, NV | 607.4 GWh |
| #56 | Wadley Solar | Wadley, GA | 602.3 GWh |
| #57 | Hecate Energy Highland LLC | Buford, OH | 602.1 GWh |
| #58 | Blythe Mesa Solar II | Blythe, CA | 584.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding IP Radian, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BMP Wind (TX) | Baird, TX | 830.5 GWh | 51.6 mi |
| Cactus Flats Wind Energy Project | Eden, TX | 473.0 GWh | 58 mi |
| Castle Gap Wind | Goldthwaite, TX | 626.0 GWh | 49.9 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 515.5 GWh | 60.9 mi |
| Concho Valley Solar, LLC | San Angelo, TX | 301.0 GWh | 67.1 mi |
| Flat Top Wind I | Mullin, TX | 752.9 GWh | 35.6 mi |
| Galloway 1 Solar Farm | Paint Rock, TX | 539.8 GWh | 36.7 mi |
| Galloway 2 Solar Farm | Paint Rock, TX | 243.6 GWh | 42.8 mi |
| Goldthwaite Wind Energy Facility | Goldthwaite, TX | 433.6 GWh | 44 mi |
| Grizzly Ridge Solar | Hamilton County, TX | 137.3 GWh | 58.7 mi |
| Heart of Texas Wind Project | Brady, TX | 629.5 GWh | 25.2 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 68.7 mi |
| Lampwick | Hext, TX | 15.1 GWh | 51.1 mi |
| Logans Gap Wind LLC | Comanche, TX | 579.2 GWh | 34.8 mi |
| Maverick Creek Wind | Eden, TX | 1.5 TWh | 43.5 mi |
| Priddy Wind Project | Goldthwaite, TX | 987.2 GWh | 40.8 mi |
| Ranchland Wind Project I | Cisco, TX | 431.4 GWh | 52.6 mi |
| Ranchland Wind Project II | Cisco, TX | 491.6 GWh | 52.6 mi |
| Rattlesnake Power, LLC | Brady, TX | 572.2 GWh | 25.1 mi |
| Roadrunner Wind Farm | Cisco, TX | 914.8 GWh | 61.6 mi |