BMP Wind (TX)
TBD, Baird, TX 79504Plant Summary Information
BMP Wind (TX) is ranked #29 out of 231 wind farms in Texas in terms of total annual net electricity generation.
BMP Wind (TX) generated 236.6 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | BMP Wind (TX) |
|---|---|
| Utility Name | BMP Wind LLC |
| Location | Callahan County, TX |
| Initial Operation Date | December 2021 |
| Last Update | Aug 2026 |
| Annual Generation | 998.6 GWh |
| Annual Consumption | 3.6 M MMBtu |
| Ranked #756 out of 13,301 Power Plants Nationwide | |
| Ranked #72 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #129 out of 861 Texas Power Plants | |
| Ranked #29 out of 231 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of BMP Wind (TX)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for BMP Wind (TX).
Monthly Net Generation for BMP Wind (TX)
Monthly Plant Fuel Consumption for BMP Wind (TX)
BMP Wind (TX) Details
| Summary Information | |
|---|---|
| Plant Name | BMP Wind (TX) (62809) |
| Plant Address | TBD, Baird, TX 79504 |
| Utility | BMP Wind LLC (62659) |
| Latitude, Longitude | 32.28938, -99.2916 |
| Generation Dates on File | Dec 2021 to Aug 2026 |
| Initial Operation Date | December 2021 |
| Annual Generation | 998.6 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator BMP Details Operating December 2021
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 340 MW |
| Summer Capacity | 340 MW |
| Winter Capacity | 340 MW |
| Minimum Load | 23 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 68 |
| Turbine Details | |
| Number Of Turbines | 68 |
|---|---|
| Predominant Turbine Manufacturer | Siemens Gamesa |
| Predominant Turbine Model Number | SG 4.5-145 |
| Design Wind Speed | 14 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 303 |
BMP Wind (TX) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #62 | Deuel Harvest Wind Energy LLC | Clear Lake, SD | 1.1 TWh |
| #63 | Soldier Creek Wind | Corning, KS | 1.0 TWh |
| #64 | Priddy Wind Project | Goldthwaite, TX | 1.0 TWh |
| #65 | Thunder Ranch Wind Project | Marland, OK | 1.0 TWh |
| #66 | Rock Creek Wind Project | Tarkio, MO | 1.0 TWh |
| #67 | Skeleton Creek Energy Center Hybrid | Carrier, OK | 1.5 TWh |
| #68 | Triple H Wind Project | Highmore, SD | 1.0 TWh |
| #69 | Lincoln Land Wind | TBD, IL | 1.0 TWh |
| #70 | Dakota Range Wind | Marvin, SD | 1.0 TWh |
| #71 | Caddo Wind | Apache, OK | 1.0 TWh |
| #73 | Roadrunner Wind Farm | Cisco, TX | 996.9 GWh |
| #74 | Milligan 1 Wind Farm | Western, NE | 982.3 GWh |
| #75 | Solomon Forks Wind Project, LLC | Colby, KS | 980.1 GWh |
| #76 | Great Western Wind Energy, LLC | Arnett, OK | 976.5 GWh |
| #77 | Radfords Run Wind Farm | Maroa, IL | 972.0 GWh |
| #78 | Maverick Wind Project, LLC | Lahoma, OK | 971.3 GWh |
| #79 | Sapphire Sky Wind Energy LLC | Farmer City, IL | 969.6 GWh |
| #80 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 966.5 GWh |
| #81 | Pomeroy Wind Farm | Fonda, IA | 961.5 GWh |
| #82 | Nobles 2 Wind Project | Wilmont, MN | 958.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding BMP Wind (TX).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 480.8 GWh | 51.3 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 337.7 GWh | 47.2 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 158.7 GWh | 45 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 42.7 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 559.3 GWh | 12.3 mi |
| Hackberry Wind Farm | Albany, TX | 228.4 GWh | 34 mi |
| HEB00070 | Abilene, TX | 255.0 MWh | 29 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 45 mi |
| IP Radian, LLC | Brookesmith, TX | 593.3 GWh | 51.6 mi |
| La Casa Wind | Ranger, TX | 446.2 GWh | 43.1 mi |
| Logans Gap Wind LLC | Comanche, TX | 626.1 GWh | 47.7 mi |
| Mesquite Wind Power LLC | Abilene, TX | 332.7 GWh | 26 mi |
| Post Oak Wind LLC | Abilene, TX | 375.9 GWh | 26.4 mi |
| Ranchland Wind Project I | Cisco, TX | 455.4 GWh | 7.5 mi |
| Ranchland Wind Project II | Cisco, TX | 528.5 GWh | 7.6 mi |
| Roadrunner Wind Farm | Cisco, TX | 996.9 GWh | 14.8 mi |
| Sequoia 1 | Cisco, TX | 703.0 GWh | 12.9 mi |
| Silver Star I Wind Power Project | Dublin, TX | 204.9 GWh | 47.7 mi |
| South Trent Wind Farm | Sweetwater, TX | 272.3 GWh | 49.5 mi |
| WAL536 | Abilene, TX | 423.0 MWh | 27.2 mi |