Century Oak Wind Project, LLC
4405 FM 880N, Cisco, TX 76437Plant Summary Information
Century Oak Wind Project, LLC is ranked #111 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Century Oak Wind Project, LLC generated 135.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Century Oak Wind Project, LLC |
|---|---|
| Utility Name | Century Oak Wind Project, LLC |
| Location | Eastland County, TX |
| Initial Operation Date | July 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 525.8 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,293 out of 12,613 Power Plants Nationwide | |
| Ranked #345 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #262 out of 816 Texas Power Plants | |
| Ranked #111 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Century Oak Wind Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Century Oak Wind Project, LLC.
Monthly Net Generation for Century Oak Wind Project, LLC
Monthly Plant Fuel Consumption for Century Oak Wind Project, LLC
Century Oak Wind Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Century Oak Wind Project, LLC (67425) |
| Plant Address | 4405 FM 880N, Cisco, TX 76437 |
| Utility | Century Oak Wind Project, LLC (66200) |
| Latitude, Longitude | 32.42869, -99.15911 |
| Generation Dates on File | Jul 2024 to Dec 2025 |
| Initial Operation Date | July 2024 |
| Annual Generation | 525.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | DM-83999683v2 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator COAKW Details Operating July 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 151.5 MW |
| Summer Capacity | 151.5 MW |
| Winter Capacity | 151.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 45 |
| Turbine Details | |
| Number Of Turbines | 45 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 3.4-140 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 90 |
Century Oak Wind Project, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #335 | Blue Canyon Windpower II | Carnegie, OK | 543.1 GWh |
| #336 | FPL Energy Story Wind LLC | Zearing, IA | 537.8 GWh |
| #337 | South Fork Wind | East Hampton, NY | 536.3 GWh |
| #338 | Kossuth | Lu Verne, IA | 532.5 GWh |
| #339 | Broadview Energy KW, LLC | Texico, NM | 530.9 GWh |
| #340 | Astra Wind Farm | Happy, TX | 530.3 GWh |
| #341 | Fluvanna | Fluvanna, TX | 528.9 GWh |
| #342 | Panther Creek Wind Farm I | Big Spring, TX | 528.8 GWh |
| #343 | Elk City LLC | Sweetwater, OK | 527.1 GWh |
| #344 | TX Hereford Wind | Hereford, TX | 526.3 GWh |
| #346 | NaturEner Rim Rock Energy | Kevin, MT | 525.5 GWh |
| #347 | Chevelon Butte Phase 2 | Winslow, AZ | 525.5 GWh |
| #348 | Bruennings Breeze Wind Farm | Raymondville, TX | 524.9 GWh |
| #349 | Scioto Ridge Wind Farm | Belle Center, OH | 524.5 GWh |
| #350 | Thunder Spirit Wind, LLC | Hettinger, ND | 522.6 GWh |
| #351 | Chapman Ranch Wind I | Corpus Christi, TX | 518.0 GWh |
| #352 | North Hurlburt Wind LLC | Arlington, OR | 517.0 GWh |
| #353 | Minco Wind IV, LLC | Hinton, OK | 516.9 GWh |
| #354 | Spinning Spur Wind II | Adrian, TX | 516.4 GWh |
| #355 | Trent Wind Farm | Trent, TX | 515.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Century Oak Wind Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 503.7 GWh | 51.4 mi |
| Azure Sky Solar | Haskell, TX | 536.8 GWh | 48.8 mi |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 51.5 mi |
| BMP Wind (TX) | Baird, TX | 870.4 GWh | 12.3 mi |
| Buckthorn Wind | Mingus, TX | 359.6 GWh | 45.8 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 51.1 mi |
| Hackberry Wind Farm | Albany, TX | 325.7 GWh | 28 mi |
| HEB00070 | Abilene, TX | 231.0 MWh | 34.9 mi |
| La Casa Wind | Ranger, TX | 49.2 GWh | 31.5 mi |
| Logans Gap Wind LLC | Comanche, TX | 604.0 GWh | 50.1 mi |
| Mesquite Wind Power LLC | Abilene, TX | 346.3 GWh | 23.7 mi |
| OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh | 48 mi |
| Post Oak Wind LLC | Abilene, TX | 414.0 GWh | 29.6 mi |
| Ranchland Wind Project I | Cisco, TX | 437.2 GWh | 8.3 mi |
| Ranchland Wind Project II | Cisco, TX | 500.1 GWh | 8.3 mi |
| Roadrunner Wind Farm | Cisco, TX | 931.6 GWh | 3 mi |
| Sequoia 1 | Cisco, TX | 21.1 GWh | 0.7 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 40.3 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 31.6 mi |
| Young Wind | Graham, TX | 1.6 TWh | 50.9 mi |