Century Oak Wind Project, LLC
4405 FM 880N, Cisco, TX 76437Plant Summary Information
Century Oak Wind Project, LLC is ranked #109 out of 231 wind farms in Texas in terms of total annual net electricity generation.
Century Oak Wind Project, LLC generated 142.6 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Century Oak Wind Project, LLC |
|---|---|
| Utility Name | Century Oak Wind Project, LLC |
| Location | Eastland County, TX |
| Initial Operation Date | July 2024 |
| Last Update | Aug 2026 |
| Annual Generation | 559.3 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,261 out of 13,301 Power Plants Nationwide | |
| Ranked #340 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #261 out of 861 Texas Power Plants | |
| Ranked #109 out of 231 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Century Oak Wind Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Century Oak Wind Project, LLC.
Monthly Net Generation for Century Oak Wind Project, LLC
Monthly Plant Fuel Consumption for Century Oak Wind Project, LLC
Century Oak Wind Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Century Oak Wind Project, LLC (67425) |
| Plant Address | 4405 FM 880N, Cisco, TX 76437 |
| Utility | Century Oak Wind Project, LLC (66200) |
| Latitude, Longitude | 32.42869, -99.15911 |
| Generation Dates on File | Jul 2024 to Aug 2026 |
| Initial Operation Date | July 2024 |
| Annual Generation | 559.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | DM-83999683v2 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator COAKW Details Operating July 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 151.5 MW |
| Summer Capacity | 151.5 MW |
| Winter Capacity | 151.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 45 |
| Turbine Details | |
| Number Of Turbines | 45 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 3.4-140 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 90 |
Century Oak Wind Project, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #330 | Dusty Rose Wind | Stratton, CO | 568.0 GWh |
| #331 | Cedro Hill Wind LLC | Bruni, TX | 567.3 GWh |
| #332 | Logan Wind Energy | Peetz, CO | 566.6 GWh |
| #333 | Wheatridge East Wind | Lexington, OR | 565.9 GWh |
| #334 | Blue Canyon Windpower II | Carnegie, OK | 565.7 GWh |
| #335 | Colorado Green Holdings LLC | Lamar, CO | 564.0 GWh |
| #336 | North Fork Ridge Wind Energy Center | Mindenmines, MO | 561.7 GWh |
| #337 | Merricourt Wind Energy Center | Kulm, ND | 561.2 GWh |
| #338 | Echo Wind Park | Elkton, MI | 560.1 GWh |
| #339 | Kings Point Wind Energy Center | Golden City, MO | 559.6 GWh |
| #341 | Walnut Wind Farm | Walnut, IA | 558.3 GWh |
| #342 | Carroll Wind Farm | Carroll, IA | 556.6 GWh |
| #343 | Route 66 Wind Plant | Panhandle, TX | 552.5 GWh |
| #344 | Fluvanna | Fluvanna, TX | 551.6 GWh |
| #345 | Adair Wind Farm | Adair, IA | 551.2 GWh |
| #346 | New Mexico Wind Energy Center | House, NM | 548.8 GWh |
| #347 | High Trail Wind Farm LLC | Ellsworth, IL | 547.9 GWh |
| #348 | Wheatridge Hybrid | Morrow, OR | 663.0 GWh |
| #349 | Flat Ridge 5 | Harper, KS | 546.5 GWh |
| #350 | Intrepid | Schaller, IA | 546.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Century Oak Wind Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 480.8 GWh | 51.4 mi |
| Azure Sky Solar | Haskell, TX | 496.9 GWh | 48.8 mi |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.3 TWh | 51.5 mi |
| BMP Wind (TX) | Baird, TX | 998.6 GWh | 12.3 mi |
| Buckthorn Wind | Mingus, TX | 388.2 GWh | 45.8 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 51.1 mi |
| Hackberry Wind Farm | Albany, TX | 228.4 GWh | 28 mi |
| HEB00070 | Abilene, TX | 255.0 MWh | 34.9 mi |
| La Casa Wind | Ranger, TX | 446.2 GWh | 31.5 mi |
| Logans Gap Wind LLC | Comanche, TX | 626.1 GWh | 50.1 mi |
| Mesquite Wind Power LLC | Abilene, TX | 332.7 GWh | 23.7 mi |
| OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh | 48 mi |
| Post Oak Wind LLC | Abilene, TX | 375.9 GWh | 29.6 mi |
| Ranchland Wind Project I | Cisco, TX | 455.4 GWh | 8.3 mi |
| Ranchland Wind Project II | Cisco, TX | 528.5 GWh | 8.3 mi |
| Roadrunner Wind Farm | Cisco, TX | 996.9 GWh | 3 mi |
| Sequoia 1 | Cisco, TX | 703.0 GWh | 0.7 mi |
| Silver Star I Wind Power Project | Dublin, TX | 204.9 GWh | 40.3 mi |
| WAL536 | Abilene, TX | 423.0 MWh | 31.6 mi |
| Young Wind | Graham, TX | 1.6 TWh | 50.9 mi |