Maverick Creek Wind
Hwy 83, Eden, TX 76837Plant Summary Information
Maverick Creek Wind is ranked #15 out of 1,337 wind farms nationwide in terms of total annual net electricity generation.
Maverick Creek Wind generated 490.2 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Maverick Creek Wind |
---|---|
Utility Name | Algonquin Power Co |
Location | Concho County, TX |
Initial Operation Date | March 2022 |
Last Update | Feb 2024 |
Annual Generation | 1.6 TWh |
Annual Consumption | 5.3 M MMBtu |
Ranked #596 out of 11,455 Power Plants Nationwide | |
Ranked #15 out of 1,337 Wind Power Plants Nationwide | |
Ranked #83 out of 726 Texas Power Plants | |
Ranked #8 out of 217 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Maverick Creek Wind, LLC (2018 to 2018) Algonquin Power Co (2019 to 2022) |
Map of Maverick Creek Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Maverick Creek Wind.
Monthly Net Generation for Maverick Creek Wind
Maverick Creek Wind Details
Summary Information | |
---|---|
Plant Name | Maverick Creek Wind (62853) |
Plant Address | Hwy 83 Eden, TX 76837 |
Utility | Algonquin Power Co (59050) |
Latitude, Longitude | 31.26255, -99.84396 |
Generation Dates on File | Mar 2022 to Feb 2024 |
Initial Operation Date | March 2022 |
Annual Generation | 1.6 TWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator MVRCK Details Operating March 2022
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 491.6 MW |
Summer Capacity | 491.6 MW |
Winter Capacity | 491.6 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 127 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 127 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V150-4.2 |
Design Wind Speed | 16.7 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 344.5 |
Maverick Creek Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5 | Rush Creek Wind | Matheson, CO | 2.3 TWh |
#6 | Capricorn Ridge Wind LLC | Sterling City, TX | 2.1 TWh |
#7 | Hale Community Wind Farm | Plainview, TX | 2.1 TWh |
#8 | Cheyenne Ridge Wind Farm | Cheyenne Wells, CO | 2.0 TWh |
#9 | Aviator Wind | Robert Lee, TX | 2.0 TWh |
#10 | Orient Wind Farm | Orient, IA | 1.9 TWh |
#11 | White Mesa Wind | Ozona, TX | 1.9 TWh |
#12 | Highland Wind Project (IA) | Primghar, IA | 1.8 TWh |
#13 | Young Wind | Graham, TX | 1.7 TWh |
#14 | Rolling Hills Wind Farm | Massena, IA | 1.7 TWh |
#16 | Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh |
#17 | Clearwater Wind I | Miles City, MT | 1.4 TWh |
#18 | TB Flats | Medicine Bow, WY | 1.4 TWh |
#19 | Beaver Creek Wind | Ogden, IA | 1.4 TWh |
#20 | North English | Montezuma, IA | 1.4 TWh |
#21 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.4 TWh |
#22 | Santa Rita Wind Energy | Big Lake, TX | 1.3 TWh |
#23 | Inertia Wind Project | Haskell, TX | 1.3 TWh |
#24 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.3 TWh |
#25 | Ida Grove Wind | Ida Grove, IA | 1.3 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Maverick Creek Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aviator Wind | Robert Lee, TX | 2.0 TWh | 62.2 mi |
Bluebell Solar | Sterling City, TX | 81.0 GWh | 71.5 mi |
Bluebell Solar II | Sterling, TX | 304.1 GWh | 72.1 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 315.8 GWh | 72.4 mi |
Cactus Flats Wind Energy Project | Eden, TX | 503.0 GWh | 15 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 441.9 GWh | 72.7 mi |
Concho Valley Solar, LLC | San Angelo, TX | 350.6 GWh | 24.5 mi |
Galloway 1 Solar Farm | Paint Rock, TX | 593.8 GWh | 12.3 mi |
Galloway 2 Solar Farm | Paint Rock, TX | 76.8 GWh | 13.2 mi |
Goat Wind LP | Sterling City, TX | 271.4 GWh | 73.3 mi |
Heart of Texas Wind Project | Brady, TX | 668.6 GWh | 25 mi |
Holstein 1 Solar Farm | Wingate, TX | 434.5 GWh | 61.1 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 66.9 mi |
IP Radian, LLC | Brookesmith, TX | 621.7 GWh | 43.5 mi |
Lampwick | Hext, TX | 18.6 GWh | 32.5 mi |
Langford Wind Power | Christoval, TX | 606.4 GWh | 50.8 mi |
Live Oak Wind Project | Eldorado, TX | 817.9 GWh | 48.4 mi |
Rambler | San Angelo, TX | 476.6 GWh | 47.9 mi |
Rattlesnake Power, LLC | Brady, TX | 598.3 GWh | 18.5 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 348.7 GWh | 69.3 mi |