Flat Top Wind I
559 FM 218 W, Mullin, TX 76864Plant Summary Information
Flat Top Wind I is ranked #49 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Flat Top Wind I generated 227.9 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Flat Top Wind I |
|---|---|
| Utility Name | BHE Renewables, LLC |
| Location | Mills County, TX |
| Initial Operation Date | January 2018 |
| Last Update | Mar 2026 |
| Annual Generation | 796.4 GWh |
| Annual Consumption | 3.0 M MMBtu |
| Ranked #897 out of 12,332 Power Plants Nationwide | |
| Ranked #143 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #160 out of 814 Texas Power Plants | |
| Ranked #49 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Flat Top Wind I, LLC (2016 to 2020) BHE Renewables, LLC (2021 to 2024) |
Map of Flat Top Wind I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Flat Top Wind I.
Monthly Net Generation for Flat Top Wind I
Monthly Plant Fuel Consumption for Flat Top Wind I
Flat Top Wind I Details
| Summary Information | |
|---|---|
| Plant Name | Flat Top Wind I (61212) |
| Plant Address | 559 FM 218 W, Mullin, TX 76864 |
| Utility | BHE Renewables, LLC (59359) |
| Latitude, Longitude | 31.68451, -98.60336 |
| Generation Dates on File | Jan 2018 to Mar 2026 |
| Initial Operation Date | January 2018 |
| Annual Generation | 796.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG17-56-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator FTWI Details Operating January 2018
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 100 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 100 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V110-2.0 |
| Design Wind Speed | 15.5 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 312 |
Flat Top Wind I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #133 | Live Oak Wind Project | Eldorado, TX | 808.5 GWh |
| #134 | Tucannon River Wind Farm | Dayton, WA | 808.3 GWh |
| #135 | Eclipse Wind Farm | Adair, IA | 807.5 GWh |
| #136 | Lower Snake River Wind Energy Project | Pomeroy, WA | 806.7 GWh |
| #137 | Isabella Wind Park | Rosebush, MI | 805.7 GWh |
| #138 | Lundgren Wind Project | Otho, IA | 804.2 GWh |
| #139 | Niyol Wind, LLC | Fleming, CO | 803.9 GWh |
| #140 | Glaciers Edge Wind Project | Cleghorn, IA | 803.5 GWh |
| #141 | Wagon Wheel Wind | OK | 801.0 GWh |
| #142 | Las Majadas Wind Farm | Santa Monica, TX | 800.6 GWh |
| #144 | Nobles Wind Project | Reading, MN | 795.3 GWh |
| #145 | Southern Hills Wind Farm | Creston, IA | 793.7 GWh |
| #146 | Crowned Ridge Wind Energy Center | Watertown, SD | 792.2 GWh |
| #147 | Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 790.7 GWh |
| #148 | Oliver Wind IV | Hannover, ND | 791.5 GWh |
| #149 | Trinity Hills | Olney, TX | 788.0 GWh |
| #150 | Blue Creek Wind Project | Paulding, OH | 787.7 GWh |
| #151 | Ninnescah Wind Energy, LLC | Cunningham, KS | 785.8 GWh |
| #152 | Clearwater Wind East | Miles City, MT | 785.7 GWh |
| #153 | Diamond Spring, LLC | Sulphur, OK | 785.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Flat Top Wind I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BMP Wind (TX) | Baird, TX | 923.1 GWh | 58.1 mi |
| Buckthorn Wind | Mingus, TX | 364.8 GWh | 49.3 mi |
| Castle Gap Wind | Goldthwaite, TX | 630.2 GWh | 24.7 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 534.9 GWh | 60.9 mi |
| Goldthwaite Wind Energy Facility | Goldthwaite, TX | 433.6 GWh | 22.3 mi |
| Grizzly Ridge Solar | Hamilton County, TX | 126.1 GWh | 23.2 mi |
| Heart of Texas Wind Project | Brady, TX | 648.6 GWh | 57.1 mi |
| IP Radian, LLC | Brookesmith, TX | 652.8 GWh | 35.6 mi |
| Logans Gap Wind LLC | Comanche, TX | 614.8 GWh | 10.8 mi |
| Phantom Solar | Fort Hood, TX | 16.9 GWh | 59.6 mi |
| Priddy Wind Project | Goldthwaite, TX | 1.0 TWh | 11.4 mi |
| Ranchland Wind Project I | Cisco, TX | 446.6 GWh | 54.2 mi |
| Ranchland Wind Project II | Cisco, TX | 508.2 GWh | 54.2 mi |
| Rattlesnake Power, LLC | Brady, TX | 586.5 GWh | 60.2 mi |
| Roadrunner Wind Farm | Cisco, TX | 948.3 GWh | 59.9 mi |
| Sequoia 1 | Cisco, TX | 215.0 GWh | 61.4 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 45.8 mi |
| TPE Erath Solar, LLC | Stephenville, TX | 22.6 GWh | 46.2 mi |
| Walnut Springs Solar | Walnut Springs, TX | 8.4 GWh | 56 mi |
| Yellow Jacket | Meridian, TX | 10.0 GWh | 58.4 mi |