Ranchland Wind Project II
11004 FM 1864, Cisco, TX 76437Plant Summary Information
Ranchland Wind Project II is ranked #119 out of 226 wind farms in Texas in terms of total annual net electricity generation.
Ranchland Wind Project II generated 105.3 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Ranchland Wind Project II |
|---|---|
| Utility Name | Ranchland Wind Project II, LLC |
| Location | Callahan County, TX |
| Initial Operation Date | April 2024 |
| Last Update | Oct 2025 |
| Annual Generation | 492.9 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,352 out of 12,553 Power Plants Nationwide | |
| Ranked #368 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #275 out of 804 Texas Power Plants | |
| Ranked #119 out of 226 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Ranchland Wind Project II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ranchland Wind Project II.
Monthly Net Generation for Ranchland Wind Project II
Ranchland Wind Project II Details
| Summary Information | |
|---|---|
| Plant Name | Ranchland Wind Project II (64544) |
| Plant Address | 11004 FM 1864, Cisco, TX 76437 |
| Utility | Ranchland Wind Project II, LLC (64178) |
| Latitude, Longitude | 32.30852, -99.1642 |
| Generation Dates on File | Mar 2022 to Oct 2025 |
| Initial Operation Date | April 2024 |
| Annual Generation | 492.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG21-240-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WT2 Details Operating April 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 148 MW |
| Summer Capacity | 148 MW |
| Winter Capacity | 148 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 32 |
| Turbine Details | |
| Number Of Turbines | 32 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V162-5.6 |
| Design Wind Speed | 16.6 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 390.4 |
Ranchland Wind Project II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #358 | Lindahl Wind Project, LLC | Tioga, ND | 506.9 GWh |
| #359 | Green River Wind Farm | Deer Grove, IL | 506.0 GWh |
| #360 | Cardinal Point Wind | Sciota, IL | 504.2 GWh |
| #361 | Kings Point Wind Energy Center | Golden City, MO | 503.8 GWh |
| #362 | Papalote Creek II LLC | Taft, TX | 503.6 GWh |
| #363 | High Trail Wind Farm LLC | Ellsworth, IL | 502.6 GWh |
| #364 | Delta Wind Farm (MS) | Dundee, MS | 501.2 GWh |
| #365 | Elk City LLC | Sweetwater, OK | 499.3 GWh |
| #366 | Desert Sky | Iraan, TX | 496.7 GWh |
| #367 | Voyager Wind II | Mojave, CA | 496.4 GWh |
| #369 | New Mexico Wind Energy Center | House, NM | 492.2 GWh |
| #370 | Rocksprings | Del Rio, TX | 489.1 GWh |
| #371 | Meridian Wind Park | Merrill, MI | 488.9 GWh |
| #372 | Frontier Windpower | Newkirk, OK | 487.1 GWh |
| #373 | Mesquite Creek Wind | Lamesa, TX | 486.6 GWh |
| #374 | Richland (IA) | Odebolt, IA | 486.2 GWh |
| #375 | Grand Ridge Wind Energy Center | Marseilles, IL | 485.5 GWh |
| #376 | Cedar Springs III | Douglas, WY | 484.0 GWh |
| #377 | Limon Wind II | Limon, CO | 483.8 GWh |
| #378 | Langdon Renewables, LLC | Langdon, ND | 482.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ranchland Wind Project II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BMP Wind (TX) | Baird, TX | 831.9 GWh | 7.6 mi |
| Buckthorn Wind | Mingus, TX | 354.3 GWh | 46.1 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 54.7 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 52.4 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 50.1 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 516.2 GWh | 8.3 mi |
| Flat Top Wind I | Mullin, TX | 798.4 GWh | 54.2 mi |
| Hackberry Wind Farm | Albany, TX | 325.7 GWh | 35.2 mi |
| HEB00070 | Abilene, TX | 231.0 MWh | 35.7 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 52.6 mi |
| IP Radian, LLC | Brookesmith, TX | 634.8 GWh | 52.6 mi |
| Logans Gap Wind LLC | Comanche, TX | 585.6 GWh | 43.6 mi |
| Mesquite Wind Power LLC | Abilene, TX | 341.7 GWh | 29.1 mi |
| OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh | 55.4 mi |
| Post Oak Wind LLC | Abilene, TX | 406.3 GWh | 32 mi |
| R W Miller | Palo Pinto, TX | 799.8 GWh | 55.3 mi |
| Ranchland Wind Project I | Cisco, TX | 432.1 GWh | 0 mi |
| Roadrunner Wind Farm | Cisco, TX | 915.1 GWh | 9.5 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 40.2 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 33.3 mi |