Ranchland Wind Project II
11004 FM 1864, Cisco, TX 76437Plant Summary Information
Ranchland Wind Project II is ranked #110 out of 220 wind farms in Texas in terms of total annual net electricity generation.
Ranchland Wind Project II generated 134.8 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Ranchland Wind Project II |
---|---|
Utility Name | Ranchland Wind Project II, LLC |
Location | Callahan County, TX |
Initial Operation Date | Not Available |
Last Update | Mar 2025 |
Annual Generation | 493.9 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,310 out of 11,623 Power Plants Nationwide | |
Ranked #360 out of 1,344 Wind Power Plants Nationwide | |
Ranked #249 out of 769 Texas Power Plants | |
Ranked #110 out of 220 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Ranchland Wind Project II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ranchland Wind Project II.
Monthly Net Generation for Ranchland Wind Project II
Ranchland Wind Project II Details
Summary Information | |
---|---|
Plant Name | Ranchland Wind Project II (64544) |
Plant Address | 11004 FM 1864, Cisco, TX 76437 |
Utility | Ranchland Wind Project II, LLC (64178) |
Latitude, Longitude | 32.30852, -99.1642 |
Generation Dates on File | Mar 2022 to Mar 2025 |
Initial Operation Date | Not Available |
Annual Generation | 493.9 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG21-240-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Ranchland Wind Project II Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#350 | Slate Creek Wind Project LLC | Geuda Springs, KS | 512.0 GWh |
#351 | Osage Wind, LLC | Burbank, OK | 511.9 GWh |
#352 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 511.5 GWh |
#353 | Meridian Wind Park | Merrill, MI | 506.4 GWh |
#354 | Bruennings Breeze Wind Farm | Raymondville, TX | 506.3 GWh |
#355 | Montague Wind Power Facility LLC | Arlington, OR | 504.5 GWh |
#356 | Elk City LLC | Sweetwater, OK | 504.2 GWh |
#357 | Deerfield Wind Energy, LLC | Kinde, MI | 501.2 GWh |
#358 | Walleye Wind | Beaver Creek, MN | 497.0 GWh |
#359 | Voyager Wind II | Mojave, CA | 494.0 GWh |
#361 | Rockhaven Wind Project, LLC | Hennepin, OK | 493.6 GWh |
#362 | Limon Wind II | Limon, CO | 493.3 GWh |
#363 | Blue Summit Wind LLC | Vernon, TX | 492.6 GWh |
#364 | Ford County Wind Farm LLC | Ford County, IL | 492.4 GWh |
#365 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 490.1 GWh |
#366 | Flat Ridge 3 | Zenda, KS | 489.9 GWh |
#367 | Thunder Spirit Wind, LLC | Hettinger, ND | 487.7 GWh |
#368 | King Mountain Wind Ranch 1 | McCamey, TX | 486.8 GWh |
#369 | Bingham Wind | Bingham, ME | 485.4 GWh |
#370 | Heartland Farms | Middleton, MI | 484.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ranchland Wind Project II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BMP Wind (TX) | Baird, TX | 757.1 GWh | 7.6 mi |
Buckthorn Wind | Mingus, TX | 357.1 GWh | 46.1 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 292.1 GWh | 54.7 mi |
Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh | 52.4 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 394.7 GWh | 50.1 mi |
Century Oak Wind Project, LLC | Cisco, TX | 362.5 GWh | 8.3 mi |
Flat Top Wind I | Mullin, TX | 743.3 GWh | 54.2 mi |
Hackberry Wind Farm | Albany, TX | 352.4 GWh | 35.2 mi |
HEB00070 | Abilene, TX | 385.0 MWh | 35.7 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 52.6 mi |
IP Radian, LLC | Brookesmith, TX | 632.3 GWh | 52.6 mi |
Logans Gap Wind LLC | Comanche, TX | 578.7 GWh | 43.6 mi |
Mesquite Wind Power LLC | Abilene, TX | 355.3 GWh | 29.1 mi |
OCI Alamo 7 LLC | Haskell, TX | 250.2 GWh | 55.4 mi |
Post Oak Wind LLC | Abilene, TX | 408.2 GWh | 32 mi |
R W Miller | Palo Pinto, TX | 550.3 GWh | 55.3 mi |
Ranchland Wind Project I | Cisco, TX | 420.0 GWh | 0 mi |
Roadrunner Wind Farm | Cisco, TX | 666.3 GWh | 9.5 mi |
Silver Star I Wind Power Project | Dublin, TX | 186.1 GWh | 40.2 mi |
WAL536 | Abilene, TX | 362.0 MWh | 33.3 mi |