Ranchland Wind Project II
11004 FM 1864, Cisco, TX 76437Plant Summary Information
Ranchland Wind Project II is ranked #122 out of 224 wind farms in Texas in terms of total annual net electricity generation.
Ranchland Wind Project II generated 110.4 GWh during the 3-month period between May 2025 to August 2025.
| Plant Name | Ranchland Wind Project II |
|---|---|
| Utility Name | Ranchland Wind Project II, LLC |
| Location | Callahan County, TX |
| Initial Operation Date | April 2024 |
| Last Update | Aug 2025 |
| Annual Generation | 479.2 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,378 out of 12,529 Power Plants Nationwide | |
| Ranked #385 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #277 out of 795 Texas Power Plants | |
| Ranked #122 out of 224 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Ranchland Wind Project II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ranchland Wind Project II.
Monthly Net Generation for Ranchland Wind Project II
Ranchland Wind Project II Details
| Summary Information | |
|---|---|
| Plant Name | Ranchland Wind Project II (64544) |
| Plant Address | 11004 FM 1864, Cisco, TX 76437 |
| Utility | Ranchland Wind Project II, LLC (64178) |
| Latitude, Longitude | 32.30852, -99.1642 |
| Generation Dates on File | Mar 2022 to Aug 2025 |
| Initial Operation Date | April 2024 |
| Annual Generation | 479.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG21-240-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WT2 Details Operating April 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 148 MW |
| Summer Capacity | 148 MW |
| Winter Capacity | 148 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 32 |
| Turbine Details | |
| Number Of Turbines | 32 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V162-5.6 |
| Design Wind Speed | 16.6 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 390.4 |
Ranchland Wind Project II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #375 | Grant Plains Wind, LLC | Medford, OK | 489.2 GWh |
| #376 | Montague Wind Power Facility LLC | Arlington, OR | 488.7 GWh |
| #377 | Bingham Wind | Bingham, ME | 488.1 GWh |
| #378 | Grand Ridge Wind Energy Center | Marseilles, IL | 485.5 GWh |
| #379 | Walleye Wind | Beaver Creek, MN | 485.4 GWh |
| #380 | North Fork Ridge Wind Energy Center | Mindenmines, MO | 483.8 GWh |
| #381 | Limon Wind II | Limon, CO | 483.6 GWh |
| #382 | Rocksprings | Del Rio, TX | 482.8 GWh |
| #383 | Langdon Renewables, LLC | Langdon, ND | 482.4 GWh |
| #384 | Magic Valley Wind Farm I LLC | San Perlita, TX | 480.6 GWh |
| #386 | Heartland Farms | Middleton, MI | 478.6 GWh |
| #387 | Marble River Wind Farm | Churubusco, NY | 474.7 GWh |
| #388 | Adams Wind | Lenox, IA | 474.5 GWh |
| #389 | Prairie Queen Wind Farm | Moran, KS | 472.6 GWh |
| #390 | Ocotillo Express LLC | Ocotillo, CA | 472.2 GWh |
| #391 | Ford County Wind Farm LLC | Ford County, IL | 472.1 GWh |
| #392 | Rockhaven Wind Project, LLC | Hennepin, OK | 470.7 GWh |
| #393 | Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh |
| #394 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 469.6 GWh |
| #395 | Top of the World Windpower Project | Glenrock, WY | 469.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ranchland Wind Project II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BMP Wind (TX) | Baird, TX | 812.2 GWh | 7.6 mi |
| Buckthorn Wind | Mingus, TX | 344.7 GWh | 46.1 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 54.7 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 52.4 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 50.1 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 504.7 GWh | 8.3 mi |
| Flat Top Wind I | Mullin, TX | 750.1 GWh | 54.2 mi |
| Hackberry Wind Farm | Albany, TX | 325.7 GWh | 35.2 mi |
| HEB00070 | Abilene, TX | 231.0 MWh | 35.7 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 52.6 mi |
| IP Radian, LLC | Brookesmith, TX | 625.8 GWh | 52.6 mi |
| Logans Gap Wind LLC | Comanche, TX | 571.6 GWh | 43.6 mi |
| Mesquite Wind Power LLC | Abilene, TX | 336.5 GWh | 29.1 mi |
| OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh | 55.4 mi |
| Post Oak Wind LLC | Abilene, TX | 401.4 GWh | 32 mi |
| R W Miller | Palo Pinto, TX | 777.6 GWh | 55.3 mi |
| Ranchland Wind Project I | Cisco, TX | 419.8 GWh | 0 mi |
| Roadrunner Wind Farm | Cisco, TX | 906.2 GWh | 9.5 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 40.2 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 33.3 mi |