2401 US 283, Brady, TX 76825Plant Summary Information
Heart of Texas Wind Project is ranked #83 out of 229 wind farms in Texas in terms of total annual net electricity generation.
Heart of Texas Wind Project generated 154.8 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Heart of Texas Wind Project |
|---|---|
| Utility Name | Scout Clean Energy LLC |
| Location | McCulloch County, TX |
| Initial Operation Date | May 2020 |
| Last Update | Jul 2026 |
| Annual Generation | 629.4 GWh |
| Annual Consumption | 2.3 M MMBtu |
| Ranked #1,109 out of 13,285 Power Plants Nationwide | |
| Ranked #254 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #213 out of 856 Texas Power Plants | |
| Ranked #83 out of 229 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Heart of Texas Wind, LLC (2016 to 2016) Scout Clean Energy LLC (2019 to 2025) |
Map of Heart of Texas Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Heart of Texas Wind Project.
Monthly Net Generation for Heart of Texas Wind Project
Monthly Plant Fuel Consumption for Heart of Texas Wind Project
Heart of Texas Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Heart of Texas Wind Project (61032) |
| Plant Address | 2401 US 283, Brady, TX 76825 |
| Utility | Scout Clean Energy LLC (63074) |
| Latitude, Longitude | 31.24218, -99.42127 |
| Generation Dates on File | May 2020 to Jul 2026 |
| Initial Operation Date | May 2020 |
| Annual Generation | 629.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator HTX Details Operating May 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 180 MW |
| Summer Capacity | 180 MW |
| Winter Capacity | 180 MW |
| Minimum Load | 180 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 64 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 64 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 19.2 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 291.9 |
Heart of Texas Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #244 | South Hurlburt Wind LLC | Arlington, OR | 647.1 GWh |
| #245 | Glacier Sands Wind Power, LLC | Mason City, IL | 644.4 GWh |
| #246 | Headwaters Wind Farm LLC | Winchester, IN | 642.3 GWh |
| #247 | Cedar Creek Wind | Grover, CO | 641.8 GWh |
| #248 | Chickasaw Wind Farm | New Hampton, IA | 639.9 GWh |
| #249 | Brady Wind Energy Center | Dickinson, ND | 638.9 GWh |
| #250 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 637.8 GWh |
| #251 | Horseshoe Bend Wind LLC | Arlington, OR | 636.1 GWh |
| #252 | Brady II Wind Energy Center | Dickinson, ND | 635.0 GWh |
| #253 | Patriot Wind Farm | Bishop, TX | 629.9 GWh |
| #255 | Bloom Wind | Minneola, KS | 627.4 GWh |
| #256 | Kelly Creek Wind Project | Cabery, IL | 627.3 GWh |
| #257 | Beaver Creek Wind Facility | Big Timber, MT | 625.8 GWh |
| #258 | Gopher Creek Wind Farm | Fluvanna, TX | 625.1 GWh |
| #259 | Sweetwater Wind 4 LLC | Roscoe, TX | 624.3 GWh |
| #260 | Limon III Wind LLC | Limon, CO | 624.1 GWh |
| #261 | Mammoth Plains | Oakwood, OK | 623.0 GWh |
| #262 | Minonk Wind Farm | Minonk, IL | 622.9 GWh |
| #263 | Peyton Creek Wind Farm II | Bay City, TX | 622.7 GWh |
| #264 | Vienna Wind Farm | Marshalltown, IA | 621.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Heart of Texas Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Angelo Solar | San Angelo, TX | 484.1 GWh | 70.8 mi |
| BMP Wind (TX) | Baird, TX | 975.4 GWh | 72.8 mi |
| Buchanan Dam (TX) | Buchanan Dam, TX | 29.2 GWh | 68.5 mi |
| Cactus Flats Wind Energy Project | Eden, TX | 427.0 GWh | 37 mi |
| Castle Gap Wind | Goldthwaite, TX | 611.7 GWh | 63.5 mi |
| Concho Valley Solar, LLC | San Angelo, TX | 276.8 GWh | 49.3 mi |
| Flat Top Wind I | Mullin, TX | 790.6 GWh | 57.1 mi |
| Galloway 1 Solar Farm | Paint Rock, TX | 491.5 GWh | 25.9 mi |
| Galloway 2 Solar Farm | Paint Rock, TX | 225.0 GWh | 31.7 mi |
| Goldthwaite Wind Energy Facility | Goldthwaite, TX | 408.6 GWh | 57.2 mi |
| Inks | Buchanan Dam, TX | 14.3 GWh | 70.8 mi |
| IP Radian, LLC | Brookesmith, TX | 589.3 GWh | 25.2 mi |
| Lampwick | Hext, TX | 14.5 GWh | 26.5 mi |
| Live Oak Wind Project | Eldorado, TX | 809.4 GWh | 72.3 mi |
| Logans Gap Wind LLC | Comanche, TX | 605.5 GWh | 58.8 mi |
| Maverick Creek Wind | Eden, TX | 1.7 TWh | 25 mi |
| Norton Solar Farm | Bronte, TX | 244.7 GWh | 45.6 mi |
| Priddy Wind Project | Goldthwaite, TX | 1.0 TWh | 58.6 mi |
| Rambler | San Angelo, TX | 361.4 GWh | 72.1 mi |
| Rattlesnake Power, LLC | Brady, TX | 584.8 GWh | 11.2 mi |