Sequoia 1
TBD, Cisco, TX 76437Plant Summary Information
Sequoia 1 is ranked #30 out of 253 solar farms in Texas in terms of total annual net electricity generation.
Sequoia 1 generated 295.2 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Sequoia 1 |
|---|---|
| Utility Name | Sequoia 1 Solar Project |
| Location | Eastland County, TX |
| Initial Operation Date | December 2025 |
| Last Update | Jul 2026 |
| Annual Generation | 588.5 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,172 out of 13,285 Power Plants Nationwide | |
| Ranked #76 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #229 out of 856 Texas Power Plants | |
| Ranked #30 out of 253 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Sequoia 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sequoia 1.
Monthly Net Generation for Sequoia 1
Monthly Plant Fuel Consumption for Sequoia 1
Sequoia 1 Details
| Summary Information | |
|---|---|
| Plant Name | Sequoia 1 (68200) |
| Plant Address | TBD, Cisco, TX 76437 |
| Utility | Sequoia 1 Solar Project (66634) |
| Latitude, Longitude | 32.43824, -99.15766 |
| Generation Dates on File | Dec 2025 to Jul 2026 |
| Initial Operation Date | December 2025 |
| Annual Generation | 588.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SEQ1 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 401.4 MW |
| Summer Capacity | 401.4 MW |
| Winter Capacity | 401.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 60 |
| Tilt Angle | 60 |
| DC Net Capacity | 493.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sequoia 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #66 | Mount Signal Solar Farm V | Calexico, CA | 632.9 GWh |
| #67 | Silver State Solar Power South | Primm Valley, NV | 621.5 GWh |
| #68 | Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh |
| #69 | Wadley Solar | Wadley, GA | 619.6 GWh |
| #70 | Arrow Canyon Solar Hybrid | Moapa, NV | 602.0 GWh |
| #71 | Hecate Energy Longhorn Solar LLC | Jacksboro, TX | 610.7 GWh |
| #72 | Moapa Southern Paiute | Moapa, NV | 609.6 GWh |
| #73 | Copper Mountain Solar 3 | Boulder City, NV | 600.4 GWh |
| #74 | IP Radian, LLC | Brookesmith, TX | 589.3 GWh |
| #75 | Genesis Solar Energy Project | Blythe, CA | 588.6 GWh |
| #77 | Mojave Solar Project | Hinkley, CA | 588.4 GWh |
| #78 | Blythe Mesa Solar II | Blythe, CA | 568.7 GWh |
| #79 | Ray Ranch Solar | Pettus, TX | 580.5 GWh |
| #80 | Oberon II Solar Project | Desert Center, CA | 562.9 GWh |
| #81 | Oberon Solar Project | Desert Center, CA | 558.6 GWh |
| #82 | Victory Pass | Desert Center, CA | 562.8 GWh |
| #83 | Sun Valley Solar Project | Abbott, TX | 575.2 GWh |
| #84 | Cottonwood Bayou Solar | Liverpool, TX | 571.6 GWh |
| #85 | True North Solar, LLC | Otto, TX | 570.0 GWh |
| #86 | Texas Solar Nova 2 | Spur, TX | 570.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sequoia 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 496.4 GWh | 51.2 mi |
| Azure Sky Solar | Haskell, TX | 489.5 GWh | 48.3 mi |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 50.9 mi |
| BMP Wind (TX) | Baird, TX | 975.4 GWh | 12.9 mi |
| Buckthorn Wind | Mingus, TX | 373.4 GWh | 45.8 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 51.3 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 546.8 GWh | 0.7 mi |
| Hackberry Wind Farm | Albany, TX | 228.4 GWh | 27.5 mi |
| HEB00070 | Abilene, TX | 255.0 MWh | 35 mi |
| La Casa Wind | Ranger, TX | 398.6 GWh | 31.1 mi |
| Logans Gap Wind LLC | Comanche, TX | 605.5 GWh | 50.6 mi |
| Mesquite Wind Power LLC | Abilene, TX | 327.2 GWh | 23.4 mi |
| OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh | 47.5 mi |
| Post Oak Wind LLC | Abilene, TX | 371.9 GWh | 29.5 mi |
| Ranchland Wind Project I | Cisco, TX | 450.1 GWh | 9 mi |
| Ranchland Wind Project II | Cisco, TX | 517.1 GWh | 9 mi |
| Roadrunner Wind Farm | Cisco, TX | 974.6 GWh | 2.8 mi |
| Silver Star I Wind Power Project | Dublin, TX | 204.9 GWh | 40.4 mi |
| WAL536 | Abilene, TX | 423.0 MWh | 31.6 mi |
| Young Wind | Graham, TX | 1.6 TWh | 50.3 mi |