Sequoia 1
TBD, Cisco, TX 76437Plant Summary Information
Sequoia 1 is ranked #58 out of 251 solar farms in Texas in terms of total annual net electricity generation.
Sequoia 1 generated 262.7 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Sequoia 1 |
|---|---|
| Utility Name | Sequoia 1 Solar Project |
| Location | Eastland County, TX |
| Initial Operation Date | December 2025 |
| Last Update | Jun 2026 |
| Annual Generation | 477.6 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,408 out of 13,094 Power Plants Nationwide | |
| Ranked #139 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #296 out of 858 Texas Power Plants | |
| Ranked #58 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Sequoia 1
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sequoia 1.
Monthly Net Generation for Sequoia 1
Monthly Plant Fuel Consumption for Sequoia 1
Sequoia 1 Details
| Summary Information | |
|---|---|
| Plant Name | Sequoia 1 (68200) |
| Plant Address | TBD, Cisco, TX 76437 |
| Utility | Sequoia 1 Solar Project (66634) |
| Latitude, Longitude | 32.43824, -99.15766 |
| Generation Dates on File | Dec 2025 to Jun 2026 |
| Initial Operation Date | December 2025 |
| Annual Generation | 477.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SEQ1 Details Operating December 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 401.4 MW |
| Summer Capacity | 401.4 MW |
| Winter Capacity | 401.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 60 |
| Tilt Angle | 60 |
| DC Net Capacity | 493.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sequoia 1 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #129 | Bernard Creek Solar | Hungerford, TX | 492.5 GWh |
| #130 | Azure Sky Solar | Haskell, TX | 484.9 GWh |
| #131 | Scarlet Solar (CA) | Fresno, CA | 483.8 GWh |
| #132 | Noble Solar | Krum, TX | 487.1 GWh |
| #133 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 490.0 GWh |
| #134 | Proxima | Crows Landing, CA | 467.5 GWh |
| #135 | Townsite Solar Project Hybrid | Boulder City, NV | 468.6 GWh |
| #136 | Galloway 1 Solar Farm | Paint Rock, TX | 480.1 GWh |
| #137 | Angelo Solar | San Angelo, TX | 479.8 GWh |
| #138 | ENGIE Long Draw Solar LLC | Gail, TX | 478.8 GWh |
| #140 | Decatur Solar | Climax, GA | 475.2 GWh |
| #141 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
| #142 | Big Elm Solar | Troy, TX | 467.5 GWh |
| #143 | Estonian Solar Project, LLC | Cooper, TX | 455.9 GWh |
| #144 | Harquahala Sun Solar Project | Tonopah, AZ | 464.4 GWh |
| #145 | Golden Triangle | Lowndes, MS | 456.4 GWh |
| #146 | Taygete II Energy Project | Coyanosa, TX | 462.9 GWh |
| #147 | Hecate Energy Longhorn Solar LLC | Jacksboro, TX | 461.4 GWh |
| #148 | Sandrini Solar 200 | Mettler, CA | 457.7 GWh |
| #149 | Hornshadow Solar II, LLC | Castle Dale, UT | 456.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sequoia 1.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 493.6 GWh | 51.2 mi |
| Azure Sky Solar | Haskell, TX | 484.9 GWh | 48.3 mi |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 50.9 mi |
| BMP Wind (TX) | Baird, TX | 969.5 GWh | 12.9 mi |
| Buckthorn Wind | Mingus, TX | 373.9 GWh | 45.8 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 422.0 GWh | 51.3 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 547.3 GWh | 0.7 mi |
| Hackberry Wind Farm | Albany, TX | 228.4 GWh | 27.5 mi |
| HEB00070 | Abilene, TX | 255.0 MWh | 35 mi |
| La Casa Wind | Ranger, TX | 352.0 GWh | 31.1 mi |
| Logans Gap Wind LLC | Comanche, TX | 607.4 GWh | 50.6 mi |
| Mesquite Wind Power LLC | Abilene, TX | 328.8 GWh | 23.4 mi |
| OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh | 47.5 mi |
| Post Oak Wind LLC | Abilene, TX | 377.0 GWh | 29.5 mi |
| Ranchland Wind Project I | Cisco, TX | 451.9 GWh | 9 mi |
| Ranchland Wind Project II | Cisco, TX | 517.7 GWh | 9 mi |
| Roadrunner Wind Farm | Cisco, TX | 976.3 GWh | 2.8 mi |
| Silver Star I Wind Power Project | Dublin, TX | 204.9 GWh | 40.4 mi |
| WAL536 | Abilene, TX | 423.0 MWh | 31.6 mi |
| Young Wind | Graham, TX | 1.6 TWh | 50.3 mi |