Sun Valley Solar Project
884 HCR 3110 S, Abbott, TX 76621Plant Summary Information
Sun Valley Solar Project is ranked #34 out of 255 solar farms in Texas in terms of total annual net electricity generation.
Sun Valley Solar Project generated 200.9 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Sun Valley Solar Project |
|---|---|
| Utility Name | Sun Valley Solar LLC |
| Location | Hill County, TX |
| Initial Operation Date | December 2022 |
| Last Update | Aug 2026 |
| Annual Generation | 584.9 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,195 out of 13,301 Power Plants Nationwide | |
| Ranked #80 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #241 out of 861 Texas Power Plants | |
| Ranked #34 out of 255 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Sun Valley Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sun Valley Solar Project.
Monthly Net Generation for Sun Valley Solar Project
Monthly Plant Fuel Consumption for Sun Valley Solar Project
Sun Valley Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Sun Valley Solar Project (65303) |
| Plant Address | 884 HCR 3110 S, Abbott, TX 76621 |
| Utility | Sun Valley Solar LLC (64608) |
| Latitude, Longitude | 31.86976, -97.01498 |
| Generation Dates on File | Dec 2022 to Aug 2026 |
| Initial Operation Date | December 2022 |
| Annual Generation | 584.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SUNS Details Operating December 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 250 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 347.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Sun Valley Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #70 | Mount Signal Solar Farm V | Calexico, CA | 631.7 GWh |
| #71 | Hecate Energy Highland LLC | Buford, OH | 626.9 GWh |
| #72 | Wadley Solar | Wadley, GA | 626.7 GWh |
| #73 | Desert Sunlight 300, LLC | Desert Center, CA | 620.2 GWh |
| #74 | Silver State Solar Power South | Primm Valley, NV | 618.6 GWh |
| #75 | Arrow Canyon Solar Hybrid | Moapa, NV | 600.3 GWh |
| #76 | Moapa Southern Paiute | Moapa, NV | 606.8 GWh |
| #77 | Copper Mountain Solar 3 | Boulder City, NV | 596.4 GWh |
| #78 | IP Radian, LLC | Brookesmith, TX | 593.3 GWh |
| #79 | Blythe Mesa Solar II | Blythe, CA | 568.6 GWh |
| #81 | Ray Ranch Solar | Pettus, TX | 583.8 GWh |
| #82 | Mojave Solar Project | Hinkley, CA | 583.1 GWh |
| #83 | Genesis Solar Energy Project | Blythe, CA | 581.1 GWh |
| #84 | True North Solar, LLC | Otto, TX | 578.6 GWh |
| #85 | SR Toombs, LLC | Vidalia, GA | 578.2 GWh |
| #86 | Oberon II Solar Project | Desert Center, CA | 560.0 GWh |
| #87 | Hopkins Energy LLC | Dike, TX | 577.0 GWh |
| #88 | Oberon Solar Project | Desert Center, CA | 557.0 GWh |
| #89 | Texas Solar Nova 2 | Spur, TX | 574.3 GWh |
| #90 | Victory Pass | Desert Center, CA | 561.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sun Valley Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AbbVie Waco | Waco, TX | 1.3 GWh | 28.5 mi |
| Ash Creek Solar | Abbott, TX | 822.0 GWh | 2.4 mi |
| BPL Files Solar | Itasca, TX | 237.3 GWh | 22 mi |
| Griffin Solar | Robinson, TX | 4.1 GWh | 28.3 mi |
| Hill Solar 1 | Itasca, TX | 723.0 GWh | 18.8 mi |
| Hubbard Wind | Mt Calm, TX | 863.3 GWh | 12.8 mi |
| Hubbard Wind II | Malone, TX | 58.3 GWh | 9.3 mi |
| Limestone Wind Project | Coolidge, TX | 1.1 TWh | 22.9 mi |
| Markum Solar Farm | Valley Mills, TX | 372.2 GWh | 24.4 mi |
| Midpoint Solar, LLC | Blum, TX | 98.3 GWh | 25.7 mi |
| Pitts Dudik Solar | Hubbard, TX | 101.9 GWh | 8.4 mi |
| Pitts Dudik Solar II | Hubbard, TX | 33.5 GWh | 8.1 mi |
| PP Jaguar BESS LLC | Axtell, TX | 11.0 MWh | 18.8 mi |
| Prairie Hill Wind Project | Mart, TX | 94.0 GWh | 23 mi |
| Sandy Creek Energy Station | Riesel, TX | 3.2 TWh | 27.5 mi |
| Thad Hill Energy Center | Clifton, TX | 3.9 TWh | 20.2 mi |
| Three W Solar | Hillsboro, TX | 117.1 GWh | 16.2 mi |
| TPE Whitney Solar, LLC | Kopperl, TX | 15.0 GWh | 23.3 mi |
| Waco Solar | Mt Calm, TX | 839.8 GWh | 15.9 mi |
| Whitney | Clifton, TX | 66.9 GWh | 20.6 mi |