Ranchland Wind Project I
11004 FM 1864, Cisco, TX 76437Plant Summary Information
Ranchland Wind Project I is ranked #132 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Ranchland Wind Project I generated 118.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Ranchland Wind Project I |
|---|---|
| Utility Name | Ranchland Wind Project I, LLC |
| Location | Callahan County, TX |
| Initial Operation Date | April 2024 |
| Last Update | Dec 2025 |
| Annual Generation | 437.2 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,498 out of 12,613 Power Plants Nationwide | |
| Ranked #424 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #303 out of 816 Texas Power Plants | |
| Ranked #132 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Ranchland Wind Project I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ranchland Wind Project I.
Monthly Net Generation for Ranchland Wind Project I
Monthly Plant Fuel Consumption for Ranchland Wind Project I
Ranchland Wind Project I Details
| Summary Information | |
|---|---|
| Plant Name | Ranchland Wind Project I (64551) |
| Plant Address | 11004 FM 1864, Cisco, TX 76437 |
| Utility | Ranchland Wind Project I, LLC (64177) |
| Latitude, Longitude | 32.30852, -99.1645 |
| Generation Dates on File | Feb 2022 to Dec 2025 |
| Initial Operation Date | April 2024 |
| Annual Generation | 437.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lone Star Transmission, LLC (65090) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator WT2 Details Operating April 2024
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 114.9 MW |
| Summer Capacity | 114.9 MW |
| Winter Capacity | 114.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 31 |
| Turbine Details | |
| Number Of Turbines | 31 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V150-4.2 |
| Design Wind Speed | 16.5 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 344.5 |
Ranchland Wind Project I Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #414 | Wildcat Creek Wind Farm LLC | Gainesville, TX | 447.1 GWh |
| #415 | Canadian Hills Wind | El Rino, OK | 446.0 GWh |
| #416 | Buffalo Ridge Wind | Lake Benton, MN | 444.5 GWh |
| #417 | Shannon Wind | Windhorst, TX | 444.5 GWh |
| #418 | La Chalupa, LLC | Rio Hondo, TX | 443.6 GWh |
| #419 | Meadow Lake Wind Farm LLC | Lafayette, IN | 442.8 GWh |
| #420 | Glen Ullin Energy Center | Glen Ullin, ND | 439.3 GWh |
| #421 | Day County Wind LLC | Conde, SD | 439.2 GWh |
| #422 | Cactus Flats Wind Energy Project | Eden, TX | 439.1 GWh |
| #423 | Lake Benton II | Ruthton, MN | 437.9 GWh |
| #425 | Prairie Queen Wind Farm | Moran, KS | 435.3 GWh |
| #426 | Ocotillo Express LLC | Ocotillo, CA | 435.2 GWh |
| #427 | North Sky River Energy LLC | Weldon, CA | 435.0 GWh |
| #428 | Alta Wind Energy Center I | Mojave, CA | 434.7 GWh |
| #429 | Goldthwaite Wind Energy Facility | Goldthwaite, TX | 433.6 GWh |
| #430 | Sunflower Wind Project | Mandan, ND | 431.6 GWh |
| #431 | Bishop Hill III | Cambridge, IL | 428.7 GWh |
| #432 | Fowler Ridge IV Wind Farm LLC | Fowler, IN | 427.4 GWh |
| #433 | Heartland Divide Wind Project, LLC | Melville, IA | 425.8 GWh |
| #434 | Whispering Willow Wind Farm - East | Iowa Falls, IA | 425.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ranchland Wind Project I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BMP Wind (TX) | Baird, TX | 870.4 GWh | 7.5 mi |
| Buckthorn Wind | Mingus, TX | 359.6 GWh | 46.2 mi |
| Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 54.7 mi |
| Buffalo Gap Wind Farm | Merkel, TX | 179.0 GWh | 52.4 mi |
| Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 50.1 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 525.8 GWh | 8.3 mi |
| Flat Top Wind I | Mullin, TX | 786.6 GWh | 54.2 mi |
| Hackberry Wind Farm | Albany, TX | 325.7 GWh | 35.2 mi |
| HEB00070 | Abilene, TX | 231.0 MWh | 35.7 mi |
| Horse Hollow Wind Energy Center | Wingate, TX | 2.4 TWh | 52.6 mi |
| IP Radian, LLC | Brookesmith, TX | 657.7 GWh | 52.6 mi |
| La Casa Wind | Ranger, TX | 49.2 GWh | 36.3 mi |
| Logans Gap Wind LLC | Comanche, TX | 604.0 GWh | 43.6 mi |
| Mesquite Wind Power LLC | Abilene, TX | 346.3 GWh | 29.1 mi |
| Post Oak Wind LLC | Abilene, TX | 414.0 GWh | 32 mi |
| Ranchland Wind Project II | Cisco, TX | 500.1 GWh | 0 mi |
| Roadrunner Wind Farm | Cisco, TX | 931.6 GWh | 9.5 mi |
| Sequoia 1 | Cisco, TX | 21.1 GWh | 9 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 40.2 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 33.3 mi |