Castle Gap Wind
1435 FM 572 E, Goldthwaite, TX 76844Plant Summary Information
Castle Gap Wind is ranked #79 out of 222 wind farms in Texas in terms of total annual net electricity generation.
Castle Gap Wind generated 203.4 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Castle Gap Wind |
---|---|
Utility Name | Castle Gap Wind Power, LLC |
Location | Mills County, TX |
Initial Operation Date | October 2023 |
Last Update | May 2025 |
Annual Generation | 615.0 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,096 out of 12,312 Power Plants Nationwide | |
Ranked #255 out of 1,355 Wind Power Plants Nationwide | |
Ranked #203 out of 796 Texas Power Plants | |
Ranked #79 out of 222 Texas Wind Power Plants | |
Fuel Types | Wind |
Map of Castle Gap Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Castle Gap Wind.
Monthly Net Generation for Castle Gap Wind
Castle Gap Wind Details
Summary Information | |
---|---|
Plant Name | Castle Gap Wind (65790) |
Plant Address | 1435 FM 572 E, Goldthwaite, TX 76844 |
Utility | Castle Gap Wind Power, LLC (65044) |
Latitude, Longitude | 31.39376, -98.35936 |
Generation Dates on File | Jan 2023 to May 2025 |
Initial Operation Date | October 2023 |
Annual Generation | 615.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG22-87-000, EG22-88-000, EG22-89-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator CGWIN Details Operating October 2023
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
RTO ISO LMP Node Designation | AGUAYO_UNIT1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | AGUAYO_UNIT1 |
Nameplate Capacity | 196.8 MW |
Summer Capacity | 196.8 MW |
Winter Capacity | 196.8 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | October 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 41 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 41 |
---|---|
Predominant Turbine Manufacturer | Nordex |
Predominant Turbine Model Number | N149/4.0-4.5 |
Design Wind Speed | 17.5 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 324 |
Castle Gap Wind Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#245 | FPL Energy Illinois Wind LLC Hybrid | Shabbona, IL | 635.5 GWh |
#246 | Bloom Wind | Minneola, KS | 637.1 GWh |
#247 | Sweetwater Wind 4 LLC | Roscoe, TX | 634.7 GWh |
#248 | Brady Wind Energy Center | Dickinson, ND | 632.3 GWh |
#249 | Coyote Wind LLC | Snyder, TX | 627.9 GWh |
#250 | Bison 4 Wind Energy Center | New Salem, ND | 624.2 GWh |
#251 | Headwaters Wind Farm LLC | Winchester, IN | 622.9 GWh |
#252 | Pilot Hill Wind Farm | Herscher, IL | 618.3 GWh |
#253 | Cedar Creek II | New Raymer, CO | 615.3 GWh |
#254 | Tatanka Ridge | Toronto, SD | 615.2 GWh |
#256 | TX Hereford Wind | Hereford, TX | 614.1 GWh |
#257 | Border Winds Wind Farm | Rolla, ND | 614.0 GWh |
#258 | Carousel Wind Farm LLC | Burlington, CO | 613.9 GWh |
#259 | Cedar Springs II | Douglas, WY | 611.4 GWh |
#260 | Caney River Wind Project | Howard, KS | 609.3 GWh |
#261 | Moraine Sands Wind Power | Mason City, IL | 608.4 GWh |
#262 | Route 66 Wind Plant | Panhandle, TX | 608.2 GWh |
#263 | Chevelon Butte Wind Farm | Winslow, AZ | 605.7 GWh |
#264 | Pioneer Hutt Wind Energy | Midland, TX | 605.6 GWh |
#265 | Boswell Wind | Rock River, WY | 605.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Castle Gap Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buchanan Dam (TX) | Buchanan Dam, TX | 17.1 GWh | 44.6 mi |
Dileo Solar | Clifton, TX | 157.8 GWh | 56.7 mi |
Flat Top Wind I | Mullin, TX | 736.2 GWh | 24.7 mi |
Goldthwaite Wind Energy Facility | Goldthwaite, TX | 433.6 GWh | 6.4 mi |
Granite Shoals | Marble Falls, TX | 22.4 GWh | 57.9 mi |
Grizzly Ridge Solar | Hamilton County, TX | 167.2 GWh | 25.3 mi |
HEBTEMDistCenter2A | Temple, TX | 309.0 MWh | 61.3 mi |
Inks | Buchanan Dam, TX | 8.7 GWh | 45.8 mi |
IP Radian, LLC | Brookesmith, TX | 652.1 GWh | 49.9 mi |
Logans Gap Wind LLC | Comanche, TX | 578.7 GWh | 35.5 mi |
Marble Falls | Marble Falls, TX | 15.2 GWh | 58.2 mi |
Phantom Solar | Fort Hood, TX | 16.9 GWh | 36 mi |
Priddy Wind Project | Goldthwaite, TX | 971.4 GWh | 13.3 mi |
Thomas C Ferguson | Horseshoe Bay, TX | 3.6 TWh | 57.8 mi |
TPE Erath Solar, LLC | Stephenville, TX | 25.2 GWh | 60.7 mi |
WAL1232 | Belton, TX | 237.0 MWh | 57.5 mi |
WAL407 | Killeen, TX | 251.0 MWh | 42.7 mi |
WAL6929 | Temple, TX | 271.0 MWh | 59 mi |
Walnut Springs Solar | Walnut Springs, TX | 8.4 GWh | 58.7 mi |
Yellow Jacket | Meridian, TX | 10.0 GWh | 55.8 mi |