Cove Mountain Solar
TBD, Beryl, UT 84714Plant Summary Information
Cove Mountain Solar is ranked #36 out of 120 power plants in Utah in terms of total annual net electricity generation.
Cove Mountain Solar generated 45.1 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Cove Mountain Solar |
---|---|
Utility Name | Cove Mountain Solar LLC |
Location | Iron County, UT |
Initial Operation Date | November 2020 |
Last Update | May 2025 |
Annual Generation | 155.7 GWh |
Annual Consumption | 595.4 k MMBtu |
Ranked #2,720 out of 12,312 Power Plants Nationwide | |
Ranked #460 out of 6,191 Solar Power Plants Nationwide | |
Ranked #36 out of 120 Utah Power Plants | |
Ranked #20 out of 52 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Solar Project Development (2018 to 2018) Cove Mountain Solar LLC (2019 to 2024) |
Map of Cove Mountain Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Cove Mountain Solar.
Monthly Net Generation for Cove Mountain Solar
Cove Mountain Solar Details
Summary Information | |
---|---|
Plant Name | Cove Mountain Solar (62469) |
Plant Address | TBD, Beryl, UT 84714 |
Utility | Cove Mountain Solar LLC (62802) |
Latitude, Longitude | 37.62312, -113.61922 |
Generation Dates on File | Jun 2020 to May 2025 |
Initial Operation Date | November 2020 |
Annual Generation | 155.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN01 Details Operating November 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 58 MW |
Summer Capacity | 58 MW |
Winter Capacity | 58 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 2 |
DC Net Capacity | 74.3 MW |
Crystalline Silicon | No |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Cove Mountain Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#450 | West Memphis Solar Station | Crawfordsville, AR | 157.8 GWh |
#451 | Dileo Solar | Clifton, TX | 157.8 GWh |
#452 | Willow Solar Energy Center | Myakka City, FL | 157.7 GWh |
#453 | Huntley | Bowman, SC | 157.5 GWh |
#454 | Three Corners Solar | Unity, ME | 157.5 GWh |
#455 | Pineapple | Port St Lucie, FL | 156.5 GWh |
#456 | Sandrini Solar 200 | Mettler, CA | 156.4 GWh |
#457 | RE Astoria 2 | Rosamond, CA | 156.3 GWh |
#458 | Silver Palm | TBD, FL | 156.1 GWh |
#459 | Gutenberg Solar | Garysburg, NC | 155.9 GWh |
#461 | Stuttgart Solar | Stuttgart, AR | 155.3 GWh |
#462 | High Springs Solar Power Plant | High Springs, FL | 155.0 GWh |
#463 | Powells Creek Solar - Hybrid | Alton, VA | 154.8 GWh |
#464 | Columbia Solar Power Plant | Fort White, FL | 154.7 GWh |
#465 | CPV Maple Hill Solar | Portage, PA | 153.7 GWh |
#466 | Regulus Solar Project | Bakersfield, CA | 153.6 GWh |
#467 | Harvest Gold Solar | Indianola, MS | 153.4 GWh |
#468 | Chaves Solar, LLC | Roswell, NM | 153.4 GWh |
#469 | Wilkinson Solar LLC | Pantego, NC | 153.3 GWh |
#470 | Bay Trail Solar Power Plant | Crystal River, FL | 153.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Cove Mountain Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 79.7 GWh | 30.4 mi |
Beryl Solar Plant | Beryl, UT | 6.3 GWh | 1.8 mi |
Cedar Valley Solar Plant | Cedar City, UT | 6.0 GWh | 31.6 mi |
Cove Mountain Solar 2 | Beryl, UT | 313.2 GWh | 1.4 mi |
Enterprise Solar, LLC | Newcastle, UT | 225.6 GWh | 1.3 mi |
Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh | 21.8 mi |
Fiddler's Canyon #2 | Cedar City, UT | 7.4 GWh | 21.8 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.5 GWh | 23.3 mi |
Granite Mountain Solar East, LLC | Cedar City, UT | 206.9 GWh | 23.9 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 125.5 GWh | 20.3 mi |
Hurricane City Power | Hurricane, UT | 7.4 GWh | 35 mi |
Iron Springs Solar, LLC | Cedar City, UT | 215.8 GWh | 26.5 mi |
Quail Creek Hydro Plant #1 | Hurricane, UT | 8.6 GWh | 33.5 mi |
Quichapa 1 | Cedar City, UT | 6.6 GWh | 22.2 mi |
Quichapa 2 | Cedar City, UT | 5.8 GWh | 23.7 mi |
Quichapa 3 | Cedar City, UT | 7.0 GWh | 21 mi |
St George Red Rock | St George, UT | 178.0 MWh | 35.3 mi |
Three Peaks Power | Cedar City, UT | 228.0 GWh | 29.9 mi |
Veyo Heat Recovery Project | Gunlock, UT | 39.0 GWh | 20.6 mi |
Washington City Electric Generation | Washington, UT | 5.7 GWh | 33.8 mi |