Blue Jay Solar I, LLC
16061 County Road 164, Iola, TX 77861Plant Summary Information
Blue Jay Solar I, LLC is ranked #38 out of 194 solar farms in Texas in terms of total annual net electricity generation.
Blue Jay Solar I, LLC generated 128.8 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Blue Jay Solar I, LLC |
---|---|
Utility Name | Blue Jay Solar I, LLC |
Location | Grimes County, TX |
Initial Operation Date | June 2023 |
Last Update | Jun 2025 |
Annual Generation | 450.9 GWh |
Annual Consumption | 1.7 M MMBtu |
Ranked #1,423 out of 12,327 Power Plants Nationwide | |
Ranked #101 out of 6,200 Solar Power Plants Nationwide | |
Ranked #283 out of 799 Texas Power Plants | |
Ranked #38 out of 194 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Blue Jay Solar I, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Jay Solar I, LLC.
Monthly Net Generation for Blue Jay Solar I, LLC
Blue Jay Solar I, LLC Details
Summary Information | |
---|---|
Plant Name | Blue Jay Solar I, LLC (64672) |
Plant Address | 16061 County Road 164, Iola, TX 77861 |
Utility | Blue Jay Solar I, LLC (64266) |
Latitude, Longitude | 30.70533, -96.06983 |
Generation Dates on File | Jun 2023 to Jun 2025 |
Initial Operation Date | June 2023 |
Annual Generation | 450.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 21-242-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 138.00 kV |
Energy Storage | Yes |
Generator BLUEJ Details Operating June 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 51.6 MW |
Summer Capacity | 51.6 MW |
Winter Capacity | 51.6 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 84.5 |
---|---|
Maximum Charge Rate | 50 MW |
Maximum Discharge Rate | 50 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 81 |
Storage Enclosure Type | CS |
Arbitrage | P |
Frequency Regulation | Yes |
Voltage Or Reactive Power Support | Yes |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Blue Jay Solar I, LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#91 | Atrisco Solar LLC | Rio Rancho, NM | 493.1 GWh |
#92 | Bernard Creek Solar | Hungerford, TX | 483.2 GWh |
#93 | Proxima | Crows Landing, CA | 454.0 GWh |
#94 | Noble Solar | Krum, TX | 472.3 GWh |
#95 | Townsite Solar Project Hybrid | Boulder City, NV | 456.5 GWh |
#96 | Fort Bend Solar LLC | East Bernard, TX | 469.5 GWh |
#97 | Taygete Energy Project LLC | Coyanosa, TX | 466.1 GWh |
#98 | Hornet Solar (TX) | Tulia, TX | 462.6 GWh |
#99 | Techren Solar II LLC | Boulder, NV | 462.4 GWh |
#100 | Horizon Solar | Pearsall, TX | 459.9 GWh |
#102 | Mesquite Solar 3, LLC | Tonopah, AZ | 455.1 GWh |
#103 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 453.4 GWh |
#104 | Taygete II Energy Project | Coyanosa, TX | 452.5 GWh |
#105 | Mammoth North Solar | Knox, IN | 450.6 GWh |
#106 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
#107 | Chaparral Springs | Rosamond, CA | 438.7 GWh |
#108 | Pike Solar Hybrid | Fountain, CO | 439.8 GWh |
#109 | Pleinmont Solar 2 | Spotsylvania, VA | 435.7 GWh |
#110 | Oak Ridge Solar | Oak Ridge, LA | 434.7 GWh |
#111 | Misae Solar | Childress, TX | 427.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Jay Solar I, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Bryan (TX) | Bryan, TX | 1.5 GWh | 18.4 mi |
Central Utility Plant - Texas A&M | College Station, TX | 92.5 GWh | 17.3 mi |
Dansby | Bryan, TX | 149.9 GWh | 23.3 mi |
HEB00020 | Cypress, TX | 254.0 MWh | 52.9 mi |
HEB00099 | Houston, TX | 345.0 MWh | 57.2 mi |
HEB00767 | Magnolia, TX | 165.0 MWh | 40.7 mi |
Lewis Creek | Willis, TX | 2.0 TWh | 37.6 mi |
Limestone | Jewett, TX | 7.6 TWh | 50.7 mi |
Major Oak Power | Bremond, TX | 2.2 TWh | 45.7 mi |
Montgomery County | Willis, TX | 6.5 TWh | 37.1 mi |
Oak Grove (TX) | Franklin, TX | 11.2 TWh | 41.1 mi |
Orion II Solar Project | Rosebud, TX | 390.4 GWh | 56 mi |
OTHERTexasA&M | Bryan, TX | 1.3 GWh | 23.7 mi |
Security | Cleveland, TX | 6.2 GWh | 54.6 mi |
Tenaska Frontier Generation Station | Shiro, TX | 3.3 TWh | 11.9 mi |
WAL3390 | The Woodlands, TX | 282.0 MWh | 45.7 mi |
WAL5045 | Tomball, TX | 314.0 MWh | 55.5 mi |
WAL5091 | Cypress, TX | 288.0 MWh | 55.1 mi |
WAL5287 | Spring, TX | 226.0 MWh | 54.6 mi |
WAL602 | Spring, TX | 223.0 MWh | 54.2 mi |