Blue Jay Solar I, LLC
16061 County Road 164, Iola, TX 77861Plant Summary Information
Blue Jay Solar I, LLC is ranked #52 out of 210 solar farms in Texas in terms of total annual net electricity generation.
Blue Jay Solar I, LLC generated 112.4 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Blue Jay Solar I, LLC |
|---|---|
| Utility Name | Blue Jay Solar I, LLC |
| Location | Grimes County, TX |
| Initial Operation Date | June 2023 |
| Last Update | Nov 2025 |
| Annual Generation | 443.6 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,475 out of 12,574 Power Plants Nationwide | |
| Ranked #132 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #300 out of 810 Texas Power Plants | |
| Ranked #52 out of 210 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Blue Jay Solar I, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Jay Solar I, LLC.
Monthly Net Generation for Blue Jay Solar I, LLC
Blue Jay Solar I, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Blue Jay Solar I, LLC (64672) |
| Plant Address | 16061 County Road 164, Iola, TX 77861 |
| Utility | Blue Jay Solar I, LLC (64266) |
| Latitude, Longitude | 30.70533, -96.06983 |
| Generation Dates on File | Jun 2023 to Nov 2025 |
| Initial Operation Date | June 2023 |
| Annual Generation | 443.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 21-242-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator BLUEJ Details Operating June 2023
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 51.6 MW |
| Summer Capacity | 51.6 MW |
| Winter Capacity | 51.6 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 84.5 |
|---|---|
| Maximum Charge Rate | 50 MW |
| Maximum Discharge Rate | 50 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 81 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Voltage Or Reactive Power Support | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Blue Jay Solar I, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #122 | Townsite Solar Project Hybrid | Boulder City, NV | 457.6 GWh |
| #123 | Horizon Solar | Pearsall, TX | 463.1 GWh |
| #124 | Box Canyon (AZ) | Florence, AZ | 460.2 GWh |
| #125 | Hecate Energy Outpost Solar LLC | Laredo, TX | 457.7 GWh |
| #126 | Taygete II Energy Project | Coyanosa, TX | 457.7 GWh |
| #127 | Big Elm Solar | Troy, TX | 457.4 GWh |
| #128 | White Wing Solar | Yuma, AZ | 456.6 GWh |
| #129 | Sparta Solar | Pawnee, TX | 454.2 GWh |
| #130 | Hardin Solar III | Alger, OH | 452.0 GWh |
| #131 | Fighting Jays Solar Project | Needville, TX | 449.8 GWh |
| #133 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 449.1 GWh |
| #134 | Orion I Solar Project | Burlington, TX | 448.7 GWh |
| #135 | Pike Solar Hybrid | Fountain, CO | 447.5 GWh |
| #136 | Matrix Pleasant Valley | Boise, ID | 445.7 GWh |
| #137 | Mesquite Solar 3, LLC | Tonopah, AZ | 444.1 GWh |
| #138 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #139 | Tres Bahias | Port Lavaca, TX | 438.4 GWh |
| #140 | Hickory Park Solar Hybrid | Camilla, GA | 434.0 GWh |
| #141 | Pleinmont Solar 2 | Spotsylvania, VA | 438.0 GWh |
| #142 | Chaparral Springs | Rosamond, CA | 418.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Jay Solar I, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bryan (TX) | Bryan, TX | 1.5 GWh | 18.4 mi |
| Central Utility Plant - Texas A&M | College Station, TX | 119.2 GWh | 17.3 mi |
| Dansby | Bryan, TX | 149.9 GWh | 23.3 mi |
| Diver Solar, LLC | Thornton, TX | 130.2 GWh | 42.1 mi |
| HEB00020 | Cypress, TX | 254.0 MWh | 52.9 mi |
| HEB00594 | The Woodlands, TX | 279.0 MWh | 48.2 mi |
| HEB00767 | Magnolia, TX | 165.0 MWh | 40.7 mi |
| Lewis Creek | Willis, TX | 1.9 TWh | 37.6 mi |
| Limestone | Jewett, TX | 7.9 TWh | 50.7 mi |
| Major Oak Power | Bremond, TX | 2.2 TWh | 45.7 mi |
| Montgomery County | Willis, TX | 6.0 TWh | 37.1 mi |
| Oak Grove (TX) | Franklin, TX | 11.1 TWh | 41.1 mi |
| OTHERTexasA&M | Bryan, TX | 1.3 GWh | 23.7 mi |
| Security | Cleveland, TX | 6.2 GWh | 54.6 mi |
| Tenaska Frontier Generation Station | Shiro, TX | 3.5 TWh | 11.9 mi |
| WAL3390 | The Woodlands, TX | 282.0 MWh | 45.7 mi |
| WAL5045 | Tomball, TX | 314.0 MWh | 55.5 mi |
| WAL5091 | Cypress, TX | 288.0 MWh | 55.1 mi |
| WAL5287 | Spring, TX | 226.0 MWh | 54.6 mi |
| WAL602 | Spring, TX | 223.0 MWh | 54.2 mi |