Harquahala Sun Solar Project
TBD, Tonopah, AZ 85354Plant Summary Information
Harquahala Sun Solar Project is ranked #27 out of 115 solar farms in Arizona in terms of total annual net electricity generation.
Harquahala Sun Solar Project generated 136.3 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Harquahala Sun Solar Project |
|---|---|
| Utility Name | Copia Power |
| Location | Maricopa County, AZ |
| Initial Operation Date | Not Available |
| Last Update | Sep 2025 |
| Annual Generation | 228.0 GWh |
| Annual Consumption | 777.8 k MMBtu |
| Ranked #2,307 out of 12,539 Power Plants Nationwide | |
| Ranked #356 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #58 out of 168 Arizona Power Plants | |
| Ranked #27 out of 115 Arizona Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Harquahala Sun Solar Project (2022 to 2023) Copia Power (2024 to 2024) |
Map of Harquahala Sun Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harquahala Sun Solar Project.
Monthly Net Generation for Harquahala Sun Solar Project
Harquahala Sun Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Harquahala Sun Solar Project (66670) |
| Plant Address | TBD, Tonopah, AZ 85354 |
| Utility | Copia Power (66217) |
| Latitude, Longitude | 33.44065, -113.1352 |
| Generation Dates on File | May 2025 to Sep 2025 |
| Initial Operation Date | Not Available |
| Annual Generation | 228.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Arizona Public Service Company (AZPS) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Arizona Public Service Co (803) AZ |
| Grid Voltage | 500.00 kV |
| Energy Storage | No |
Harquahala Sun Solar Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Copia Power | 24853 Del Prado, Dana Point, CA 92629 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #346 | Wagyu | Damon, TX | 232.0 GWh |
| #347 | Desert Harvest, LLC | Desert Center, CA | 231.7 GWh |
| #348 | Ivanpah 3 | Nipton, CA | 240.8 GWh |
| #349 | Prairie State Solar Project | Swanwick Township, IL | 231.1 GWh |
| #350 | San Pablo Raceway | Lancaster, CA | 231.0 GWh |
| #351 | Comanche Solar | Pueblo, CO | 230.4 GWh |
| #352 | Albemarle Beach Solar | Roper, NC | 229.9 GWh |
| #353 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 226.3 GWh |
| #354 | SR Arlington II | Blakely, GA | 228.4 GWh |
| #355 | Swift Air Solar I | Goldsmith, TX | 228.1 GWh |
| #357 | Walnut Bend Solar Station PV | Moro, AR | 227.5 GWh |
| #358 | Alamo 6 | Fort Stockton, TX | 227.3 GWh |
| #359 | SR Clay, LLC | Fort Gaines, GA | 227.1 GWh |
| #360 | Assembly Solar II LLC | Lennon, MI | 226.8 GWh |
| #361 | Lapetus | Andrews, TX | 226.2 GWh |
| #362 | Three Peaks Power | Cedar City, UT | 225.8 GWh |
| #363 | Prairie Mist Solar | Montrose, AR | 225.1 GWh |
| #364 | Blue Bird Solar, LLC | Warrenton, MO | 224.2 GWh |
| #365 | Butler Solar Project 103 | Butler, GA | 223.7 GWh |
| #366 | Great Cove Solar II | Saint Thomas, PA | 223.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harquahala Sun Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agave | Arlington, AZ | 333.8 GWh | 18.9 mi |
| Arlington Valley Energy Facility | Arlington, AZ | 3.4 TWh | 15.7 mi |
| Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh | 19.8 mi |
| Badger 1 | Tonopah, AZ | 33.2 GWh | 19 mi |
| Harquahala 2 | Tonopah, AZ | 494.8 GWh | 2 mi |
| Harquahala Generating Project | Tonopah, AZ | 3.5 TWh | 2.7 mi |
| Mesquite Generating Station Block 1 | Arlington, AZ | 3.6 TWh | 17 mi |
| Mesquite Generating Station Block 2 | Arlington, AZ | 4.1 TWh | 17 mi |
| Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh | 15 mi |
| Mesquite Solar 2, LLC | Tonopah, AZ | 288.9 GWh | 14.9 mi |
| Mesquite Solar 3, LLC | Tonopah, AZ | 448.5 GWh | 13.1 mi |
| Mesquite Solar 4, LLC | Tonopah, AZ | 147.7 GWh | 14.8 mi |
| Mesquite Solar 5, LLC | Tonopah, AZ | 134.8 GWh | 14.9 mi |
| Palo Verde | Wintersburg, AZ | 32.0 TWh | 16.2 mi |
| Red Hawk | Arlington, AZ | 4.8 TWh | 18.5 mi |
| Saddle Mountain Solar I | Tonopah, AZ | 34.5 GWh | 5 mi |
| Sun Streams 2 | Hassayampa, AZ | 327.6 GWh | 20.2 mi |
| Sun Streams 3 | Arlington, AZ | 469.7 GWh | 20.1 mi |
| Sun Streams 4 | Tonopah, AZ | 513.7 GWh | 21.2 mi |
| Sun Streams, LLC | Arlington, AZ | 405.6 GWh | 18.5 mi |