Beryl Solar Plant
400 East 3600 Street, Beryl, UT 84714Plant Summary Information
Beryl Solar Plant is ranked #38 out of 52 solar farms in Utah in terms of total annual net electricity generation.
Beryl Solar Plant generated 1.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Beryl Solar Plant |
---|---|
Utility Name | Evergreen Wind, LLC |
Location | Iron County, UT |
Initial Operation Date | August 2015 |
Last Update | Dec 2024 |
Annual Generation | 6.3 GWh |
Annual Consumption | 22.9 k MMBtu |
Ranked #7,401 out of 12,288 Power Plants Nationwide | |
Ranked #2,726 out of 6,174 Solar Power Plants Nationwide | |
Ranked #87 out of 120 Utah Power Plants | |
Ranked #38 out of 52 Utah Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
First Wind O&M, LLC (2013 to 2019) Evergreen Wind, LLC (2020 to 2024) |
Map of Beryl Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Beryl Solar Plant.
Monthly Net Generation for Beryl Solar Plant
Beryl Solar Plant Details
Summary Information | |
---|---|
Plant Name | Beryl Solar Plant (58598) |
Plant Address | 400 East 3600 Street, Beryl, UT 84714 |
Utility | Evergreen Wind, LLC (59155) |
Latitude, Longitude | 37.63917, -113.64583 |
Generation Dates on File | Aug 2015 to Dec 2024 |
Initial Operation Date | August 2015 |
Annual Generation | 6.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 14-796-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 12.50 kV |
Energy Storage | No |
Generator BSP1 Details Operating August 2015
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3 MW |
Summer Capacity | 3 MW |
Winter Capacity | 3 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | August 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 3.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Beryl Solar Plant Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2716 | Cirrus Solar LLC | Bunn, NC | 6.4 GWh |
#2717 | Ware Avra I | Waycross, GA | 6.4 GWh |
#2718 | Hecate Energy Blair Road LLC | Jacksonville, FL | 6.4 GWh |
#2719 | SR Bolivar | Bolivar, TN | 6.3 GWh |
#2720 | Taurus Community Solar | Montevideo, MN | 6.3 GWh |
#2721 | Cranbury | Cranbury, NJ | 6.3 GWh |
#2722 | TWE New Bern Solar Project, LLC | New Bern, NC | 6.3 GWh |
#2723 | Bellisario Solar 3 | Lapeer, NY | 6.3 GWh |
#2724 | Caribou | Caribou, ME | 6.3 GWh |
#2725 | True North | Salisbury, MA | 6.3 GWh |
#2727 | Rivard 1 | Sheridan, NY | 6.3 GWh |
#2728 | Deerfield CSG Solar | Deerfield, MA | 6.3 GWh |
#2729 | Murray Treadwell Farms | Chatsworth, GA | 6.3 GWh |
#2730 | Paradise Solar Energy Center | West Deptford, NJ | 6.3 GWh |
#2731 | Fountain | Fountain, MN | 6.3 GWh |
#2732 | Bethel Solar | Bethel, NC | 6.3 GWh |
#2733 | Crown | Lancaster, SC | 6.3 GWh |
#2734 | Oxford Solar | Oxford, MA | 6.3 GWh |
#2735 | Scotch Bonnet Solar, LLC | St Helena, NC | 6.3 GWh |
#2736 | ABD Farms | Asheboro, NC | 6.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Beryl Solar Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 73.1 GWh | 31.1 mi |
Cedar Valley Solar Plant | Cedar City, UT | 6.0 GWh | 32.5 mi |
Cove Mountain Solar | Beryl, UT | 158.2 GWh | 1.8 mi |
Cove Mountain Solar 2 | Beryl, UT | 317.5 GWh | 0.5 mi |
Enterprise Solar, LLC | Newcastle, UT | 228.7 GWh | 1.8 mi |
Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh | 22.8 mi |
Fiddler's Canyon #2 | Cedar City, UT | 7.4 GWh | 22.5 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.5 GWh | 24.3 mi |
Granite Mountain Solar East, LLC | Cedar City, UT | 214.0 GWh | 24.8 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 128.5 GWh | 20.9 mi |
Hurricane City Power | Hurricane, UT | 7.4 GWh | 36.7 mi |
Iron Springs Solar, LLC | Cedar City, UT | 219.3 GWh | 27.6 mi |
Quail Creek Hydro Plant #1 | Hurricane, UT | 10.3 GWh | 35.1 mi |
Quichapa 1 | Cedar City, UT | 6.6 GWh | 23.5 mi |
Quichapa 2 | Cedar City, UT | 5.8 GWh | 25.1 mi |
Quichapa 3 | Cedar City, UT | 7.0 GWh | 22.4 mi |
St George Red Rock | St George, UT | 178.0 MWh | 36.5 mi |
Three Peaks Power | Cedar City, UT | 231.6 GWh | 30.7 mi |
Veyo Heat Recovery Project | Gunlock, UT | 39.0 GWh | 21.2 mi |
Washington City Electric Generation | Washington, UT | 5.7 GWh | 35.3 mi |