Townsite Solar Project Hybrid
TBD, Boulder City, NV 89005Plant Summary Information
Townsite Solar Project Hybrid is ranked #26 out of 112 power plants in Nevada in terms of total annual net electricity generation.
Townsite Solar Project Hybrid generated 151.3 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Townsite Solar Project Hybrid |
|---|---|
| Utility Name | Townsite Solar, LLC |
| Location | Clark County, NV |
| Initial Operation Date | December 2021 |
| Last Update | Aug 2026 |
| Annual Generation | 458.2 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,489 out of 13,301 Power Plants Nationwide | |
| Ranked #156 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #26 out of 112 Nevada Power Plants | |
| Ranked #11 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Skylar Resources, LP (2016 to 2018) Townsite Solar, LLC (2019 to 2025) |
Map of Townsite Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Townsite Solar Project Hybrid.
Monthly Net Generation for Townsite Solar Project Hybrid
Monthly Plant Fuel Consumption for Townsite Solar Project Hybrid
Townsite Solar Project Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Townsite Solar Project Hybrid (60654) |
| Plant Address | TBD, Boulder City, NV 89005 |
| Utility | Townsite Solar, LLC (60387) |
| Latitude, Longitude | 35.93734, -114.884 |
| Generation Dates on File | Dec 2021 to Aug 2026 |
| Initial Operation Date | December 2021 |
| Annual Generation | 458.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-245 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | WAPA-- Western Area Power Administration (27000) AZ |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator GEN01 Details Operating December 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 180 MW |
| Summer Capacity | 160 MW |
| Winter Capacity | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| Tilt Angle | 90 |
| DC Net Capacity | 232 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator GEN02 Details Operating December 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 90 MW |
| Summer Capacity | 90 MW |
| Winter Capacity | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 360 |
|---|---|
| Maximum Charge Rate | 90 MW |
| Maximum Discharge Rate | 90 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 210 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | Yes |
| Co Located Renewable Firming | Yes |
| System Peak Shaving | P |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 60654 |
| Direct Support Gen Id | GEN01 |
| Support T D Asset | No |
Townsite Solar Project Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #146 | ENGIE Long Draw Solar LLC | Gail, TX | 485.8 GWh |
| #147 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 485.5 GWh |
| #148 | Big Elm Solar | Troy, TX | 485.0 GWh |
| #149 | Pine Forest Solar I | Pickton, TX | 465.6 GWh |
| #150 | Proxima | Crows Landing, CA | 466.3 GWh |
| #151 | Sebree Solar I | Robards, KY | 482.6 GWh |
| #152 | ANSON Solar Center, LLC | Anson, TX | 480.8 GWh |
| #153 | Scarlet Solar (CA) | Fresno, CA | 469.3 GWh |
| #154 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
| #155 | Estonian Solar Project, LLC | Cooper, TX | 466.2 GWh |
| #157 | Roadrunner Solar and BESS | Cochise, AZ | 451.4 GWh |
| #158 | Emily Solar, LLC | Casey, IL | 468.5 GWh |
| #159 | Taygete II Energy Project | Coyanosa, TX | 463.1 GWh |
| #160 | Milagro Solar I | Santa Teresa, NM | 461.1 GWh |
| #161 | Horizon Solar | Pearsall, TX | 455.2 GWh |
| #162 | Escape Solar Plant | TBD, NV | 443.3 GWh |
| #163 | Harquahala Sun Solar Project | Tonopah, AZ | 454.9 GWh |
| #164 | Hornshadow Solar II, LLC | Castle Dale, UT | 450.2 GWh |
| #165 | Techren Solar II LLC | Boulder, NV | 449.2 GWh |
| #166 | Centinela Solar Energy | Calexico, CA | 448.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Townsite Solar Project Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 99.5 GWh | 6.9 mi |
| Boulder Solar Power, LLC | Boulder City, NV | 272.8 GWh | 8.6 mi |
| CM10 | Boulder City, NV | 18.4 GWh | 12 mi |
| CM48 | Boulder City, NV | 89.7 GWh | 12.4 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 726.0 GWh | 11.3 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 596.4 GWh | 5.3 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 248.3 GWh | 11.9 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 688.5 GWh | 12.2 mi |
| Desert Star Energy Center | Boulder City, NV | 599.8 GWh | 12 mi |
| Dignity - Siena Campus | Henderson, NV | 2.8 GWh | 13.7 mi |
| Hoover Dam (AZ) | Boulder City, AZ | 1.4 TWh | 9.8 mi |
| Hoover Dam (NV) | Boulder City, NV | 1.3 TWh | 9.8 mi |
| Nevada Solar One | Boulder City, NV | 92.6 GWh | 11 mi |
| River Mountains Solar | Henderson, NV | 30.8 GWh | 7 mi |
| Saguaro Power | Henderson, NV | 145.1 GWh | 10.1 mi |
| Techren Solar I LLC | Boulder, NV | 217.8 GWh | 7.8 mi |
| Techren Solar II LLC | Boulder, NV | 449.2 GWh | 6.3 mi |
| Techren Solar III LLC | Boulder, NV | 50.2 GWh | 8.1 mi |
| Techren Solar IV LLC | Boulder, NV | 57.2 GWh | 4.3 mi |
| Techren Solar V | Boulder, NV | 118.7 GWh | 3.5 mi |