Townsite Solar Project Hybrid
TBD, Boulder City, NV 89005Plant Summary Information
Townsite Solar Project Hybrid is ranked #23 out of 110 power plants in Nevada in terms of total annual net electricity generation.
Townsite Solar Project Hybrid generated 140.1 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Townsite Solar Project Hybrid |
|---|---|
| Utility Name | Townsite Solar, LLC |
| Location | Clark County, NV |
| Initial Operation Date | December 2021 |
| Last Update | Sep 2025 |
| Annual Generation | 459.6 GWh |
| Annual Consumption | 1.8 M MMBtu |
| Ranked #1,431 out of 12,539 Power Plants Nationwide | |
| Ranked #116 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #23 out of 110 Nevada Power Plants | |
| Ranked #10 out of 61 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Skylar Resources, LP (2016 to 2018) Townsite Solar, LLC (2019 to 2024) |
Map of Townsite Solar Project Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Townsite Solar Project Hybrid.
Monthly Net Generation for Townsite Solar Project Hybrid
Townsite Solar Project Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Townsite Solar Project Hybrid (60654) |
| Plant Address | TBD, Boulder City, NV 89005 |
| Utility | Townsite Solar, LLC (60387) |
| Latitude, Longitude | 35.93734, -114.884 |
| Generation Dates on File | Dec 2021 to Sep 2025 |
| Initial Operation Date | December 2021 |
| Annual Generation | 459.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG20-245 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | WAPA-- Western Area Power Administration (27000) AZ |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator GEN01 Details Operating December 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 180 MW |
| Summer Capacity | 160 MW |
| Winter Capacity | 130 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| Tilt Angle | 90 |
| DC Net Capacity | 232 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator GEN02 Details Operating December 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 90 MW |
| Summer Capacity | 90 MW |
| Winter Capacity | 90 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 360 |
|---|---|
| Maximum Charge Rate | 90 MW |
| Maximum Discharge Rate | 90 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 210 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | Yes |
| Co Located Renewable Firming | Yes |
| System Peak Shaving | P |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 60654 |
| Direct Support Gen Id | GEN01 |
| Support T D Asset | No |
Townsite Solar Project Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #106 | Bernard Creek Solar | Hungerford, TX | 498.7 GWh |
| #107 | Fort Bend Solar LLC | East Bernard, TX | 497.5 GWh |
| #108 | SR Toombs, LLC | Vidalia, GA | 497.5 GWh |
| #109 | RE Garland | Rosamond, CA | 483.5 GWh |
| #110 | Techren Solar II LLC | Boulder, NV | 493.9 GWh |
| #111 | Proxima | Crows Landing, CA | 461.7 GWh |
| #112 | McFarland B Solar and Storage | Dateland, AZ | 478.9 GWh |
| #113 | Peregrine Solar | Gollad, TX | 478.1 GWh |
| #114 | True North Solar, LLC | Otto, TX | 477.0 GWh |
| #115 | ANSON Solar Center, LLC | Anson, TX | 477.0 GWh |
| #117 | Sparta Solar | Pawnee, TX | 475.3 GWh |
| #118 | Delilah Solar Energy LLC | Bogota, TX | 470.4 GWh |
| #119 | Decatur Solar | Climax, GA | 469.8 GWh |
| #120 | White Wing Solar | Yuma, AZ | 467.0 GWh |
| #121 | Horizon Solar | Pearsall, TX | 459.4 GWh |
| #122 | Taygete II Energy Project | Coyanosa, TX | 456.7 GWh |
| #123 | Orion I Solar Project | Burlington, TX | 452.7 GWh |
| #124 | San Juan Solar I | Kirtland, NM | 434.5 GWh |
| #125 | Pike Solar Hybrid | Fountain, CO | 451.3 GWh |
| #126 | Blue Jay Solar I, LLC | Iola, TX | 445.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Townsite Solar Project Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 111.8 GWh | 6.9 mi |
| Clark (NVE) | Las Vegas, NV | 896.4 GWh | 13.9 mi |
| CM10 | Boulder City, NV | 18.0 GWh | 12 mi |
| CM48 | Boulder City, NV | 94.3 GWh | 12.4 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 11.3 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 607.4 GWh | 5.3 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 11.9 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 688.1 GWh | 12.2 mi |
| Desert Star Energy Center | Boulder City, NV | 546.1 GWh | 12 mi |
| Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 13.7 mi |
| Hoover Dam (AZ) | Boulder City, AZ | 898.4 GWh | 9.8 mi |
| Hoover Dam (NV) | Boulder City, NV | 2.0 TWh | 9.8 mi |
| Nevada Solar One | Boulder City, NV | 89.8 GWh | 11 mi |
| River Mountains Solar | Henderson, NV | 33.6 GWh | 7 mi |
| Saguaro Power | Henderson, NV | 260.4 GWh | 10.1 mi |
| Techren Solar I LLC | Boulder, NV | 220.9 GWh | 7.8 mi |
| Techren Solar II LLC | Boulder, NV | 493.9 GWh | 6.3 mi |
| Techren Solar III LLC | Boulder, NV | 55.6 GWh | 8.1 mi |
| Techren Solar IV LLC | Boulder, NV | 53.8 GWh | 4.3 mi |
| Techren Solar V | Boulder, NV | 105.2 GWh | 3.5 mi |