Roadrunner Solar and BESS
4402 Cochise Stronghold Rd, Cochise, AZ 85606Plant Summary Information
Roadrunner Solar and BESS is ranked #31 out of 113 solar farms in Arizona in terms of total annual net electricity generation.
Roadrunner Solar and BESS generated 101.0 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Roadrunner Solar and BESS |
|---|---|
| Utility Name | Clenera LLC |
| Location | Cochise County, AZ |
| Initial Operation Date | Not Available |
| Last Update | Mar 2026 |
| Annual Generation | 133.9 GWh |
| Annual Consumption | 471.7 k MMBtu |
| Ranked #3,088 out of 12,332 Power Plants Nationwide | |
| Ranked #697 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #68 out of 166 Arizona Power Plants | |
| Ranked #31 out of 113 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of Roadrunner Solar and BESS
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Roadrunner Solar and BESS.
Monthly Net Generation for Roadrunner Solar and BESS
Monthly Plant Fuel Consumption for Roadrunner Solar and BESS
Roadrunner Solar and BESS Details
| Summary Information | |
|---|---|
| Plant Name | Roadrunner Solar and BESS (67823) |
| Plant Address | 4402 Cochise Stronghold Rd, Cochise, AZ 85606 |
| Utility | Clenera LLC (60232) |
| Latitude, Longitude | 32.08615, -109.93529 |
| Generation Dates on File | Dec 2025 to Mar 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 133.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Arizona Electric Pwr Coop Inc (796) |
| Grid Voltage | 230.00 kV |
| Energy Storage | |
Roadrunner Solar and BESS Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #687 | Nassau Solar Center | Callahan, FL | 139.2 GWh |
| #688 | Jamison Solar (FL) | Mulberry, FL | 139.1 GWh |
| #689 | White Oak Solar, LLC | Waynesboro, GA | 139.1 GWh |
| #690 | Indian River Solar Center | Vero Beach, FL | 139.1 GWh |
| #691 | Sage Solar I-III | Randolph, UT | 138.9 GWh |
| #692 | Wildflower Solar Energy Center | Arcadia, FL | 138.8 GWh |
| #693 | Britton Solar Energy Center | Moriarty, NM | 138.8 GWh |
| #694 | Golden Fields Solar I, LLC | Rosamond, CA | 138.6 GWh |
| #695 | Sherco Solar II | Becker, MN | 138.5 GWh |
| #696 | Adams Solar LLC PA | Gettysburg, PA | 138.5 GWh |
| #698 | Innovative Solar 37 LLC | Morven, NC | 138.2 GWh |
| #699 | Luciana | Richgrove, CA | 138.2 GWh |
| #700 | Gray Hawk Solar | Kingman, AZ | 137.7 GWh |
| #701 | Gutenberg Solar | Garysburg, NC | 137.7 GWh |
| #702 | Babcock Solar Energy Center Hybrid | Punta Gorda, FL | 137.3 GWh |
| #703 | NC 102 Project LLC | Midland, NC | 137.3 GWh |
| #704 | Lake Mabel Solar and Battery Storage | Lake Wales, FL | 133.0 GWh |
| #705 | SR DeSoto III | DeSoto, GA | 136.2 GWh |
| #706 | Miami Dade Solar Energy Center | Miami, FL | 135.9 GWh |
| #707 | Bookers Mill Solar | Farnham, VA | 135.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Roadrunner Solar and BESS.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Actus Lend Lease DMAFB | Tucson, AZ | 2.5 GWh | 54.7 mi |
| Amazon TUS2 | Tucson, AZ | 5.5 GWh | 53 mi |
| Apache Solar I | Cochise, AZ | 55.5 GWh | 2.9 mi |
| Apache Station | Cochise, AZ | 2.1 TWh | 3 mi |
| Babacomari Solar | Huachuca, AZ | 64.8 GWh | 40.8 mi |
| Cogenra - TEP | Tucson, AZ | 1.9 GWh | 51.4 mi |
| Douglas | Douglas, AZ | 93.0 MWh | 54.7 mi |
| Fort Huachuca Solar PV Project | Sierra Vista, AZ | 40.1 GWh | 44 mi |
| Gato Montes Solar, LLC | Tucson, AZ | 7.4 GWh | 51.8 mi |
| Iron Horse Battery Storage Hybrid | Tucson, AZ | 4.7 GWh | 51.7 mi |
| Prairie Fire | Tucson, AZ | 7.8 GWh | 51.8 mi |
| Raptor Ridge | Tucson, AZ | 33.8 GWh | 55.3 mi |
| Red Horse 2 | Willcox, AZ | 145.9 GWh | 16.5 mi |
| Red Horse III | Wilcox, AZ | 52.2 GWh | 7.6 mi |
| SR McNeal | McNeal, AZ | 53.5 GWh | 39.2 mi |
| Sulphur Springs | Cochise, AZ | 51.5 GWh | 1.9 mi |
| Tech Park Solar | Tucson, AZ | 11.8 GWh | 51.5 mi |
| UASTP I | Tucson, AZ | 1.6 GWh | 51.2 mi |
| Valencia Solar | Tucson, AZ | 24.6 GWh | 54.7 mi |
| Wilmot Energy Center LLC | Tucson, AZ | 272.8 GWh | 56.1 mi |