Oriana Solar LLC
TBD, Victoria, TX 77904Plant Summary Information
Oriana Solar LLC is ranked #95 out of 253 solar farms in Texas in terms of total annual net electricity generation.
Oriana Solar LLC generated 118.4 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Oriana Solar LLC |
|---|---|
| Utility Name | Oriana Solar LLC |
| Location | Victoria County, TX |
| Initial Operation Date | August 2025 |
| Last Update | Jul 2026 |
| Annual Generation | 358.7 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,806 out of 13,285 Power Plants Nationwide | |
| Ranked #254 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #375 out of 856 Texas Power Plants | |
| Ranked #95 out of 253 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Oriana Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oriana Solar LLC.
Monthly Net Generation for Oriana Solar LLC
Monthly Plant Fuel Consumption for Oriana Solar LLC
Oriana Solar LLC Details
| Summary Information | |
|---|---|
| Plant Name | Oriana Solar LLC (65849) |
| Plant Address | TBD, Victoria, TX 77904 |
| Utility | Oriana Solar LLC (65081) |
| Latitude, Longitude | 28.90535, -96.97808 |
| Generation Dates on File | Sep 2025 to Jul 2026 |
| Initial Operation Date | August 2025 |
| Annual Generation | 358.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | South Texas Electric Coop, Inc (17583) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator ORIPV Details Operating August 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 180 MW |
| Summer Capacity | 180 MW |
| Winter Capacity | 180 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2025 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Dual Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 232.21 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Oriana Solar LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #244 | Hillcrest Solar | Mt. Orab, OH | 365.3 GWh |
| #245 | Lund Hill Solar | Bickleton, WA | 364.9 GWh |
| #246 | Black Hollow Sun | Auit, CO | 363.8 GWh |
| #247 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 338.3 GWh |
| #248 | Brazoria Solar I | Angleton, TX | 362.6 GWh |
| #249 | Roadrunner Solar and BESS | Cochise, AZ | 348.8 GWh |
| #250 | Rambler | San Angelo, TX | 361.4 GWh |
| #251 | Raceway Solar & Storage | Lancaster, CA | 351.8 GWh |
| #252 | North Rosamond Solar LLC | Rosamond, CA | 360.5 GWh |
| #253 | Azalea Springs Solar Park | Lufkin, TX | 360.4 GWh |
| #255 | Mount Signal Solar Farm II | Calexico, CA | 358.5 GWh |
| #256 | Spanish Peaks Solar | Trinidad, CO | 357.8 GWh |
| #257 | Blythe Solar III, LLC Hybrid | Blythe, CA | 342.7 GWh |
| #258 | Hardy Hills Solar Energy LLC | Frankfort, IN | 357.0 GWh |
| #259 | Imperial Solar Energy Center West | Seeley, CA | 357.0 GWh |
| #260 | Newport Solar Project | Newport, AR | 352.1 GWh |
| #261 | New Madrid Solar, LLC | Marston, MO | 351.3 GWh |
| #262 | Arlington Energy Center III | Blythe, CA | 329.9 GWh |
| #263 | Castle Gap Solar Hybrid | McCarney, TX | 349.1 GWh |
| #264 | Camilla Solar Energy Project | Camilla, GA | 345.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oriana Solar LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aktina Solar | El Campo, TX | 1.1 TWh | 45 mi |
| Calhoun Port Comfort | Point Comfort, TX | 26.0 GWh | 31.6 mi |
| CatanSolar | Runge, TX | 22.2 GWh | 43.6 mi |
| CFB Power Plant | Point Comfort, TX | 851.5 GWh | 31.9 mi |
| CG PS Victoria WWTP, LLC | Victoria, TX | 40.0 MWh | 8 mi |
| Coleto Creek | Fannin, TX | 2.8 TWh | 19.5 mi |
| Formosa Utility Venture Ltd | Point Comfort, TX | 4.9 TWh | 30.3 mi |
| Ganado Solar | Gail, TX | 330.5 GWh | 30.6 mi |
| HEB00092 | Victoria, TX | 320.0 MWh | 3.9 mi |
| OTHERCitizensHospital | Victoria, TX | 588.0 MWh | 6.4 mi |
| Peregrine Solar | Gollad, TX | 711.4 GWh | 43.8 mi |
| Sam Rayburn | Nursery, TX | 162.4 GWh | 9.5 mi |
| Seadrift Coke LP | Port Lavaca, TX | 35.4 GWh | 29.3 mi |
| Tres Bahias | Port Lavaca, TX | 440.0 GWh | 32.1 mi |
| Tres City Power LLC | Victoria, TX | 49.1 GWh | 8.5 mi |
| Tres Port Power, LLC | Victoria, TX | 98.3 GWh | 14.6 mi |
| Union Carbide Seadrift Cogen | Seadrift, TX | 563.3 GWh | 30 mi |
| Victoria | Victoria, TX | 1.2 TWh | 8.3 mi |
| Victoria Port II | Victoria, TX | 25.2 GWh | 14.4 mi |
| Victoria Texas Plant | Victoria, TX | 542.0 GWh | 16 mi |