Misae Solar
Co Road AA, Childress, TX 79201Plant Summary Information
Misae Solar is ranked #43 out of 5,173 solar farms nationwide in terms of total annual net electricity generation.
Misae Solar generated 102.3 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Misae Solar |
---|---|
Utility Name | Misae Lessee LLC |
Location | Childress County, TX |
Initial Operation Date | January 2020 |
Last Update | Feb 2024 |
Annual Generation | 546.6 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,284 out of 11,455 Power Plants Nationwide | |
Ranked #43 out of 5,173 Solar Power Plants Nationwide | |
Ranked #228 out of 726 Texas Power Plants | |
Ranked #15 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
Childress Solar Park LLC (2018 to 2018) Misae Lessee LLC (2019 to 2022) |
Map of Misae Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Misae Solar.
Monthly Net Generation for Misae Solar
Misae Solar Details
Summary Information | |
---|---|
Plant Name | Misae Solar (62249) |
Plant Address | Co Road AA Childress, TX 79201 |
Utility | Misae Lessee LLC (63048) |
Latitude, Longitude | 34.38053, -100.09963 |
Generation Dates on File | Jan 2020 to Feb 2024 |
Initial Operation Date | January 2020 |
Annual Generation | 546.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 77777 Details Operating January 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 240 MW |
Summer Capacity | 240 MW |
Winter Capacity | 240 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 326.8 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Misae Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Childress Solar Park LLC | 200 Bellevue Parkway, Suite 210, Wilmington, DE 19089 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#33 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 587.5 GWh |
#34 | Aktina Solar | El Campo, TX | 587.2 GWh |
#35 | Azure Sky Solar | Haskell, TX | 578.6 GWh |
#36 | Bighorn Solar 1 | Pueblo, CO | 584.0 GWh |
#37 | Taygete Energy Project LLC | Coyanosa, TX | 570.1 GWh |
#38 | Techren Solar II LLC | Boulder, NV | 564.7 GWh |
#39 | Aquamarine | Lemoore, CA | 560.9 GWh |
#40 | Phoebe Solar | Kermit, TX | 559.5 GWh |
#41 | Dodge Flat | Reno, NV | 546.0 GWh |
#42 | Golden Field Solar III, LLC | Rosamond, CA | 551.9 GWh |
#44 | ENGIE Long Draw Solar LLC | Gail, TX | 545.0 GWh |
#45 | Pisgah Ridge Solar, LLC | Richland, TX | 529.7 GWh |
#46 | Roseland Solar Project, LLC | Riesel, TX | 524.4 GWh |
#47 | Centinela Solar Energy | Calexico, CA | 523.7 GWh |
#48 | Fighting Jays Solar Project | Needville, TX | 518.0 GWh |
#49 | California Valley Solar Ranch | California Valley, CA | 504.4 GWh |
#50 | Pleinmont Solar 2 | Spotsylvania, VA | 495.1 GWh |
#51 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 495.0 GWh |
#52 | Neptune Energy Center Hybrid | Boone, CO | 477.3 GWh |
#53 | Mesquite Solar 3, LLC | Tonopah, AZ | 490.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Misae Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Blue Summit II Wind, LLC | Vernon, TX | 393.0 GWh | 37.1 mi |
Blue Summit III Wind | Chilicothe, TX | 764.5 GWh | 33.9 mi |
Blue Summit Wind LLC | Vernon, TX | 462.4 GWh | 42.2 mi |
Briscoe Wind Farm | Silverton, TX | 471.8 GWh | 64.9 mi |
Cotton Plains Wind Farm | Floydada, TX | 208.5 GWh | 66 mi |
El Campo Wind | Truscott, TX | 773.5 GWh | 49.6 mi |
Electra Wind Farm | Oklaunion, TX | 995.5 GWh | 59.2 mi |
Foard City Wind | Crowell, TX | 1.2 TWh | 38.1 mi |
Green Pastures Wind I | Seymour, TX | 234.5 GWh | 65.2 mi |
Green Pastures Wind II | Seymour, TX | 283.4 GWh | 60.2 mi |
Griffin Trail Wind | E Seymour, TX | 820.5 GWh | 61 mi |
Lockett Windfarm | Vernon, TX | 795.9 GWh | 52.2 mi |
Longhorn Wind | Silverton, TX | 823.7 GWh | 65.9 mi |
Mangum | Mangum, OK | 166.7 MWh | 48.6 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 480.5 GWh | 66 mi |
Old Settler Wind | Floydada, TX | 595.5 GWh | 66 mi |
TG East | Truscott, TX | 1.1 TWh | 50.4 mi |
Wake Wind Energy Center | Floydada, TX | 1.1 TWh | 68.9 mi |
Western Trail Wind, LLC | Electra, TX | 915.4 GWh | 69.5 mi |
Whirlwind Energy Center | Floydada, TX | 202.0 GWh | 60.2 mi |