Brazoria West is ranked #40 out of 191 solar farms in Texas in terms of total annual net electricity generation.
Brazoria West generated 116.3 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Brazoria West |
---|---|
Utility Name | Brazoria West Solar Project, LLC |
Location | Brazoria County, TX |
Initial Operation Date | September 2022 |
Last Update | May 2025 |
Annual Generation | 417.0 GWh |
Annual Consumption | 1.6 M MMBtu |
Ranked #1,489 out of 12,312 Power Plants Nationwide | |
Ranked #112 out of 6,191 Solar Power Plants Nationwide | |
Ranked #289 out of 796 Texas Power Plants | |
Ranked #40 out of 191 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Brazoria West
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria West.
Monthly Net Generation for Brazoria West
Brazoria West Details
Summary Information | |
---|---|
Plant Name | Brazoria West (64447) |
Plant Address | 2546 County Road 23, Damon, TX 77422 |
Utility | Brazoria West Solar Project, LLC (64108) |
Latitude, Longitude | 29.191, -95.663 |
Generation Dates on File | Jun 2022 to May 2025 |
Initial Operation Date | September 2022 |
Annual Generation | 417.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating September 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2022 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 260 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Brazoria West Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#102 | Oak Ridge Solar | Oak Ridge, LA | 444.4 GWh |
#103 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
#104 | Pleinmont Solar 2 | Spotsylvania, VA | 442.7 GWh |
#105 | Chaparral Springs | Rosamond, CA | 440.3 GWh |
#106 | Misae Solar | Childress, TX | 435.1 GWh |
#107 | Pike Solar Hybrid | Fountain, CO | 434.1 GWh |
#108 | Hickory Park Solar Hybrid | Camilla, GA | 427.0 GWh |
#109 | Muscle Shoals | Cherokee, AL | 425.4 GWh |
#110 | Twiggs Solar | Dry Branch, GA | 420.3 GWh |
#111 | Desert Quartzite | Blythe, CA | 408.3 GWh |
#113 | Atrisco Solar LLC | Rio Rancho, NM | 414.3 GWh |
#114 | Crane Solar Project | Crane, TX | 414.0 GWh |
#115 | Big Cypress Solar, LLC | Crawfordsville, AR | 413.4 GWh |
#116 | Brazoria County Solar Project (Danciger) | Damon, TX | 413.1 GWh |
#117 | Rambler | San Angelo, TX | 411.8 GWh |
#118 | Tres Bahias | Port Lavaca, TX | 410.1 GWh |
#119 | Mount Signal Solar Farm II | Calexico, CA | 407.0 GWh |
#120 | Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh |
#121 | Riverstart Solar Park LLC | Modoc, IN | 405.0 GWh |
#122 | Yellow Pine Solar | Enterprise, NV | 389.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brazoria West.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
BASF Freeport Works | Feeeport, TX | 532.7 GWh | 20.8 mi |
Braes Bayou Plant | Richmond, TX | 321.2 GWh | 20.2 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 413.1 GWh | 6 mi |
Brotman Power Station | Rosharon, TX | 436.7 GWh | 18.2 mi |
Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 21.8 mi |
Cutlass Solar 1 LLC | Richmond, TX | 185.6 GWh | 15.7 mi |
Cutlass Solar II | Richmond, TX | 355.9 GWh | 15.5 mi |
Fighting Jays Solar Project | Needville, TX | 304.5 GWh | 12.6 mi |
Freeport Energy | Freeport, TX | 1.7 TWh | 20.7 mi |
Freeport Energy Center | Freeport, TX | 951.6 GWh | 21.4 mi |
Jack Fusco Energy Center | Thompsons, TX | 3.4 TWh | 19.6 mi |
Mark One Power Station | Angleton, TX | 316.0 GWh | 14.2 mi |
Newgulf Cogen | NewGulf, TX | 12.7 GWh | 15.1 mi |
Old 300 Solar Center, LLC | Needville, TX | 917.6 GWh | 13.9 mi |
Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.8 GWh | 19.7 mi |
Praxair | Clute, TX | 14.0 MWh | 21 mi |
Second Division Solar | West Columbia, TX | 80.2 GWh | 4.9 mi |
Sweeny Cogen Facility | Old Ocean, TX | 3.2 TWh | 9.5 mi |
W A Parish | Thompsons, TX | 14.3 TWh | 20.3 mi |
Wagyu | Damon, TX | 219.1 GWh | 3.6 mi |