Brazoria West
2546 County Road 23, Damon, TX 77422Plant Summary Information
Brazoria West is ranked #82 out of 255 solar farms in Texas in terms of total annual net electricity generation.
Brazoria West generated 133.6 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Brazoria West |
|---|---|
| Utility Name | Brazoria West Solar Project, LLC |
| Location | Brazoria County, TX |
| Initial Operation Date | September 2022 |
| Last Update | Aug 2026 |
| Annual Generation | 419.1 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,606 out of 13,301 Power Plants Nationwide | |
| Ranked #195 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #343 out of 861 Texas Power Plants | |
| Ranked #82 out of 255 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Brazoria West
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brazoria West.
Monthly Net Generation for Brazoria West
Monthly Plant Fuel Consumption for Brazoria West
Brazoria West Details
| Summary Information | |
|---|---|
| Plant Name | Brazoria West (64447) |
| Plant Address | 2546 County Road 23, Damon, TX 77422 |
| Utility | Brazoria West Solar Project, LLC (64108) |
| Latitude, Longitude | 29.191, -95.663 |
| Generation Dates on File | Jun 2022 to Aug 2026 |
| Initial Operation Date | September 2022 |
| Annual Generation | 419.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator GEN1 Details Operating September 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | September 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 260 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Brazoria West Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #185 | Mesquite Solar 3, LLC | Tonopah, AZ | 434.5 GWh |
| #186 | Pearl River Solar Park LLC | Morton, MS | 434.5 GWh |
| #187 | Sun Streams 3 | Arlington, AZ | 403.6 GWh |
| #188 | Morris Solar | Kirksville, MO | 431.7 GWh |
| #189 | Driver Solar | Osceola, AR | 431.1 GWh |
| #190 | Fagus Solar Park | Childress, TX | 428.7 GWh |
| #191 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 421.7 GWh |
| #192 | Oak Ridge Solar | Oak Ridge, LA | 428.6 GWh |
| #193 | Muscle Shoals | Cherokee, AL | 428.3 GWh |
| #194 | Stoneridge Solar, LLC | Thorndale, TX | 421.9 GWh |
| #196 | AP Sunray LLC | Knippa, TX | 418.9 GWh |
| #197 | Twiggs Solar | Dry Branch, GA | 417.9 GWh |
| #198 | Pisgah Ridge Solar, LLC | Richland, TX | 417.8 GWh |
| #199 | Golden Triangle | Lowndes, MS | 409.8 GWh |
| #200 | Chaparral Springs | Rosamond, CA | 398.1 GWh |
| #201 | Misae Solar | Childress, TX | 412.8 GWh |
| #202 | Dry Lake Solar Energy Center | Moapa, NV | 396.1 GWh |
| #203 | Northern Orchard Solar PV, LLC | Taft, CA | 404.3 GWh |
| #204 | Big Cypress Solar, LLC | Crawfordsville, AR | 409.2 GWh |
| #205 | Azalea Springs Solar Park | Lufkin, TX | 408.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brazoria West.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Braes Bayou Plant | Richmond, TX | 185.1 GWh | 20.2 mi |
| Brazoria County Solar Project (Danciger) | Damon, TX | 389.6 GWh | 6 mi |
| Brazoria Solar I | Angleton, TX | 508.6 GWh | 18 mi |
| Brotman Power Station | Rosharon, TX | 205.6 GWh | 18.2 mi |
| Cutlass Solar 1 LLC | Richmond, TX | 179.1 GWh | 15.7 mi |
| Cutlass Solar II | Richmond, TX | 448.4 GWh | 15.5 mi |
| Fighting Jays Solar Project | Needville, TX | 510.2 GWh | 12.6 mi |
| Freeport Energy | Freeport, TX | 1.9 TWh | 20.7 mi |
| GulfStar Power, LLC | Wharton, TX | 896.1 GWh | 18.4 mi |
| Jack Fusco Energy Center | Thompsons, TX | 3.9 TWh | 19.6 mi |
| Long Point Solar | Damon, TX | 185.2 GWh | 3.7 mi |
| Mark One Power Station | Angleton, TX | 416.2 GWh | 14.2 mi |
| Myrtle Solar, LLC | Angleton, TX | 528.4 GWh | 14.4 mi |
| Old 300 Solar Center, LLC | Needville, TX | 901.8 GWh | 13.9 mi |
| Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.5 GWh | 19.7 mi |
| Second Division Solar | West Columbia, TX | 193.2 GWh | 4.9 mi |
| Sweeny Cogen Facility | Old Ocean, TX | 2.9 TWh | 9.5 mi |
| Texas Gulf Sulphur | NewGulf, TX | 4.6 GWh | 15.1 mi |
| W A Parish | Thompsons, TX | 13.7 TWh | 20.3 mi |
| Wagyu | Damon, TX | 216.6 GWh | 3.6 mi |