Golden Triangle
TBD, Lowndes, MS 39701Plant Summary Information
Golden Triangle is ranked #20 out of 57 power plants in Mississippi in terms of total annual net electricity generation.
Golden Triangle generated 74.2 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Golden Triangle |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Lowndes County, MS |
| Initial Operation Date | Not Available |
| Last Update | Feb 2026 |
| Annual Generation | 443.4 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,489 out of 12,637 Power Plants Nationwide | |
| Ranked #135 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #20 out of 57 Mississippi Power Plants | |
| Ranked #1 out of 24 Mississippi Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
OE_MS5 (2020 to 2023) Origis Energy USA, Inc (2024 to 2024) |
Map of Golden Triangle
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Golden Triangle.
Monthly Net Generation for Golden Triangle
Monthly Plant Fuel Consumption for Golden Triangle
Golden Triangle Details
| Summary Information | |
|---|---|
| Plant Name | Golden Triangle (64529) |
| Plant Address | TBD, Lowndes, MS 39701 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 33.41889, -88.61888 |
| Generation Dates on File | Jan 2025 to Feb 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 443.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Golden Triangle Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #125 | Proxima | Crows Landing, CA | 463.5 GWh |
| #126 | Decatur Solar | Climax, GA | 481.9 GWh |
| #127 | Horizon Solar | Pearsall, TX | 476.6 GWh |
| #128 | Scarlet Solar (CA) | Fresno, CA | 466.8 GWh |
| #129 | Sparta Solar | Pawnee, TX | 473.4 GWh |
| #130 | Fighting Jays Solar Project | Needville, TX | 472.1 GWh |
| #131 | Estonian Solar Project, LLC | Cooper, TX | 462.3 GWh |
| #132 | Townsite Solar Project Hybrid | Boulder City, NV | 455.7 GWh |
| #133 | Taygete II Energy Project | Coyanosa, TX | 457.0 GWh |
| #134 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 446.9 GWh |
| #136 | Orion I Solar Project | Burlington, TX | 449.7 GWh |
| #137 | Blue Jay Solar I, LLC | Iola, TX | 442.0 GWh |
| #138 | Tres Bahias | Port Lavaca, TX | 446.6 GWh |
| #139 | Pike Solar Hybrid | Fountain, CO | 445.6 GWh |
| #140 | White Wing Solar | Yuma, AZ | 445.1 GWh |
| #141 | Sun Mountain Solar 1 | Unincorporated Pueblo, CO | 444.9 GWh |
| #142 | Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh |
| #143 | Mesquite Solar 3, LLC | Tonopah, AZ | 441.5 GWh |
| #144 | Cutlass Solar II | Richmond, TX | 437.1 GWh |
| #145 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 432.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Golden Triangle.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Attala | Sallis, MS | 2.5 TWh | 67.1 mi |
| Bankhead Dam | Northport, AL | 107.8 GWh | 72.8 mi |
| Caledonia | Steens, MS | 5.1 TWh | 25.4 mi |
| Choctaw County | French Camp, MS | 4.0 TWh | 47.1 mi |
| Columbus MS | Columbus, MS | 516.2 GWh | 10 mi |
| Golden Triangle II | St.Artesia, MS | 319.6 GWh | 0.3 mi |
| Greene County | Demopolis, AL | 1.0 TWh | 74.5 mi |
| Holt Dam | Tuscaloosa, AL | 119.3 GWh | 68.4 mi |
| Kemper County | De Kalb, MS | 16.9 GWh | 42.9 mi |
| Meridian | Meridian, MS | 434.0 MWh | 60 mi |
| Meridian II | Meridian, MS | 6.4 GWh | 59.8 mi |
| Meridian III | Meridian, MS | 118.3 GWh | 66.8 mi |
| Optimist | West Point, MS | 57.1 GWh | 15.6 mi |
| Prairie Bluff | Houston, MS | 7.2 GWh | 42.8 mi |
| Quantum Choctaw Power LLC | Ackerman, MS | 3.9 TWh | 34.1 mi |
| Ratcliffe | De Kalb, MS | 4.2 TWh | 53.4 mi |
| Red Hills Generating Facility | Ackerman, MS | 2.3 TWh | 34.7 mi |
| SR Houston | Houston, MS | 1.5 GWh | 41.3 mi |
| Walnut Grove Demonstration Plant | Walnut Grove, MS | 3.6 GWh | 75.5 mi |
| WestRock Demopolis Mill | Demopolis, AL | 313.0 GWh | 76.4 mi |