Oak Ridge Solar
2387 Girard Rd, Oak Ridge, LA 71264Plant Summary Information
Oak Ridge Solar is ranked #34 out of 82 power plants in Louisiana in terms of total annual net electricity generation.
Oak Ridge Solar generated 122.3 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Oak Ridge Solar |
|---|---|
| Utility Name | AES Clean Energy |
| Location | Morehouse Parish, LA |
| Initial Operation Date | December 2023 |
| Last Update | Sep 2025 |
| Annual Generation | 422.4 GWh |
| Annual Consumption | 1.6 M MMBtu |
| Ranked #1,517 out of 12,539 Power Plants Nationwide | |
| Ranked #141 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #34 out of 82 Louisiana Power Plants | |
| Ranked #2 out of 15 Louisiana Solar Power Plants | |
| Fuel Types | Solar |
Map of Oak Ridge Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Oak Ridge Solar.
Monthly Net Generation for Oak Ridge Solar
Oak Ridge Solar Details
| Summary Information | |
|---|---|
| Plant Name | Oak Ridge Solar (66193) |
| Plant Address | 2387 Girard Rd, Oak Ridge, LA 71264 |
| Utility | AES Clean Energy (64904) |
| Latitude, Longitude | 32.575, -91.7884 |
| Generation Dates on File | Jan 2024 to Sep 2025 |
| Initial Operation Date | December 2023 |
| Annual Generation | 422.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Entergy Louisiana LLC (11241) LA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator OAKRG Details Operating December 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 260 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Oak Ridge Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #131 | Tres Bahias | Port Lavaca, TX | 438.7 GWh |
| #132 | Chaparral Springs | Rosamond, CA | 427.8 GWh |
| #133 | Pleinmont Solar 2 | Spotsylvania, VA | 434.2 GWh |
| #134 | Muscle Shoals | Cherokee, AL | 431.2 GWh |
| #135 | Maple Flats | Louisville, IL | 430.5 GWh |
| #136 | AP Sunray LLC | Knippa, TX | 430.4 GWh |
| #137 | Big Cypress Solar, LLC | Crawfordsville, AR | 429.0 GWh |
| #138 | Pearl River Solar Park LLC | Morton, MS | 427.0 GWh |
| #139 | Brazoria West | Damon, TX | 426.8 GWh |
| #140 | Brazoria County Solar Project (Danciger) | Damon, TX | 423.6 GWh |
| #142 | Misae Solar | Childress, TX | 418.4 GWh |
| #143 | Chestnut | Lemoore, CA | 390.8 GWh |
| #144 | Cutlass Solar II | Richmond, TX | 411.9 GWh |
| #145 | Wright Solar Park | Los Banos, CA | 411.4 GWh |
| #146 | Mount Signal Solar Farm II | Calexico, CA | 410.2 GWh |
| #147 | Crane Solar Project | Crane, TX | 407.8 GWh |
| #148 | Mustang Two | Lemoore, CA | 406.5 GWh |
| #149 | Sun Streams, LLC | Arlington, AZ | 405.6 GWh |
| #150 | North Rosamond Solar LLC | Rosamond, CA | 405.3 GWh |
| #151 | Angelo Solar | San Angelo, TX | 405.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Oak Ridge Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ashley-Chicot Solar | Hamburg, AR | 2.2 GWh | 47.3 mi |
| Bayou Galion Solar Project | Mer Rouge, LA | 211.1 GWh | 15.4 mi |
| Chicot Solar | Lake Village, AR | 219.8 GWh | 67.4 mi |
| Clearwater Paper APP CB | Arkansas City, AR | 126.2 GWh | 84.4 mi |
| Crossett SD | Crossett, AR | 2.2 GWh | 39.4 mi |
| Crossett Solar | Crossett, AR | 210.3 GWh | 37.2 mi |
| El Dorado AR | El Dorado, AR | 1.6 GWh | 65.4 mi |
| Ergon Refining Vicksburg | Vicksburg, MS | 31.8 GWh | 52.9 mi |
| General Dynamics | Hampton, AR | 3.6 GWh | 83.3 mi |
| Georgia-Pacific Crossett LLC | Crossett, AR | 4.4 GWh | 40.7 mi |
| Gerald Andrus | Greenville, MS | 434.9 GWh | 66.2 mi |
| Grand Gulf | Port Gibson, MS | 11.4 TWh | 58.4 mi |
| International Paper Vicksburg Mill | Vicksburg, MS | 232.8 GWh | 59.2 mi |
| Louisiana Tech University Power Plant | Ruston, LA | 42.3 GWh | 50.3 mi |
| Ouachita | Sterlington, LA | 4.3 TWh | 18.6 mi |
| Perryville Power Station | Sterlington, LA | 3.5 TWh | 15.6 mi |
| Plant 31 Paper Mill | West Monroe, LA | 523.0 GWh | 21.9 mi |
| Prairie Mist Solar | Montrose, AR | 225.1 GWh | 47.5 mi |
| Union Power Station | El Dorado, AR | 9.3 TWh | 68.1 mi |
| Westrock Hodge (LA) | Hodge, LA | 466.5 GWh | 58.6 mi |