Exchequer
9188 Village Drive, Snelling, CA 95369Plant Summary Information
Exchequer is ranked #41 out of 209 hydroelectric power plants in California in terms of total annual net electricity generation.
Exchequer is comprised of 1 generator and generated 23.1 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Exchequer |
|---|---|
| Utility Name | Merced Irrigation District |
| Location | Mariposa County, CA |
| Initial Operation Date | July 1967 |
| Last Update | Dec 2024 |
| Annual Generation | 267.9 GWh |
| Annual Consumption | 926.7 k MMBtu |
| Ranked #2,104 out of 12,539 Power Plants Nationwide | |
| Ranked #173 out of 1,332 Water Power Plants Nationwide | |
| Ranked #204 out of 1,600 California Power Plants | |
| Ranked #41 out of 209 California Water Power Plants | |
| Fuel Types | Water |
Map of Exchequer
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Exchequer.
Monthly Net Generation for Exchequer
Exchequer Details
| Summary Information | |
|---|---|
| Plant Name | Exchequer (409) |
| Plant Address | 9188 Village Drive, Snelling, CA 95369 |
| Utility | Merced Irrigation District (12312) |
| Latitude, Longitude | 37.58435, -120.26859 |
| Generation Dates on File | Jan 2001 to Dec 2024 |
| Initial Operation Date | July 1967 |
| Annual Generation | 267.9 GWh |
| Fuel Types | Water |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Lake Mcclure-Merced River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator 1 Details Operating July 1967
| Technology | Conventional Hydroelectric |
|---|---|
| Prime Mover | Hydroelectric Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | POD_EXCHEC_7_UNIT 1-APND |
| Nameplate Capacity | 94.5 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 94.5 MW |
| Winter Capacity | 94.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 1967 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Water |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
Exchequer Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #163 | Lost Creek | Trail, OR | 289.1 GWh |
| #164 | Moccasin | Moccasin, CA | 279.7 GWh |
| #165 | Don Pedro | La Grange, CA | 277.5 GWh |
| #166 | New Melones | Jamestown, CA | 275.9 GWh |
| #167 | Walters | Waterville, NC | 275.3 GWh |
| #168 | Canyon Ferry | Helena, MT | 275.1 GWh |
| #169 | Millers Ferry | Camden, AL | 272.7 GWh |
| #170 | Roanoke Rapids | Roanoke Rapids, NC | 271.7 GWh |
| #171 | Camino | Camino, CA | 271.0 GWh |
| #172 | Jordan Dam | Wetumpka, AL | 270.7 GWh |
| #174 | Hiwassee Dam | Murphy, NC | 267.2 GWh |
| #175 | Holter | Wolf Creek, MT | 265.8 GWh |
| #176 | Bellows Falls | Bellow Falls, VT | 264.4 GWh |
| #177 | Rumford Falls Hydro Facility | Rumford, ME | 260.5 GWh |
| #178 | Greenup Hydro | Franklin Furnace, OH | 261.5 GWh |
| #179 | Gaston | Roanoke Rapids, NC | 261.3 GWh |
| #180 | St Stephen | St. Stephen, SC | 258.6 GWh |
| #181 | Wateree Hydro | Ridgeway, SC | 255.3 GWh |
| #182 | Morony | Great Falls, MT | 255.0 GWh |
| #183 | Spier Falls | Gansevoort, NY | 249.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Exchequer.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2097 Helton Solar Project | Merced, CA | 1.6 GWh | 20.7 mi |
| Broadway 3 - UC Merced 1 | Merced, CA | 901.0 MWh | 17.6 mi |
| Don Pedro | La Grange, CA | 277.5 GWh | 11.3 mi |
| Hickman | Hickman, CA | 3.6 GWh | 26.3 mi |
| La Grange | La Grange, CA | 4.4 GWh | 11.2 mi |
| McSwain | Snelling, CA | 31.8 GWh | 4.9 mi |
| Merced Falls | Snelling, CA | 9.4 GWh | 5.4 mi |
| Merced Solar LLC | Merced, CA | 3.8 GWh | 24.9 mi |
| Mission Solar LLC | Merced, CA | 3.8 GWh | 24.8 mi |
| Moccasin | Moccasin, CA | 279.7 GWh | 15.6 mi |
| Moccasin Low Head Hydro Project | Moccasin, CA | 4.0 MWh | 16.2 mi |
| Pacific-Ultrapower Chinese Station | Jamestown, CA | 138.2 GWh | 23 mi |
| Parker | Snelling, CA | 5.5 GWh | 12.1 mi |
| R C Kirkwood | Groveland, CA | 404.0 GWh | 26.6 mi |
| Sierra Pacific Chinese Camp | Chinese Camp, CA | 4.6 GWh | 23 mi |
| Sierra Pacific Sonora | Standard, CA | 34.9 GWh | 26.5 mi |
| Sonora 1 | Jamestown, CA | 621.0 MWh | 25.4 mi |
| Turlock Lake | Hickman, CA | 7.0 GWh | 17.9 mi |
| UC Merced Solar Hybrid | Merced, CA | 6.5 GWh | 17.6 mi |
| Upper Dawson | La Grange, CA | 10.7 GWh | 12 mi |