CSU Fresno Solar Project

5241 North Maple Ave., Fresno, CA 93740

Plant Summary Information

CSU Fresno Solar Project is ranked #816 out of 885 solar farms in California in terms of total annual net electricity generation.

CSU Fresno Solar Project generated 187.0 MWh during the 3-month period between September 2025 to December 2025.

Plant NameCSU Fresno Solar Project
Utility NameMMA Fresno Power LP
LocationFresno County, CA
Initial Operation DateDecember 2007
Last Update Dec 2025
Annual Generation 1.3 GWh
Annual Consumption 4.5 k MMBtu
Ranked #11,831 out of 13,081 Power Plants Nationwide
Ranked #6,588 out of 7,015 Solar Power Plants Nationwide
Ranked #1,512 out of 1,606 California Power Plants
Ranked #816 out of 885 California Solar Power Plants
Fuel Types Solar

Map of CSU Fresno Solar Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CSU Fresno Solar Project.

Create Your Account Today

Monthly Net Generation for CSU Fresno Solar Project

Monthly Plant Fuel Consumption for CSU Fresno Solar Project

CSU Fresno Solar Project Details

Summary Information
Plant NameCSU Fresno Solar Project (56813)
Plant Address5241 North Maple Ave., Fresno, CA 93740
UtilityMMA Fresno Power LP (56028)
Latitude, Longitude36.80984, -119.74167
Generation Dates on FileJan 2008 to Dec 2025
Initial Operation DateDecember 2007
Annual Generation 1.3 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number08-92-00
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 12.47 kV
Energy StorageNo

Generator 1 Details Operating December 2007

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2007
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle30
DC Net Capacity0.6 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.5 MW
Virtual Net Metering AgreementNo

Generator 2 Details Operating December 2007

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity0.5 MW
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2007
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle2
DC Net Capacity0.6 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity0.5 MW
Virtual Net Metering AgreementNo

CSU Fresno Solar Project Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6578FRV SI Transport Solar LPSacramento, CA1.3 GWh
#6579Kapolei Solar Energy ParkKapolei, HI1.3 GWh
#6580Town of East Bridgewater CSGEast Bridgewater, MA1.3 GWh
#6581Benz Solar 2Ansonia, CT1.3 GWh
#6582Benz Solar 1Ansonia, CT1.3 GWh
#6583Sutton Solar 2, LLC CSGSutton, MA1.3 GWh
#6584Green Lake SolarInterlochen, MI1.3 GWh
#6585E. Goenner Project CSGClear Lake, MN1.3 GWh
#6586ALDI DC 2South Windsor, CT1.3 GWh
#6587MN CSG 2019-77Northfield, MN1.3 GWh
#6589Sudbury LandfillSudbury, MA1.3 GWh
#6590Elroy SolarMauston, WI1.3 GWh
#6591SCH County - (1E) 398 Anthony St SchenecSchenectady, NY1.3 GWh
#6592CS Murphy Point, LLCMurphy, NC1.3 GWh
#6593Intel FolsomFolsom, CA1.3 GWh
#6594Kent County - Worton ComplexWorton, MD1.3 GWh
#6595Dinuba Wastewater Treatment PlantDinuba, CA1.3 GWh
#6596Afton SolarAfton, NY1.3 GWh
#6597Summit Water Nexus Mt. Holly, LLC SolarLumberton, NJ1.3 GWh
#6598Barneveld SolarBarneveld, NY1.3 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding CSU Fresno Solar Project.

Plant NamePlant LocationAnnual GenerationDistance
Algonquin Power Sanger LLCSanger, CA3.6 GWh13.6 mi
CA - Fresno County - Juvenile HallFresno, CA552.0 MWh10.3 mi
Clovis East High SchoolClovis, CA1.3 GWh5.6 mi
Clovis High SchoolClovis, CA1.6 GWh3.3 mi
Clovis North High SchoolFresno, CA1.5 GWh5.6 mi
Fresno Bullard High School HybridFresno, CA2.1 GWh3.9 mi
Fresno Community SolarFresno, CA16.9 GWh11.2 mi
Fresno Hoover High School HybridFresno, CA2.0 GWh1.7 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh5.4 mi
Friant Hydro FacilityFriant, CA73.5 GWh13.1 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh2.7 mi
JD Foods - JD FoodsFresno, CA2.5 GWh7.5 mi
La Joya Del SolFresno, CA806.0 MWh9.6 mi
Malaga Power LLCFresno, CA4.2 GWh8.3 mi
National RaisinFowler, CA4.6 GWh13.4 mi
OK Produce Fresno CarportFresno, CA3.3 GWh6.2 mi
POM Plant 2Del Rey, CA3.4 GWh13.4 mi
Saint Agnes Medical CenterFresno, CA32.0 GWh2.2 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh5.3 mi
SCCCD - Fresno Community CollegeFresno, CA2.8 GWh4.3 mi