Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| SFDK Solar | AES Distributed Energy | Vallejo, CA | California Independent System Operator (CISO) | 10.2 GWh | Nov 2019 | Dec 2024 | Solar |
| DWW Solar ll | DWW Solar ll LLC | Simsbury, CT | ISO New England (ISNE) | 44.6 GWh | Nov 2019 | Feb 2026 | Solar |
| Crooked Run | Cubico USA, LLC | Willard, NC | Duke Energy Progress East (CPLE) | 135.2 GWh | Nov 2019 | Feb 2026 | Solar |
| CED Northampton Solar LLC Hybrid | Consolidated Edison Development Inc. | Northampton, MA | ISO New England (ISNE) | 6.8 GWh | Nov 2019 | Dec 2024 | Solar |
| MHG Wallingford | Standard Solar | Wallingford, VT | ISO New England (ISNE) | 3.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Richmond Solar Park 3 | Indiana Municipal Power Agency | Richmond, IN | PJM Interconnection, LLC (PJM) | 11.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Thanksgiving Fire Solar Farm, LLC | Sol Systems | Zebulon, NC | Duke Energy Progress East (CPLE) | 3.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Ida Grove II | MidAmerican Energy Co | Ida Grove, IA | Midcontinent Independent System Operator, Inc. (MISO) | 698.6 GWh | Nov 2019 | Feb 2026 | Wind |
| Holiday Hill Community Wind | Greenbacker Renewable Energy Corporation | Russell, MA | ISO New England (ISNE) | 10.1 GWh | Nov 2019 | Dec 2024 | Wind |
| Glen Ullin Energy Center | ALLETE Clean Energy | Glen Ullin, ND | Midcontinent Independent System Operator, Inc. (MISO) | 426.2 GWh | Nov 2019 | Feb 2026 | Wind |
| DG AMP 1048 Wadsworth | DG AMP Solar, LLC | Wadsworth, OH | PJM Interconnection, LLC (PJM) | 10.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Syncarpha Blandford Hybrid CSG | Syncarpha Blandford, LLC | Blandford, MA | ISO New England (ISNE) | 8.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Whitetail Solar 1 | Lightsource Renewable Energy Asset Management, LLC | Newburg, PA | PJM Interconnection, LLC (PJM) | 25.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Bluewater CDEC 1 | Lightsource Renewable Energy Asset Management, LLC | Bluewater, NM | Public Service Company of New Mexico (PNM) | 6.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Grants CDEC 2 | Lightsource Renewable Energy Asset Management, LLC | Grants, NM | Public Service Company of New Mexico (PNM) | 12.1 GWh | Nov 2019 | Dec 2024 | Solar |
| ESA Four Oaks 2 NC LLC | ESA Four Oaks 2 NC LLC | Four Oaks, NC | Duke Energy Progress East (CPLE) | 3.2 GWh | Nov 2019 | Dec 2024 | Solar |
| 25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Nov 2024 | Solar |
| RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Johnstown Solar 1, LLC | AES Distributed Energy | Gloversville, NY | New York Independent System Operator (NYIS) | 5.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Canadian Breaks, LLC | Canadian Breaks LLC | Vega, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 763.7 GWh | Nov 2019 | Feb 2026 | Wind |
| FastSun 13 CSG | Altus Power America Management, LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 14 CSG | Altus Power America Management, LLC | Eagle Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 8 CSG | Altus Power America Management, LLC | Courtland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 3 CSG | Altus Power America Management, LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 7 CSG | Altus Power America Management, LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2024 | Solar |
| FastSun 1 CSG | Altus Power America Management, LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Duke Energy CHP at Clemson University | Duke Energy Carolinas, LLC | Clemson, SC | Duke Energy Carolinas (DUK) | 95.0 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Upper Marlboro 1 CSG | Nautilus Solar Solutions | Upper Marlboro, MD | PJM Interconnection, LLC (PJM) | 3.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Eagle Creek | ZGlobal Inc | Taft, CA | California Independent System Operator (CISO) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Gibbons CSG | Nautilus Solar Solutions | Snow Hill, MD | PJM Interconnection, LLC (PJM) | 3.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Dakota Community Solar One LLC CSG | Madison Energy Holdings LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Douglas Todd Community Solar One LLC CSG | Madison Energy Holdings LLC | Osakis, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Meeker Community Solar One LLC CSG | Madison Energy Holdings LLC | Dassel, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| McLeod Community Solar One LLC CSG | Madison Energy Holdings LLC | Stewart, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Stearns Community Solar One LLC CSG | Madison Energy Holdings LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Sherburne Community Solar One LLC CSG | Madison Energy Holdings LLC | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Syncarpha El Rito | Syncarpha El Rito I, LLC | El Rito, NM | Public Service Company of New Mexico (PNM) | 3.5 GWh | Nov 2019 | Dec 2024 | Solar |
| West Street Solar 1 LLC | AES Distributed Energy | Gardner, MA | ISO New England (ISNE) | 8.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Tippecanoe Solar Power Plant | Duke Energy Indiana, LLC | West Lafayette, IN | Midcontinent Independent System Operator, Inc. (MISO) | 2.7 GWh | Nov 2019 | Nov 2024 | Solar |
| USS Greenhouse Solar LLC CSG | Standard Solar | Pine Island, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.2 GWh | Nov 2019 | Dec 2024 | Solar |
| USS Cheyenne Solar LLC CSG | Standard Solar | Chisago City, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| USS Midtown Solar LLC CSG | Standard Solar | Melrose, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2024 | Solar |
| USS Monarch Solar LLC CSG | Standard Solar | Brooten, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Hartmann Project CSG | Hartmann Community Solar LLC | Saint Cloud, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.3 GWh | Nov 2019 | Dec 2024 | Solar |
| E. Goenner Project CSG | E. Goenner Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Schwinghamer Project CSG | Schwinghamer Community Solar LLC | Albany, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Rio Rancho Solar Energy Center | PNM Resources | Rio Rancho, NM | Public Service Company of New Mexico (PNM) | 23.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Imeson Solar | Imeson Solar Farm LLC | Jscksonville, FL | JEA (JEA) | 8.6 GWh | Nov 2019 | Dec 2024 | Solar |
| FL Solar 4, LLC | Onward Energy | Tallahassee, FL | City of Tallahassee (TAL) | 70.1 GWh | Nov 2019 | Feb 2026 | Solar |
| AGA TAG Solar IV LLC | AGA TAG Solar IV LLC | Leland, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2019 | Dec 2024 | Solar |
| Sherman Solar | Ecos Energy LLC | Griswold, CT | ISO New England (ISNE) | 1.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Jackson Solar (CT) | Ecos Energy LLC | Griswold, CT | ISO New England (ISNE) | 1.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Limelight Solar II LLC | Limelight Solar II LLC | Spartanburg, SC | Duke Energy Carolinas (DUK) | 1.9 GWh | Nov 2019 | Dec 2024 | Solar |
| ATOOD Solar III LLC | ATOOD Solar III LLC | Spartanburg, SC | Duke Energy Carolinas (DUK) | 2.7 GWh | Nov 2019 | Dec 2024 | Solar |
| AES Kekaha Solar, LLC Hybrid | AES Distributed Energy | Kekaha, HI | 26.0 GWh | Nov 2019 | Dec 2024 | Solar | |
| Garrett Solar | SOLV Energy, LLC | Lakeview, OR | PacifiCorp West (PACW) | 22.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Bright Stalk Wind Farm I | Lexington Chenoa Wind Farm LLC | Chenoa, IL | PJM Interconnection, LLC (PJM) | 719.5 GWh | Nov 2019 | Feb 2026 | Wind |
| Alton Road Solar | Revity Energy LLC | Bradford, RI | ISO New England (ISNE) | 23.6 GWh | Nov 2019 | Dec 2024 | Solar |
| CalTech - Pasadena Wilson Ave | Bloom Energy | Pasadena, CA | California Independent System Operator (CISO) | 10.1 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Beaker | Strata Manager, LLC | Farmville, NC | Duke Energy Progress East (CPLE) | 10.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Gilead | Strata Manager, LLC | Gilead, NC | Duke Energy Progress East (CPLE) | 5.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Gladstone Farm | Strata Manager, LLC | West End, NC | Duke Energy Progress East (CPLE) | 10.8 GWh | Nov 2019 | Dec 2024 | Solar |
| Truman (NC) | Strata Manager, LLC | Wendell, NC | Duke Energy Progress East (CPLE) | 10.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Seagrove | Strata Manager, LLC | Seagrove, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2019 | Dec 2024 | Solar |
| Long Plain Solar | Long Plain Solar, LLC | Whatley, MA | ISO New England (ISNE) | 3.6 GWh | Nov 2019 | Dec 2024 | Solar |
| East Fishkill CSG | Altus Power America Management, LLC | East Fishkill, NY | New York Independent System Operator (NYIS) | 3.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Oxbow Creek | Oxbow Creek Energy LLC | Factoryville, PA | PJM Interconnection, LLC (PJM) | 41.0 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Wright Solar Park | Wright Solar Park LLC | Los Banos, CA | California Independent System Operator (CISO) | 403.3 GWh | Nov 2019 | Feb 2026 | Solar |
| Starvation | Starvation Solar I, LLC | Hines, OR | Bonneville Power Administration (BPAT) | 23.5 GWh | Nov 2019 | Dec 2024 | Solar |
| OE_AZ1 | Onward Energy | Salome, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 79.5 GWh | Nov 2019 | Feb 2026 | Solar |
| OE_GA3 | Onward Energy | Camilla, GA | Southern Company Services, Inc. - Trans (SOCO) | 122.2 GWh | Nov 2019 | Feb 2026 | Solar |
| Hope Solar Farm LLC | Green Street Power Partners | Troy, NY | New York Independent System Operator (NYIS) | 3.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Catlin Solar 1 LLC | Green Street Power Partners | Beaver Dams, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Saratoga Solar LLC | Green Street Power Partners | Milton, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2019 | Dec 2024 | Solar |
| CP Middletown Solar I LLC | Green Street Power Partners | Middletown, CT | ISO New England (ISNE) | 1.7 GWh | Nov 2019 | Dec 2024 | Solar |
| CP Middletown Solar II LLC | Green Street Power Partners | Middletown, CT | ISO New England (ISNE) | 1.7 GWh | Nov 2019 | Dec 2024 | Solar |
| ATOOD Solar IV, LLC | Cardinal Renewables | Leland, NC | Duke Energy Progress East (CPLE) | 7.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Shelby Solar Array | AEP Onsite Partners, LLC | Shelby, OH | PJM Interconnection, LLC (PJM) | 3.3 GWh | Nov 2019 | Feb 2026 | Solar |
| DEC Phase II at Georgetown | Luminace Solar MC, LLC | Georgetown, DE | PJM Interconnection, LLC (PJM) | 5.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Cuming County Renewables, LLC | Cuming County Renewables. LLC | Wisner, NE | Southwest Power Pool (SWPP) | 8.9 GWh | Nov 2019 | Dec 2024 | Wind |
| Kearsarge Amesbury Hybrid | Kearsarge Amesbury LLC | Amesbury, MA | ISO New England (ISNE) | 5.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Vermillion River_MN_GRE DEA-GM | SoCore Energy LLC | Farmington, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Tickle Creek Solar | Neighborhood Power Corp. | Sandy, OR | Portland General Electric Company (PGE) | 3.1 GWh | Nov 2019 | Dec 2024 | Solar |
| Chenango Solar | Citizens Enterprises Corporation | Castle Creek, NY | New York Independent System Operator (NYIS) | 6.5 GWh | Nov 2019 | Dec 2024 | Solar |
| Bonefish Solar | Bonefish Solar, LLC | Manning, SC | Duke Energy Carolinas (DUK) | 4.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Calabro Airport North Solar Project | CVI Renewables Holdings, LLC. | Shirley, NY | New York Independent System Operator (NYIS) | 2.4 GWh | Nov 2019 | Dec 2024 | Solar |
| Calabro Airport South Solar Project | CVI Renewables Holdings, LLC. | Shirley, NY | New York Independent System Operator (NYIS) | 2.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Cherry Blossom Solar LLC | CBH Lessor LLC | Hemingway, SC | Duke Energy Progress East (CPLE) | 18.7 GWh | Nov 2019 | Dec 2024 | Solar |
| Jersey City DWP | Onyx Asset Services Group | Jersey City, NJ | PJM Interconnection, LLC (PJM) | 1.2 GWh | Nov 2019 | Dec 2024 | Solar |
| Britton Solar Energy Center | Exus New Mexico | Moriarty, NM | Public Service Company of New Mexico (PNM) | 141.5 GWh | Nov 2019 | Feb 2026 | Solar |
| SR Kersey II | SR Kersey II, LLC | Kersey, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 2.2 GWh | Nov 2019 | Dec 2024 | Solar |
| SR Skylark C | SR Skylark C, LLC | Windsor, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 2.3 GWh | Nov 2019 | Dec 2024 | Solar |
| ATT North Watney | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 8.2 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| Scenic Hill Solar IV, LLC | Greenbacker Renewable Energy Corporation | Clarksville, AR | Southwest Power Pool (SWPP) | 3.7 GWh | Nov 2019 | Dec 2024 | Solar |
| One Patriot | Bloom Energy | Foxborough, MA | ISO New England (ISNE) | 16.3 GWh | Nov 2019 | Dec 2024 | Natural Gas |
| M72 West Solar | Heritage Sustainable Energy. LLC | Traverse City, MI | Midcontinent Independent System Operator, Inc. (MISO) | 2.5 GWh | Nov 2019 | Dec 2024 | Solar |
| University Solar, LLC | AES Distributed Energy | West Greenwich, RI | ISO New England (ISNE) | 26.4 GWh | Nov 2019 | Feb 2026 | Solar |
| Oak Street Solar | Citizens Enterprises Corporation | Springfield, MA | ISO New England (ISNE) | 5.6 GWh | Nov 2019 | Dec 2024 | Solar |
| Lineage Logistics Solar | DG Illinois Solar, LLC | University Park, IL | PJM Interconnection, LLC (PJM) | 2.7 GWh | Nov 2019 | Dec 2024 | Solar |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 185 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,679 | 13,090.02 GWh |
| Colorado | # 31 | 296 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 291 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 269 | 9,944.77 GWh |
| Minnesota | # 28 | 764 | 4,707.75 GWh |
| Mississippi | # 23 | 57 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 125 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 950 | 10,653.43 GWh |
| North Carolina | # 7 | 904 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 142 | 6,415.64 GWh |
| Oregon | # 21 | 271 | 6,135.97 GWh |
| Pennsylvania | # 2 | 252 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 237 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 243 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |