Trask East Solar
Parker Drive and Bluebird Lane, Beaufort, SC 29906Plant Summary Information
Trask East Solar is ranked #21 out of 119 solar farms in South Carolina in terms of total annual net electricity generation.
Trask East Solar generated 5.5 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Trask East Solar |
|---|---|
| Utility Name | Dominion Renewable Energy |
| Location | Beaufort County, SC |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2024 |
| Annual Generation | 27.6 GWh |
| Annual Consumption | 98.2 k MMBtu |
| Ranked #4,854 out of 12,539 Power Plants Nationwide | |
| Ranked #1,273 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #63 out of 196 South Carolina Power Plants | |
| Ranked #21 out of 119 South Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Trask East Solar (2018 to 2021) Dominion Renewable Energy (2022 to 2024) |
Map of Trask East Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Trask East Solar.
Monthly Net Generation for Trask East Solar
Trask East Solar Details
| Summary Information | |
|---|---|
| Plant Name | Trask East Solar (62346) |
| Plant Address | Parker Drive and Bluebird Lane, Beaufort, SC 29906 |
| Utility | Dominion Renewable Energy (58468) |
| Latitude, Longitude | 32.47061, -80.74819 |
| Generation Dates on File | Jan 2021 to Dec 2024 |
| Initial Operation Date | December 2020 |
| Annual Generation | 27.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF17-192-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Dominion Energy South Carolina (SCEG) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Dominion Energy South Carolina (17539) SC |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator 83 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 12 MW |
| Summer Capacity | 12 MW |
| Winter Capacity | 12 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 17 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Trask East Solar Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Dominion Energy Inc. | 120 Tredegar St., Richmond, VA 23219 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1263 | Letts Creek Solar, LLC | Grass Lake, MI | 28.1 GWh |
| #1264 | Two Mile Desert Project | Hertford, NC | 28.1 GWh |
| #1265 | DeSoto Next Generation Solar Energy | Arcadia, FL | 28.1 GWh |
| #1266 | Facebook 2 Solar Energy Center | Albuquerque, NM | 28.1 GWh |
| #1267 | Gold Meadow Farms | Cranston, RI | 28.0 GWh |
| #1268 | Facebook 3 Solar Energy Center | Albuquerque, NM | 27.9 GWh |
| #1269 | Camden Solar LLC | South Camden, NC | 27.9 GWh |
| #1270 | Wildflower Solar 1 | Elverta, CA | 27.9 GWh |
| #1271 | Morgan's Corner | Elizabeth City, NC | 27.8 GWh |
| #1272 | Electric City Solar | Sturgis, MI | 27.8 GWh |
| #1274 | Maryland Solar | Hagerstown, MD | 27.6 GWh |
| #1275 | Tropico Solar PV Plant | Delano, CA | 27.4 GWh |
| #1276 | Santolina Solar Energy Center | Albuquerque, NM | 27.4 GWh |
| #1277 | Bonanza | Vernal, UT | 2.5 TWh |
| #1278 | SJA Solar LLC-Solterra Monastery CSG | Spencer, MA | 27.3 GWh |
| #1279 | Java Solar, LLC | Lemoore, CA | 27.2 GWh |
| #1280 | CSWIND America Inc. | Pueblo, CO | 27.2 GWh |
| #1281 | Cumblerland Land Holdings, LLC | Elkmont, AL | 27.2 GWh |
| #1282 | KDC Solar PR1, LLC | Jackson, NJ | 27.1 GWh |
| #1283 | SunE EPE1 LLC | Chaparral, NM | 27.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Trask East Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bobby C Smith Jr Energy Facility | Rincon, GA | 3.0 TWh | 34 mi |
| Colleton Solar Farm | Walterboro, SC | 3.4 GWh | 30.8 mi |
| Estill Solar II | Estill, SC | 17.4 GWh | 34.4 mi |
| Hilton Head | Hilton Head Island, SC | 700.0 MWh | 18.3 mi |
| IKEA Savannah 490 | Port Wentworth, GA | 1.8 GWh | 32.1 mi |
| Imperial Savannah LP | Port Wentworth, GA | 52.8 GWh | 32.4 mi |
| International Paper Savanna Mill | Savannah, GA | 633.3 GWh | 33.7 mi |
| Jasper | Hardeeville, SC | 3.4 TWh | 23.2 mi |
| McIntosh | Rincon, GA | 38.7 GWh | 25.7 mi |
| McIntosh Combined Cycle Facility | Rincon, GA | 8.1 TWh | 26.7 mi |
| McIntosh Solar | Rincon, GA | 9.5 GWh | 26.1 mi |
| MCRD Parris Island PV Hybrid | Parris Island, SC | 32.2 GWh | 10.2 mi |
| Moffett Solar Project | Ridgeland, SC | 135.5 GWh | 17.8 mi |
| Port Wentworth Mill | Port Wentworth, GA | 421.0 GWh | 32.4 mi |
| Ridgeland Solar Project | Ridgeland, SC | 19.9 GWh | 12.4 mi |
| Rincon Solar I | Rincon, GA | 25.2 GWh | 33.6 mi |
| Savannah River Mill | Rincon, GA | 133.4 GWh | 28.1 mi |
| SCE&G Nimitz CSG | Ridgeland, SC | 13.8 GWh | 12.3 mi |
| Seabrook Solar | Seabrook, SC | 85.3 GWh | 6.5 mi |
| Yemassee Solar | Yemassee, SC | 19.7 GWh | 18.5 mi |