Lakeside Solar Center
7365 State Road 710 East, Okeechobee, FL 34974Plant Summary Information
Lakeside Solar Center is ranked #99 out of 220 solar farms in Florida in terms of total annual net electricity generation.
Lakeside Solar Center generated 31.7 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Lakeside Solar Center |
|---|---|
| Utility Name | Florida Power & Light Co |
| Location | Okeechobee County, FL |
| Initial Operation Date | December 2020 |
| Last Update | Mar 2026 |
| Annual Generation | 145.5 GWh |
| Annual Consumption | 545.3 k MMBtu |
| Ranked #2,961 out of 12,332 Power Plants Nationwide | |
| Ranked #656 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #167 out of 325 Florida Power Plants | |
| Ranked #99 out of 220 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Lakeside Solar Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lakeside Solar Center.
Monthly Net Generation for Lakeside Solar Center
Monthly Plant Fuel Consumption for Lakeside Solar Center
Lakeside Solar Center Details
| Summary Information | |
|---|---|
| Plant Name | Lakeside Solar Center (62922) |
| Plant Address | 7365 State Road 710 East, Okeechobee, FL 34974 |
| Utility | Florida Power & Light Co (6452) |
| Latitude, Longitude | 27.21421, -80.74458 |
| Generation Dates on File | Dec 2020 to Mar 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 145.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Florida Power & Light Company (FPL) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Florida Power & Light Co (6452) FL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Fixed Tilt | Yes |
| Azimuth Angle | 205 |
| Tilt Angle | 16 |
| DC Net Capacity | 108 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Lakeside Solar Center Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #646 | Chestnut Solar | Enfield, NC | 147.0 GWh |
| #647 | Hibiscus Solar Energy Center | Westlake, FL | 146.8 GWh |
| #648 | Magnolia Solar | Mulberry, FL | 146.7 GWh |
| #649 | Sundew | Port St Lucie, FL | 146.4 GWh |
| #650 | Pelican Solar Center | Ft. Pierce, FL | 146.3 GWh |
| #651 | Mesquite Solar 5, LLC | Tonopah, AZ | 136.9 GWh |
| #652 | Cattle Ranch | Arcadia, FL | 145.9 GWh |
| #653 | Blackwater River Solar Energy Center | Milton, FL | 143.6 GWh |
| #654 | Everglades Solar Energy Center | Homestead, FL | 145.8 GWh |
| #655 | Sawgrass Solar Energy Center | Clewiston, FL | 145.8 GWh |
| #657 | Okeechobee Solar | Vero Beach, FL | 145.4 GWh |
| #658 | Mesquite Solar 4, LLC | Tonopah, AZ | 143.3 GWh |
| #659 | Pink Trial Solar Energy Center | Port St. Lucie, FL | 144.5 GWh |
| #660 | Hammock Solar | Labelle, FL | 143.8 GWh |
| #661 | Canoe | Holt, FL | 141.0 GWh |
| #662 | Greensville County Solar Project, LLC | Skippers, VA | 143.5 GWh |
| #663 | Monarch | TBD, FL | 142.9 GWh |
| #664 | New Madrid Solar, LLC | MO | 142.8 GWh |
| #665 | Barefoot Bay Solar Energy Center | Sebastian, FL | 142.8 GWh |
| #666 | Lithia Solar | Lithia, FL | 142.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lakeside Solar Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Water | TBD, FL | 185.8 GWh | 16.1 mi |
| Bluefield Preserve Solar | Okeechobee, FL | 140.4 GWh | 5 mi |
| Buttonwood | Fort Pierce, FL | 194.1 GWh | 23.7 mi |
| Fawn | TBD, FL | 187.5 GWh | 25 mi |
| Grove | Vero Beach, FL | 142.1 GWh | 26 mi |
| Honeybell | TBD, FL | 196.2 GWh | 20.3 mi |
| Indian River Solar Center | Vero Beach, FL | 139.1 GWh | 26.8 mi |
| Loggerhead Solar Energy Center | Port St. Lucie, FL | 131.2 GWh | 12.6 mi |
| Martin | Indiantown, FL | 8.3 TWh | 15.8 mi |
| Monarch | TBD, FL | 142.9 GWh | 18.5 mi |
| Orchard | Ft. Pierce, FL | 158.4 GWh | 26 mi |
| Pelican Solar Center | Ft. Pierce, FL | 146.3 GWh | 24.5 mi |
| Pineapple | Port St Lucie, FL | 152.1 GWh | 11 mi |
| Pink Trial Solar Energy Center | Port St. Lucie, FL | 144.5 GWh | 13.7 mi |
| Speckled Perch | TBD, FL | 193.7 GWh | 5.7 mi |
| Sundew | Port St Lucie, FL | 146.4 GWh | 12.6 mi |
| Sweetbay Solar Center | North of Indiantown, FL | 129.0 GWh | 19.7 mi |
| Treasure Coast Energy Center | Ft. Pierce, FL | 1.7 TWh | 25.4 mi |
| Turnpike | Vero Beach, FL | 168.0 GWh | 25.1 mi |
| White Tail | TBD, FL | 157.3 GWh | 24.4 mi |