Mohave County Wind Farm
20606 US 93, Willow Beach, AZ 86445Plant Summary Information
Mohave County Wind Farm is ranked #24 out of 169 power plants in Arizona in terms of total annual net electricity generation.
Mohave County Wind Farm generated 187.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Mohave County Wind Farm |
|---|---|
| Utility Name | Mohave County Wind Farm |
| Location | Mohave County, AZ |
| Initial Operation Date | December 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 997.2 GWh |
| Annual Consumption | 3.6 M MMBtu |
| Ranked #748 out of 12,613 Power Plants Nationwide | |
| Ranked #69 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #24 out of 169 Arizona Power Plants | |
| Ranked #1 out of 9 Arizona Wind Power Plants | |
| Fuel Types | Wind |
Map of Mohave County Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mohave County Wind Farm.
Monthly Net Generation for Mohave County Wind Farm
Monthly Plant Fuel Consumption for Mohave County Wind Farm
Mohave County Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Mohave County Wind Farm (63114) |
| Plant Address | 20606 US 93, Willow Beach, AZ 86445 |
| Utility | Mohave County Wind Farm (62916) |
| Latitude, Longitude | 35.79114, -114.5045 |
| Generation Dates on File | Oct 2020 to Dec 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 997.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Desert Southwest Region (WALC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | WAPA-- Western Area Power Administration (27000) AZ |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator MCWF Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | SP-15 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | SP-15 |
| Nameplate Capacity | 350 MW |
| Summer Capacity | 350 MW |
| Winter Capacity | 350 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 126 |
| Turbine Details | |
| Number Of Turbines | 126 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 17.9 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 295 |
Mohave County Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #59 | Radfords Run Wind Farm | Maroa, IL | 1.0 TWh |
| #60 | Flat Ridge 2 Wind Energy LLC | Zenda, KS | 1.0 TWh |
| #61 | Solomon Forks Wind Project, LLC | Colby, KS | 1.0 TWh |
| #62 | Soldier Creek Wind | Corning, KS | 1.0 TWh |
| #63 | Dakota Range Wind | Marvin, SD | 1.0 TWh |
| #64 | Priddy Wind Project | Goldthwaite, TX | 1.0 TWh |
| #65 | South Plains II | Lockney, TX | 1.0 TWh |
| #66 | Lincoln Land Wind | TBD, IL | 1.0 TWh |
| #67 | Pomeroy Wind Farm | Fonda, IA | 1.0 TWh |
| #68 | WPWP | Wellington, KS | 1.0 TWh |
| #70 | Roosevelt County | Portales, NM | 983.9 GWh |
| #71 | Caddo Wind | Apache, OK | 983.7 GWh |
| #72 | Milligan 1 Wind Farm | Western, NE | 981.4 GWh |
| #73 | TG East | Truscott, TX | 980.8 GWh |
| #74 | Nobles 2 Wind Project | Wilmont, MN | 973.7 GWh |
| #75 | Kingfisher Wind LLC | Kingfisher, OK | 956.4 GWh |
| #76 | Hubbard Wind | Mt Calm, TX | 956.3 GWh |
| #77 | Irish Creek Wind | Frankfort, KS | 938.7 GWh |
| #78 | Roadrunner Wind Farm | Cisco, TX | 931.6 GWh |
| #79 | Sapphire Sky Wind Energy LLC | Farmer City, IL | 925.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mohave County Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 110.5 GWh | 25 mi |
| CM10 | Boulder City, NV | 18.0 GWh | 27.4 mi |
| CM48 | Boulder City, NV | 94.3 GWh | 27.4 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 25.7 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 597.4 GWh | 26.3 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 26.4 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 691.4 GWh | 26.3 mi |
| Desert Star Energy Center | Boulder City, NV | 375.0 GWh | 27.4 mi |
| Hoover Dam (AZ) | Boulder City, AZ | 927.1 GWh | 20.3 mi |
| Hoover Dam (NV) | Boulder City, NV | 1.8 TWh | 20.3 mi |
| Nevada Solar One | Boulder City, NV | 89.5 GWh | 26.8 mi |
| River Mountains Solar | Henderson, NV | 33.6 GWh | 29 mi |
| Saguaro Power | Henderson, NV | 264.5 GWh | 33.2 mi |
| Searchlight Solar | Searchlight, NV | 45.7 GWh | 32.4 mi |
| Techren Solar I LLC | Boulder, NV | 224.1 GWh | 26.7 mi |
| Techren Solar II LLC | Boulder, NV | 491.9 GWh | 25.9 mi |
| Techren Solar III LLC | Boulder, NV | 54.0 GWh | 26.4 mi |
| Techren Solar IV LLC | Boulder, NV | 53.9 GWh | 25.2 mi |
| Techren Solar V | Boulder, NV | 108.0 GWh | 24.8 mi |
| Townsite Solar Project Hybrid | Boulder City, NV | 465.9 GWh | 23.5 mi |