ENGIE Long Draw Solar LLC
TBD, Gail, TX 79738Plant Summary Information
ENGIE Long Draw Solar LLC is ranked #36 out of 201 solar farms in Texas in terms of total annual net electricity generation.
ENGIE Long Draw Solar LLC generated 168.0 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | ENGIE Long Draw Solar LLC |
|---|---|
| Utility Name | Engie North America |
| Location | Borden County, TX |
| Initial Operation Date | December 2020 |
| Last Update | Sep 2025 |
| Annual Generation | 517.0 GWh |
| Annual Consumption | 1.9 M MMBtu |
| Ranked #1,303 out of 12,539 Power Plants Nationwide | |
| Ranked #97 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #262 out of 799 Texas Power Plants | |
| Ranked #36 out of 201 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of ENGIE Long Draw Solar LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for ENGIE Long Draw Solar LLC.
Monthly Net Generation for ENGIE Long Draw Solar LLC
ENGIE Long Draw Solar LLC Details
| Summary Information | |
|---|---|
| Plant Name | ENGIE Long Draw Solar LLC (62845) |
| Plant Address | TBD, Gail, TX 79738 |
| Utility | Engie North America (56201) |
| Latitude, Longitude | 32.74138, -101.62179 |
| Generation Dates on File | Dec 2020 to Sep 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 517.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Wind Energy Transmission Texas LLC (60066) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator SP1 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 225 MW |
| Summer Capacity | 225 MW |
| Winter Capacity | 225 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 287 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
ENGIE Long Draw Solar LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Engie Longdraw Solar LLC | 1990 Post Oak BLVD., Suite 1900, Houstin, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #87 | Azure Sky Solar | Haskell, TX | 533.2 GWh |
| #88 | Galloway 1 Solar Farm | Paint Rock, TX | 539.8 GWh |
| #89 | McFarland A Solar and Storage | Dateland, AZ | 527.6 GWh |
| #90 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 530.0 GWh |
| #91 | Escalante (NM) | Grants, NM | 526.4 GWh |
| #92 | RE Maplewood | McCamey, TX | 525.2 GWh |
| #93 | Harquahala 2 | Tonopah, AZ | 494.8 GWh |
| #94 | Brittlebush Solar | Coolidge, AZ | 522.6 GWh |
| #95 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 522.3 GWh |
| #96 | Pisgah Ridge Solar, LLC | Richland, TX | 522.0 GWh |
| #98 | Taygete Energy Project LLC | Coyanosa, TX | 515.9 GWh |
| #99 | Yellowbud Solar, LLC | Williamsport, OH | 515.0 GWh |
| #100 | Cool Springs Solar (Hybrid) | Bainbridge, GA | 513.2 GWh |
| #101 | Sky Ranch Solar | Belen, NM | 502.5 GWh |
| #102 | Sun Streams 3 | Arlington, AZ | 469.7 GWh |
| #103 | Dunns Bridge I Solar | Wheatfield, IN | 506.7 GWh |
| #104 | Scarlet Solar (CA) | Fresno, CA | 499.1 GWh |
| #105 | RE Tranquillity | Cantua Creek, CA | 491.4 GWh |
| #106 | Bernard Creek Solar | Hungerford, TX | 498.7 GWh |
| #107 | Fort Bend Solar LLC | East Bernard, TX | 497.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding ENGIE Long Draw Solar LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brazos Wind Farm | Fluvanna, TX | 658.7 GWh | 31 mi |
| Bull Creek Wind | O'Donnell, TX | 265.2 GWh | 13.2 mi |
| C R Wing Cogen Plant | Big Spring, TX | 133.7 GWh | 34.4 mi |
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 36.5 mi |
| Dermott Wind | Snyder, TX | 876.2 GWh | 38.5 mi |
| EG178 Facility | Snyder, TX | 713.1 GWh | 38.8 mi |
| Fluvanna | Fluvanna, TX | 520.0 GWh | 30.7 mi |
| Gopher Creek Wind Farm | Fluvanna, TX | 546.0 GWh | 25.7 mi |
| Gunsight Mountain Wind Energy LLC | Big Spring, TX | 460.7 GWh | 35.7 mi |
| Highpeak Solar 1 | Coahoma, TX | 13.8 GWh | 26.4 mi |
| Juno Solar Project | Lamesa, TX | 767.8 GWh | 13.6 mi |
| Lamesa II | Lamesa, TX | 118.8 GWh | 15.4 mi |
| Lamesa Solar | Lamesa, TX | 223.3 GWh | 17.8 mi |
| Lumina Solar Project | Snyder, TX | 687.8 GWh | 38.7 mi |
| Mesquite Creek Wind | Lamesa, TX | 533.3 GWh | 7.5 mi |
| Post Wind Farm LP | Fluvanna, TX | 314.8 GWh | 26.6 mi |
| Scurry County Wind LP | Snyder, TX | 205.4 GWh | 36.4 mi |
| Stanton Wind Energy LLC | Lenorah, TX | 253.9 GWh | 37.1 mi |
| Stephens Ranch Wind Energy LLC | O'Donnell, TX | 935.0 GWh | 12.9 mi |
| Tahoka Wind | Tahoka, TX | 1.2 TWh | 28.5 mi |