Las Lomas Wind Project
TBD, Falcon, TX 78564Plant Summary Information
Las Lomas Wind Project is ranked #94 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Las Lomas Wind Project generated 151.8 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Las Lomas Wind Project |
|---|---|
| Utility Name | Engie North America |
| Location | Zapata County, TX |
| Initial Operation Date | December 2020 |
| Last Update | Mar 2026 |
| Annual Generation | 593.8 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #1,163 out of 12,332 Power Plants Nationwide | |
| Ranked #287 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #224 out of 814 Texas Power Plants | |
| Ranked #94 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Las Lomas Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Las Lomas Wind Project.
Monthly Net Generation for Las Lomas Wind Project
Monthly Plant Fuel Consumption for Las Lomas Wind Project
Las Lomas Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Las Lomas Wind Project (63101) |
| Plant Address | TBD, Falcon, TX 78564 |
| Utility | Engie North America (56201) |
| Latitude, Longitude | 26.69842, -99.05745 |
| Generation Dates on File | Dec 2020 to Mar 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 593.8 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WTG Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 201.6 MW |
| Summer Capacity | 201.6 MW |
| Winter Capacity | 201.6 MW |
| Minimum Load | 4.2 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 48 |
| Turbine Details | |
| Number Of Turbines | 48 |
|---|---|
| Predominant Turbine Manufacturer | Goldwind |
| Predominant Turbine Model Number | GW155/4200 |
| Design Wind Speed | 16.5 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 361 |
Las Lomas Wind Project Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Las Lomas Wind Project, LLC | 1990 Post Oak BLVD., Suite 1900, Houston, TX 77056 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #277 | Weatherford Wind Energy Center | Weatherford, OK | 602.5 GWh |
| #278 | Cedar Creek II | New Raymer, CO | 602.2 GWh |
| #279 | Dakota Range III Wind Project | Summit, SD | 600.2 GWh |
| #280 | Reloj del Sol Wind Farm | San Ygnacio, TX | 597.8 GWh |
| #281 | Bloom Wind | Minneola, KS | 595.8 GWh |
| #282 | Prairie Breeze | Elgin, NE | 595.7 GWh |
| #283 | Stella Wind Farm | Armstrong, TX | 595.1 GWh |
| #284 | Colorado Green Holdings LLC | Lamar, CO | 594.9 GWh |
| #285 | Panorama Wind, LLC | Grover, CO | 594.2 GWh |
| #286 | FPL Energy Ashtabula Wind LLC | Luverne, ND | 594.1 GWh |
| #288 | Bishop Hill Energy LLC | Cambridge, IL | 591.6 GWh |
| #289 | Mountain Breeze Wind, LLC | Grover, CO | 590.9 GWh |
| #290 | Jumbo Hill Wind Project | Andrews, TX | 589.3 GWh |
| #291 | Goodwell Wind Project LLC | Goodwell, OK | 589.3 GWh |
| #292 | Rattlesnake Power, LLC | Brady, TX | 586.5 GWh |
| #293 | Prairie Wind Farm | Montezuma, IA | 586.4 GWh |
| #294 | South Hurlburt Wind LLC | Arlington, OR | 584.7 GWh |
| #295 | Walnut Wind Farm | Walnut, IA | 584.1 GWh |
| #296 | King Creek Wind Farm 1, LLC | Throckmorton, TX | 582.2 GWh |
| #297 | Limon Wind I | Limon, CO | 581.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Las Lomas Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alexis Solar, LLC | Encino, TX | 12.6 GWh | 52.5 mi |
| Citrus City | Mission, TX | 245.0 MWh | 50.8 mi |
| Falcon Dam & Power | Falcon Heights, TX | 19.3 GWh | 11.8 mi |
| Frontera Energy Center | Mission, TX | 2.0 TWh | 53 mi |
| Hidalgo Wind Farm II | Edinburg, TX | 154.7 GWh | 40.2 mi |
| Hidalgo Wind Farm LLC | McCook, TX | 818.0 GWh | 43.1 mi |
| Javelina Wind Energy II, LLC | MIRANDO, TX | 688.7 GWh | 52 mi |
| Javelina Wind Energy, LLC | Mirando City, TX | 817.5 GWh | 43.1 mi |
| Los Vientos V Wind Power | Rio Grande City, TX | 233.6 GWh | 36 mi |
| Los Vientos Windpower III | Rio Grande City, TX | 455.9 GWh | 26.4 mi |
| Los Vientos Windpower IV | Rio Grande City, TX | 441.8 GWh | 26.5 mi |
| Mars Solar | Bruni, TX | 20.5 GWh | 51.8 mi |
| Mesteno | Rio Grande City, TX | 611.5 GWh | 22.7 mi |
| Monte Cristo 1 | Monte Alto, TX | 419.0 GWh | 50.4 mi |
| Reloj del Sol Wind Farm | San Ygnacio, TX | 597.8 GWh | 30.7 mi |
| Rio Bravo Windpower, LLC | Roma, TX | 736.5 GWh | 3.6 mi |
| Sendero | Hebbronville, TX | 257.7 GWh | 34.4 mi |
| Starr Solar Ranch | Roma, TX | 283.8 GWh | 12.3 mi |
| WAL3320 | Palmhurst, TX | 291.0 MWh | 54.9 mi |
| Whitetail | Oilton, TX | 170.4 GWh | 54.7 mi |