Assembly Solar Project
N. Byron Road, Venice Township, MI 48449Plant Summary Information
Assembly Solar Project is ranked #15 out of 76 solar farms in Michigan in terms of total annual net electricity generation.
Assembly Solar Project generated 38.0 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Assembly Solar Project |
|---|---|
| Utility Name | Assembly Solar I, LLC |
| Location | Shiawassee County, MI |
| Initial Operation Date | December 2020 |
| Last Update | Jul 2026 |
| Annual Generation | 98.8 GWh |
| Annual Consumption | 383.5 k MMBtu |
| Ranked #3,554 out of 13,285 Power Plants Nationwide | |
| Ranked #955 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #89 out of 271 Michigan Power Plants | |
| Ranked #15 out of 76 Michigan Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Assembly Solar, LLC (2018 to 2018) Assembly Solar I, LLC (2019 to 2025) |
Map of Assembly Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Assembly Solar Project.
Monthly Net Generation for Assembly Solar Project
Monthly Plant Fuel Consumption for Assembly Solar Project
Assembly Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Assembly Solar Project (62422) |
| Plant Address | N. Byron Road, Venice Township, MI 48449 |
| Utility | Assembly Solar I, LLC (61949) |
| Latitude, Longitude | 43.02268, -83.94527 |
| Generation Dates on File | Dec 2020 to Jul 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 98.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Michigan Electric Transmission Company (56163) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator ASP01 Details Operating December 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 90 |
| DC Net Capacity | 72 MW |
| Crystalline Silicon | Yes |
| Other Materials | No |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Assembly Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #945 | Bullock Solar, LLC | Manson, NC | 100.4 GWh |
| #946 | Millington Solar Farm | Millington, TN | 100.3 GWh |
| #947 | Cassville Solar | Cassville, WI | 100.3 GWh |
| #948 | Albany Solar (WI) | Broadhead, WI | 100.3 GWh |
| #949 | Fish Creek Solar Park | Greenville, MI | 99.9 GWh |
| #950 | Mountain View Solar (FL) | Dade City, FL | 99.7 GWh |
| #951 | Citrus Ridge Solar | Bay Lake, FL | 99.2 GWh |
| #952 | Brantley Solar | Spring Hope, NC | 99.2 GWh |
| #953 | Blue Harvest Solar Park | Continental, OH | 99.1 GWh |
| #954 | Innovative Solar 54 | Kinston, NC | 98.8 GWh |
| #956 | Edwards Sanborn S1 | Mojave, CA | 96.8 GWh |
| #957 | Highest Power Solar, LLC | Louisburg, NC | 98.5 GWh |
| #958 | Luning Energy | Luning, NV | 97.8 GWh |
| #959 | Pleasant Creek Unit 1 | Palo, IA | 97.8 GWh |
| #960 | Sugar Solar, LLC | Yadkinville, NC | 97.8 GWh |
| #961 | Titan Solar | Deer Trail, CO | 97.8 GWh |
| #962 | Summit Farms Solar | Moyock, NC | 97.4 GWh |
| #963 | Gulf Coast Solar Center III | Bellview, FL | 97.3 GWh |
| #964 | Bird Dog Solar | Waynesboro, GA | 96.8 GWh |
| #965 | Marshall Solar Energy Project | Marshall, MN | 96.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Assembly Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Assembly Solar II LLC | Lennon, MI | 222.7 GWh | 1.6 mi |
| Assembly Solar III | Lennon, MI | 166.5 GWh | 0.1 mi |
| Bingham Solar, LLC | St. Johns, MI | 41.8 GWh | 29.4 mi |
| Blue Elk VII Solar, LLC | Flint, MI | 20.5 GWh | 19.6 mi |
| Brent Run Generating Station | Montrose, MI | 49.8 GWh | 11.7 mi |
| Captain Solar, LLC | Mt. Morris, MI | 3.9 GWh | 9.9 mi |
| Coldwater Solar, LLC | Flint, MI | 3.8 GWh | 9.8 mi |
| Colfax | Fowlerville, MI | 146.0 MWh | 26.3 mi |
| Geddes 2 Solar, LLC | Saginaw, MI | 3.7 GWh | 29.3 mi |
| Genesee Power Station LP | Flint, MI | 116.5 GWh | 14.6 mi |
| Genesee Solar Project | Flint, MI | 42.5 GWh | 14.8 mi |
| Grand Blanc Generating Station | Grand Blanc, MI | 50.2 GWh | 13.6 mi |
| Interchange Solar, LLC | Mt. Morris, MI | 3.5 GWh | 10.3 mi |
| Jack Francis Solar, LLC | Clio, MI | 3.9 GWh | 16 mi |
| Lennon Generating | Lennon, MI | 25.6 GWh | 3.3 mi |
| Lyons Road | Owosso, MI | 41.3 GWh | 10.7 mi |
| May Shannon Solar, LLC | Clio, MI | 4.1 GWh | 15.6 mi |
| Midcontinent Solar, LLC | Owosso, MI | 37.6 GWh | 11.3 mi |
| Peoples Generating Station | Ann Arbor, MI | 25.5 GWh | 18.2 mi |
| Venice Resources Gas Recovery | Lennon, MI | 12.7 GWh | 3 mi |