Amadeus Wind Farm
TBD, Rotan, TX 79546Plant Summary Information
Amadeus Wind Farm is ranked #69 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Amadeus Wind Farm generated 165.8 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Amadeus Wind Farm |
|---|---|
| Utility Name | Amadeus Wind LLC |
| Location | Fisher County, TX |
| Initial Operation Date | December 2020 |
| Last Update | Jun 2026 |
| Annual Generation | 694.5 GWh |
| Annual Consumption | 2.6 M MMBtu |
| Ranked #1,021 out of 13,094 Power Plants Nationwide | |
| Ranked #216 out of 1,369 Wind Power Plants Nationwide | |
| Ranked #188 out of 858 Texas Power Plants | |
| Ranked #69 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Amadeus Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Amadeus Wind Farm.
Monthly Net Generation for Amadeus Wind Farm
Monthly Plant Fuel Consumption for Amadeus Wind Farm
Amadeus Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Amadeus Wind Farm (62142) |
| Plant Address | TBD, Rotan, TX 79546 |
| Utility | Amadeus Wind LLC (61683) |
| Latitude, Longitude | 32.96736, -100.56428 |
| Generation Dates on File | Dec 2020 to Jun 2026 |
| Initial Operation Date | December 2020 |
| Annual Generation | 694.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator AM-TX Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 250 MW |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 96 |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 96 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 292 |
Amadeus Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #206 | Jayhawk Wind Energy Center | Hepler, KS | 704.9 GWh |
| #207 | Turtle Creek Wind Farm LLC | St. Ansgar, IA | 703.1 GWh |
| #208 | Waverly Wind Farm LLC | Waverly, KS | 701.2 GWh |
| #209 | Rattlesnake Den | Garden City, TX | 698.9 GWh |
| #210 | Coyote Wind LLC | Snyder, TX | 697.9 GWh |
| #211 | Grandview Wind Farm, LLC | Panhandle, TX | 696.8 GWh |
| #212 | Ida Grove II | Ida Grove, IA | 696.1 GWh |
| #213 | Broadview Energy JN, LLC | Texico, NM | 695.9 GWh |
| #214 | California Ridge Wind Energy LLC | Fithian, IL | 695.7 GWh |
| #215 | King Creek Wind Farm 2, LLC | Throckmorton, TX | 694.7 GWh |
| #217 | Osborn Wind Energy | Stewartsville, MO | 694.4 GWh |
| #218 | Kay Wind, LLC | Newkirk, OK | 690.6 GWh |
| #219 | Cimarron Bend III | Minneola, KS | 689.2 GWh |
| #220 | Salt Fork Wind Project, LLC | Clarendon, TX | 684.4 GWh |
| #221 | Appaloosa Run Wind | Rankin, TX | 683.8 GWh |
| #222 | Longhorn Wind | Silverton, TX | 683.8 GWh |
| #223 | East Fork Wind Project, LLC | Colby, KS | 683.3 GWh |
| #224 | Cedar Point Wind | Limon, CO | 679.8 GWh |
| #225 | Reading Wind Project | Reading, KS | 673.9 GWh |
| #226 | Peetz Table Wind Energy | Peetz, CO | 673.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Amadeus Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brazos Wind Farm | Fluvanna, TX | 655.2 GWh | 33.9 mi |
| Canyon Wind Project, LLC | Scurry, TX | 1.1 TWh | 34.7 mi |
| Coyote Wind LLC | Snyder, TX | 697.9 GWh | 19.3 mi |
| Dermott Wind | Snyder, TX | 889.7 GWh | 24.9 mi |
| EG178 Facility | Snyder, TX | 796.0 GWh | 27.3 mi |
| Fluvanna | Fluvanna, TX | 562.2 GWh | 33.7 mi |
| Gopher Creek Wind Farm | Fluvanna, TX | 622.6 GWh | 37.9 mi |
| Inadale Wind Farm LLC Hybrid | Roscoe, TX | 321.2 GWh | 32.5 mi |
| Loraine Windpark Project LLC | Loraine, TX | 307.8 GWh | 38.1 mi |
| Lumina II Solar Project | Snyder, TX | 693.8 GWh | 12 mi |
| Lumina Solar Project | Snyder, TX | 630.3 GWh | 24.7 mi |
| Mozart Wind Farm | Jayton, TX | 49.5 GWh | 2.3 mi |
| Post Wind Farm LP | Fluvanna, TX | 311.8 GWh | 38.1 mi |
| Pyron Wind Farm LLC Hybrid | Hermleigh, TX | 904.9 GWh | 26.9 mi |
| Roscoe Wind Farm LLC | Roscoe, TX | 334.3 GWh | 34.9 mi |
| Scurry County Wind II | Snyder, TX | 164.9 GWh | 21.8 mi |
| Scurry County Wind LP | Snyder, TX | 252.2 GWh | 30.3 mi |
| Texas Solar Nova 1 | Spur, TX | 709.9 GWh | 34.4 mi |
| Texas Solar Nova 2 | Spur, TX | 565.7 GWh | 34.3 mi |
| WAL1272 | Snyder, TX | 257.0 MWh | 28 mi |