Weaver Wind
485 Bull Hill Rd, Township 16, ME 4634Plant Summary Information
Weaver Wind is ranked #14 out of 211 power plants in Maine in terms of total annual net electricity generation.
Weaver Wind generated 33.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Weaver Wind |
|---|---|
| Utility Name | Weaver Wind, LLC (Longroad) |
| Location | Hancock County, ME |
| Initial Operation Date | December 2020 |
| Last Update | Sep 2025 |
| Annual Generation | 227.2 GWh |
| Annual Consumption | 809.1 k MMBtu |
| Ranked #2,314 out of 12,539 Power Plants Nationwide | |
| Ranked #702 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #14 out of 211 Maine Power Plants | |
| Ranked #4 out of 22 Maine Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Longroad Energy Services LLC (2019 to 2022) Weaver Wind, LLC (Longroad) (2023 to 2024) |
Map of Weaver Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Weaver Wind.
Monthly Net Generation for Weaver Wind
Weaver Wind Details
| Summary Information | |
|---|---|
| Plant Name | Weaver Wind (63132) |
| Plant Address | 485 Bull Hill Rd, Township 16, ME 4634 |
| Utility | Weaver Wind, LLC (Longroad) (65906) |
| Latitude, Longitude | 44.72252, -68.16361 |
| Generation Dates on File | Dec 2020 to Sep 2025 |
| Initial Operation Date | December 2020 |
| Annual Generation | 227.2 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | NPCC |
| Balancing Authority | ISO New England Inc. (ISNE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Emera Maine (1179) ME |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator WEAVR Details Operating December 2020
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 72.6 MW |
| Summer Capacity | 72.6 MW |
| Winter Capacity | 72.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 22 |
| Turbine Details | |
| Number Of Turbines | 22 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V126-3.3 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 384 |
Weaver Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #692 | Point Wind | Tehachapi, CA | 234.2 GWh |
| #693 | Los Vientos V Wind Power | Rio Grande City, TX | 233.6 GWh |
| #694 | High Winds LLC | Birds Landing, CA | 233.3 GWh |
| #695 | Pinyon Pine II | Mojave, CA | 233.1 GWh |
| #696 | Twin Buttes Wind Project | Lamar, CO | 233.0 GWh |
| #697 | Stony Creek Wind Farm NY | Strykersville, NY | 232.9 GWh |
| #698 | North Allegheny Windpower Project | Lilly, PA | 232.7 GWh |
| #699 | Strauss Wind Farm | Lompoc, CA | 230.0 GWh |
| #700 | Jericho Rise Wind Farm LLC | Chateaugay, NY | 228.8 GWh |
| #701 | Gratiot County Wind LLC | Breckenridge, MI | 228.4 GWh |
| #703 | Wessington Springs | Wessington Springs, SD | 226.6 GWh |
| #704 | Gratiot Wind Park | Breckenridge, MI | 225.4 GWh |
| #705 | Bison 3 Wind Energy Center | New Salem, ND | 223.3 GWh |
| #706 | Vasco Winds | Livermore, CA | 223.0 GWh |
| #707 | Goat Wind LP | Sterling City, TX | 222.5 GWh |
| #708 | Alta Wind VIII | Mojave, CA | 222.0 GWh |
| #709 | Coachella Hills Wind | Palm Springs, CA | 221.7 GWh |
| #710 | Pebble Springs Wind LLC | Wasco, OR | 219.0 GWh |
| #711 | Bison 2 Wind Energy Center | New Salem, ND | 218.7 GWh |
| #712 | Wethersfield | Gainsville, NY | 218.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Weaver Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| BD Solar Ellsworth LLC | Augusta, ME | 5.6 GWh | 16.8 mi |
| BD Solar Hancock LLC | Augusta, ME | 7.5 GWh | 16 mi |
| Brewer (CSG) | Brewer, ME | 1.9 GWh | 27.5 mi |
| BRNG Nicolin (CSG) | Ellsworth, ME | 205.0 MWh | 18.4 mi |
| Bull Hill Wind Project | Eastbrook, ME | 74.0 GWh | 3.9 mi |
| Downeast Wind | Columbia, ME | 144.8 GWh | 12.3 mi |
| Eastern Maine Medical Center | Bangor, ME | 31.1 GWh | 29.4 mi |
| Ellsworth Hydro Station | Ellsworth, ME | 21.9 GWh | 18 mi |
| Hancock Wind Plant | T22 MD, ME | 121.2 GWh | 2.8 mi |
| Maine Independence Station | Veazie, ME | 2.5 TWh | 27.7 mi |
| Mariaville Road Elsworth Solar, LLC | Ellsworth, ME | 2.5 GWh | 17 mi |
| Milford Hydro Station | Milford, ME | 37.2 GWh | 28 mi |
| Orono B | Orono, ME | 21.3 GWh | 27 mi |
| Orono Hydro Station | Orono, ME | 5.8 GWh | 26.9 mi |
| Passadumkeag Windpark LLC | Greenbush, ME | 140.2 GWh | 24.1 mi |
| Pisgah Mountain Wind | Clifton, ME | 25.3 GWh | 18.1 mi |
| Silver Maple | Clifton, ME | 58.7 GWh | 18 mi |
| Stillwater B | Old Town, ME | 10.5 GWh | 28.7 mi |
| Stillwater Hydro Station | Stillwater, ME | 7.0 GWh | 28.6 mi |
| Wymans Deblois | Deblois, ME | 244.0 MWh | 9.8 mi |