Directory of Power Plants in the United States
Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
---|---|---|---|---|---|---|---|
SoCore Clovis 1 | SoCore Clovis 1 LLC | Clovis, NM | Southwest Power Pool (SWPP) | 4.3 GWh | Mar 2021 | Dec 2024 | Solar |
Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.5 GWh | Mar 2018 | Dec 2024 | Solar |
Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 826.0 MWh | Mar 2018 | Dec 2024 | Solar |
Cloverdale Solar I | Altus Power America Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 2.2 GWh | May 2014 | Dec 2024 | Solar |
ASTI | Perpetual Energy Systems | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2024 | Solar |
Cloverdale Solar Center | Adapture Renewables, Inc. | Cloverdale, CA | California Independent System Operator (CISO) | 2.1 GWh | Apr 2019 | Dec 2024 | Solar |
Piney Creek Solar | Dominion Energy Inc. | Clover, VA | PJM Interconnection, LLC (PJM) | 123.2 GWh | Jul 2023 | May 2025 | Solar |
Foxhound | Foxhound Solar, LLC | Clover, VA | PJM Interconnection, LLC (PJM) | 151.6 GWh | Mar 2024 | May 2025 | Solar |
Clover | Virginia Electric & Power Co | Clover, VA | PJM Interconnection, LLC (PJM) | 988.9 GWh | Sep 1995 | May 2025 | Bituminous Coal : 99.7% |
Knife Falls | ALLETE, Inc. | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 9.8 GWh | Dec 1921 | Dec 2024 | Water |
Sappi Cloquet Mill | Sappi Cloquet LLC | Cloquet, MN | Midcontinent Independent System Operator, Inc. (MISO) | 449.1 GWh | Dec 1928 | May 2025 | Black Liquor : 65.4% Wood/Wood Waste Solids : 17.4% Natural Gas : 12.8% Water : 3.7% |
Jack Francis Solar, LLC | Jack Francis Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 3.9 GWh | Nov 2020 | Dec 2024 | Solar |
May Shannon Solar, LLC | May Shannon Solar, LLC | Clio, MI | Midcontinent Independent System Operator, Inc. (MISO) | 4.1 GWh | Nov 2020 | Dec 2024 | Solar |
Gaucho Solar | Vesper Energy Development LLC | Clinton, PA | PJM Interconnection, LLC (PJM) | 16.2 GWh | May 2023 | Dec 2023 | Solar |
Overhill Solar | Strata Manager, LLC | Clinton, NC | Duke Energy Carolinas (DUK) | 10.9 GWh | Feb 2022 | Dec 2024 | Solar |
Starr | Strata Manager, LLC | Clinton, NC | Duke Energy Progress West (CPLW) | 10.8 GWh | Feb 2019 | Dec 2024 | Solar |
Innovative Solar 64 | Cypress Creek Renewables | Clinton, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Dec 2015 | Dec 2024 | Solar |
McGrigor Farm Solar | Carolina Solar Energy LLC | Clinton, NC | Duke Energy Progress East (CPLE) | 9.9 GWh | Sep 2019 | Dec 2024 | Solar |
Clipperton Holdings LLC | Dominion Renewable Energy | Clinton, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Oct 2017 | Dec 2024 | Solar |
Cosgrove Intake and Power Station | Massachusetts Water Res Auth | Clinton, MA | ISO New England (ISNE) | 738.0 MWh | Dec 1968 | Dec 2024 | Water |
Kirby Road Solar, LLC | Nautilus Solar Solutions | Clinton, MD | PJM Interconnection, LLC (PJM) | 2.5 GWh | May 2021 | Dec 2024 | Solar |
Archer Daniels Midland Clinton | Archer Daniels Midland Co | Clinton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 791.9 GWh | Jan 2009 | May 2025 | Subbituminous Coal : 90.6% Other Biomass Solids : 8.7% Bituminous Coal : 0.7% |
Clinton Power Station | Constellation Nuclear | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 9.5 TWh | Oct 1987 | May 2025 | Nuclear |
Clinton LFGTE | Wabash Valley Power Assn, Inc | Clinton, IL | Midcontinent Independent System Operator, Inc. (MISO) | 14.7 GWh | Jan 2006 | May 2025 | Landfill Gas |
Alta Farms II Wind Project, LLC | Alta Farms II Wind Project, LLC | Clinton, IL | PJM Interconnection, LLC (PJM) | 576.2 GWh | Apr 2023 | May 2025 | Wind |
Petit Jean | Today's Power, Inc. | Clinton, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Nov 2023 | Dec 2024 | Solar |
Pivot Energy Minnesota Solar 1 | Pivot Energy | Clinton Falls, MN | Midcontinent Independent System Operator, Inc. (MISO) | 919.0 MWh | May 2023 | Dec 2023 | Solar |
Maplewood Solar | Dominion Renewable Energy | Climax, VA | PJM Interconnection, LLC (PJM) | 195.7 GWh | Nov 2022 | May 2025 | Solar |
Decatur Solar | Washington County Solar, LLC | Climax, GA | Southern Company Services, Inc. - Trans (SOCO) | 263.1 GWh | Oct 2024 | May 2025 | Solar |
Dileo Solar | Elawan Dileo Solar, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 157.8 GWh | Nov 2023 | May 2025 | Solar |
Whitney | USACE-Fort Worth District | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 69.4 GWh | May 1953 | Dec 2024 | Water |
Thad Hill Energy Center | Thad Hill Energy Center, LLC | Clifton, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 4.3 TWh | Jun 2000 | May 2025 | Natural Gas |
Silver Maple | WEB Silver Maple Wind LLC | Clifton, ME | ISO New England (ISNE) | 58.7 GWh | Sep 2022 | Dec 2024 | Wind |
Pisgah Mountain Wind | Pisgah Mountain, LLC | Clifton, ME | ISO New England (ISNE) | 25.3 GWh | Nov 2016 | Dec 2024 | Wind |
Clifton | Sunflower Electric Power Corp | Clifton, KS | Southwest Power Pool (SWPP) | 6.3 GWh | Jul 1974 | Dec 2024 | Natural Gas |
Sugar Hill Solar 1 | Sugar Hill Solar 1, LLC | Clifton Park, NY | ISO New England (ISNE) | 8.4 GWh | Nov 2020 | Dec 2024 | Solar |
25 Ashdown Road Solar, LLC | AES Distributed Energy | Clifton Park, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Nov 2024 | Solar |
Thomas Hill | Associated Electric Coop, Inc | Clifton Hill, MO | Associated Electric Cooperative, Inc. (AECI) | 5.9 TWh | Nov 1966 | May 2025 | Refined Coal : 71.6% Subbituminous Coal : 28.2% |
James E. Rogers Energy Complex | Duke Energy Carolinas, LLC | Cliffside, NC | Duke Energy Carolinas (DUK) | 4.2 TWh | May 1972 | May 2025 | Natural Gas : 50.6% Bituminous Coal : 49.2% |
Clewiston Sugar House | United States Sugar Corp | Clewiston, FL | Duke Energy Florida, Inc. (FPC) | 263.7 GWh | Oct 1997 | May 2025 | Agricultural By-Products : 99.8% |
Blue Heron Solar | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 149.0 GWh | Dec 2019 | May 2025 | Solar |
Caloosahatchee | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 152.2 GWh | Dec 2023 | May 2025 | Solar |
Woodyard | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 175.5 GWh | Feb 2024 | May 2025 | Solar |
Beautyberry | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 178.9 GWh | Dec 2023 | May 2025 | Solar |
Sawgrass Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 146.7 GWh | Dec 2021 | May 2025 | Solar |
Ghost Orchid Solar Energy Center | Florida Power & Light Co | Clewiston, FL | Florida Power & Light Co. (FPL) | 147.6 GWh | Dec 2021 | May 2025 | Solar |
Clinch River | Appalachian Power Co | Cleveland, VA | PJM Interconnection, LLC (PJM) | 224.6 GWh | Aug 1958 | May 2025 | Natural Gas |
Security | TX LFG Energy, LP | Cleveland, TX | Midcontinent Independent System Operator, Inc. (MISO) | 6.2 GWh | Feb 2003 | Dec 2024 | Landfill Gas |
Cleveland Works | Cleveland Cliffs | Cleveland, OH | PJM Interconnection, LLC (PJM) | 338.9 GWh | Dec 1949 | May 2025 | Blast Furnace Gas : 58.7% Natural Gas : 41.3% |
Cleveland Peaking | American Mun Power-Ohio, Inc | Cleveland, OH | PJM Interconnection, LLC (PJM) | 472.0 MWh | Jun 2000 | Dec 2024 | Distillate Fuel Oil |
Collinwood BioEnergy Facility | Collinwood BioEnergy | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Apr 2011 | Dec 2023 | Other Biomass Gas |
Cleveland Thermal | Corix Cleveland Thermal Generating LP | Cleveland, OH | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jan 2017 | Dec 2024 | Natural Gas |
MCCo Solar Generating Facility | The Medical Center Company | Cleveland, OH | PJM Interconnection, LLC (PJM) | 1.1 GWh | Oct 2014 | Dec 2024 | Solar |
Redmon Solar Farm LLC | Strata Manager, LLC | Cleveland, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Feb 2015 | Dec 2024 | Solar |
Statesville Solar | Cypress Creek Renewables | Cleveland, NC | Duke Energy Carolinas (DUK) | 9.1 GWh | Nov 2017 | Dec 2024 | Solar |
Red Maple Solar | Terraform Arcadia | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.1 GWh | May 2018 | Dec 2024 | Solar |
MN CSG 2019-38 DE LLC | MN CSG 2019-38 DE LLC | Cleveland, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.4 GWh | Oct 2022 | Dec 2024 | Solar |
Duke Energy CHP at Clemson University | Duke Energy Carolinas, LLC | Clemson, SC | Duke Energy Carolinas (DUK) | 95.0 GWh | Nov 2019 | Dec 2024 | Natural Gas |
Central Energy Facility | Clemson University - Main Campus | Clemson, SC | Duke Energy Carolinas (DUK) | 2.0 MWh | Apr 2000 | Sep 2024 | Natural Gas |
Camanche | East Bay Municipal Util Dist | Clements & Wallace, CA | California Independent System Operator (CISO) | 31.7 GWh | Jun 1983 | Dec 2024 | Water |
Glaciers Edge Wind Project | EDF Renewable Asset Holdings, Inc. | Cleghorn, IA | Midcontinent Independent System Operator, Inc. (MISO) | 857.7 GWh | Nov 2019 | May 2025 | Wind |
Johnson County | Johnson County Power LLC | Cleburne, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.1 TWh | Aug 1996 | Dec 2023 | Natural Gas |
Hinterland CSG, LLC | Madison Energy Holdings LLC | Clearlake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Oct 2020 | Dec 2024 | Solar |
Indian Valley Dam Hydro Project | Yolo County Flood Control WCD | Clearlake Oaks, CA | California Independent System Operator (CISO) | 6.0 GWh | Sep 1983 | Aug 2024 | Water |
Birch | Birch Power LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.9 GWh | Jan 2017 | Dec 2024 | Wind |
August Wind Farm | August Wind Energy, LLC | Clearfield, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.5 GWh | Jan 2017 | Dec 2024 | Wind |
Big Spring Solar (CSG) | AES Clean Energy | Clear Spring, MD | PJM Interconnection, LLC (PJM) | 264.0 MWh | Oct 2024 | Dec 2024 | Solar |
Deuel Harvest Wind Energy LLC | Southern Power Co | Clear Lake, SD | Midcontinent Independent System Operator, Inc. (MISO) | 1.1 TWh | Jan 2021 | May 2025 | Wind |
E. Goenner Project CSG | E. Goenner Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.4 GWh | Nov 2019 | Dec 2024 | Solar |
Prawer Project CSG | Prawer Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Dec 2019 | Dec 2024 | Solar |
Gohman Community Solar (CSG) | Gohman Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.6 GWh | Jan 2020 | Dec 2024 | Solar |
USS Golly Gee Solar LLC | United States Solar Corporation | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Jun 2023 | Dec 2024 | Solar |
Sobania Community Solar LLC | Madison Energy Holdings LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.0 GWh | Aug 2020 | Dec 2024 | Solar |
Hammer Community (CSG) | Hammer Community Solar LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 GWh | Jul 2020 | Dec 2024 | Solar |
Sherco Solar I | Northern States Power Co - Minnesota | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 192.9 GWh | Sep 2024 | May 2025 | Solar |
SolarClub 15 LLC | Nautilus Solar Solutions | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 2.1 GWh | Nov 2020 | Dec 2024 | Solar |
Sherburne Community Solar | AEP Onsite Partners, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.8 GWh | Feb 2018 | Apr 2025 | Solar |
Hammer CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 GWh | Nov 2018 | Dec 2024 | Solar |
Tiller CSG | DG Minnesota CSG, LLC | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 7.7 GWh | Nov 2018 | Dec 2024 | Solar |
CF Novel Solar CSG Gardens Seven, LLC | Cypress Creek Renewables | Clear Lake, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.9 GWh | Nov 2017 | Dec 2024 | Solar |
Emery Station | Interstate Power and Light Co | Clear Lake, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.3 TWh | Apr 2004 | May 2025 | Natural Gas |
Wildhorse Mountain Wind Facility | Southern Power Co | Clayton, OK | Southwest Power Pool (SWPP) | 389.9 GWh | Nov 2019 | May 2025 | Wind |
Murdock Solar | Cypress Creek Renewables | Clayton, NC | Duke Energy Progress East (CPLE) | 6.2 GWh | Dec 2015 | Dec 2024 | Solar |
Powatan Road Solar | Red Toad Powatan Phase 2 LLC | Clayton, NC | Duke Energy Progress East (CPLE) | 3.4 GWh | Nov 2020 | Dec 2024 | Solar |
315 Vinson Road | Red Toad 315 Vinson Road, LLC | Clayton, NC | Duke Energy Progress East (CPLE) | 3.8 GWh | Nov 2020 | Dec 2024 | Solar |
Red Toad 1425 A Powatan Road, LLC | SRE Utility Solar 1, LLC | Clayton, NC | Duke Energy Carolinas (DUK) | 4.0 GWh | Nov 2015 | Dec 2024 | Solar |
NYS Rte 12 Community Solar | OYA NYS Rte 12 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 6.8 GWh | Nov 2019 | Dec 2024 | Solar |
Great Lakes Seaway Community Solar | OYA Great Lakes Seaway LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.9 GWh | Nov 2019 | Dec 2024 | Solar |
Blanchard Road 2 Community Solar | OYA Blanchard Road 2 LLC | Clayton, NY | New York Independent System Operator (NYIS) | 8.3 GWh | Nov 2019 | Dec 2024 | Solar |
Blanchard Road 1 Community Solar | OYA Blanchard Road LLC | Clayton, NY | New York Independent System Operator (NYIS) | 7.1 GWh | Nov 2019 | Dec 2024 | Solar |
ASA Clayton NY Solar I LLC | ASA Clayton NY Solar I LLC | Clayton, NY | New York Independent System Operator (NYIS) | 738.0 MWh | Jun 2024 | Dec 2024 | Solar |
Burton Dam | Georgia Power Co | Clayton, GA | Southern Company Services, Inc. - Trans (SOCO) | 19.6 GWh | Aug 1927 | Dec 2024 | Water |
Clay Solar CSG | DG New York CS, LLC | Clay, NY | New York Independent System Operator (NYIS) | 8.4 GWh | May 2021 | Dec 2024 | Solar |
Onondaga County - Oak Orchard WWTP | Tesla Inc. | Clay, NY | New York Independent System Operator (NYIS) | 2.5 GWh | Oct 2017 | Dec 2024 | Solar |
Onondaga County - Metro Water Board | Tesla Inc. | Clay, NY | New York Independent System Operator (NYIS) | 1.1 GWh | Jan 2016 | Dec 2024 | Solar |
Hunter Solar LLC (UT) | Hunter Solar LLC | Clawson, UT | PacifiCorp East (PACE) | 271.4 GWh | Feb 2021 | May 2025 | Solar |
ELP Claverack Solar | ELP Claverack Solar, LLC | Claverack, NY | New York Independent System Operator (NYIS) | 8.0 GWh | Dec 2022 | Dec 2024 | Solar |
Goodnight | FGE Goodnight I, LLC | Claude, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 795.7 GWh | Mar 2024 | May 2025 | Wind |
Port Westward Unit 2 | Portland General Electric Co | Clatskanie, OR | Portland General Electric Company (PGE) | 1.1 TWh | Nov 2014 | Dec 2024 | Natural Gas |
Port Westward | Portland General Electric Co | Clatskanie, OR | Portland General Electric Company (PGE) | 3.2 TWh | May 2007 | May 2025 | Natural Gas |
Summary of Power Plants By State
Figures are based on May 2025 generation numbers.State | Rank | Active Plants | May 2025 Generation |
---|---|---|---|
Alabama | # 7 | 75 | 11,300.49 GWh |
Alaska | # 48 | 142 | 475.90 GWh |
Arizona | # 11 | 176 | 9,204.37 GWh |
Arkansas | # 25 | 99 | 5,005.01 GWh |
California | # 4 | 1,667 | 17,300.59 GWh |
Colorado | # 28 | 290 | 4,508.30 GWh |
Connecticut | # 38 | 162 | 2,580.83 GWh |
Delaware | # 50 | 32 | 189.30 GWh |
District of Columbia | # 51 | 16 | 14.93 GWh |
Florida | # 2 | 317 | 24,888.07 GWh |
Georgia | # 6 | 248 | 11,990.59 GWh |
Hawaii | # 47 | 68 | 737.15 GWh |
Idaho | # 42 | 145 | 1,633.17 GWh |
Illinois | # 5 | 358 | 14,860.85 GWh |
Indiana | # 17 | 210 | 7,386.37 GWh |
Iowa | # 22 | 294 | 5,142.65 GWh |
Kansas | # 24 | 181 | 5,016.68 GWh |
Kentucky | # 21 | 58 | 5,314.31 GWh |
Louisiana | # 14 | 83 | 8,104.32 GWh |
Maine | # 45 | 208 | 1,219.14 GWh |
Maryland | # 33 | 198 | 3,211.24 GWh |
Massachusetts | # 43 | 624 | 1,590.93 GWh |
Michigan | # 12 | 269 | 9,081.28 GWh |
Minnesota | # 29 | 765 | 4,142.68 GWh |
Mississippi | # 20 | 56 | 5,397.23 GWh |
Missouri | # 23 | 121 | 5,122.89 GWh |
State | Rank | Active Plants | May 2025 Generation |
---|---|---|---|
Montana | # 40 | 70 | 1,958.99 GWh |
Nebraska | # 37 | 127 | 2,880.69 GWh |
Nevada | # 30 | 110 | 4,010.09 GWh |
New Hampshire | # 44 | 56 | 1,548.73 GWh |
New Jersey | # 31 | 385 | 3,877.07 GWh |
New Mexico | # 32 | 139 | 3,225.41 GWh |
New York | # 10 | 929 | 10,057.90 GWh |
North Carolina | # 9 | 909 | 10,631.50 GWh |
North Dakota | # 35 | 57 | 3,062.36 GWh |
Ohio | # 8 | 197 | 11,259.64 GWh |
Oklahoma | # 18 | 139 | 6,659.06 GWh |
Oregon | # 27 | 272 | 4,712.75 GWh |
Pennsylvania | # 3 | 255 | 19,165.18 GWh |
Rhode Island | # 46 | 97 | 795.05 GWh |
South Carolina | # 13 | 200 | 8,379.29 GWh |
South Dakota | # 41 | 52 | 1,667.11 GWh |
Tennessee | # 19 | 86 | 5,858.87 GWh |
Texas | # 1 | 890 | 49,337.47 GWh |
Utah | # 39 | 122 | 2,500.89 GWh |
Vermont | # 49 | 117 | 233.21 GWh |
Virginia | # 16 | 233 | 7,447.37 GWh |
Washington | # 15 | 134 | 7,969.22 GWh |
West Virginia | # 34 | 39 | 3,129.59 GWh |
Wisconsin | # 26 | 244 | 4,882.66 GWh |
Wyoming | # 36 | 73 | 3,035.08 GWh |