Barton Chapel Wind Farm
6868 Rock Creek Rd, Jacksboro, TX 76458Plant Summary Information
Barton Chapel Wind Farm is ranked #187 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Barton Chapel Wind Farm generated 57.7 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Barton Chapel Wind Farm |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Jack County, TX |
| Initial Operation Date | January 2009 |
| Last Update | Dec 2024 |
| Annual Generation | 210.9 GWh |
| Annual Consumption | 808.1 k MMBtu |
| Ranked #2,438 out of 12,332 Power Plants Nationwide | |
| Ranked #731 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #441 out of 814 Texas Power Plants | |
| Ranked #187 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Barton Chapel Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Barton Chapel Wind Farm.
Monthly Net Generation for Barton Chapel Wind Farm
Monthly Plant Fuel Consumption for Barton Chapel Wind Farm
Barton Chapel Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Barton Chapel Wind Farm (57156) |
| Plant Address | 6868 Rock Creek Rd, Jacksboro, TX 76458 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 33.05223, -98.32842 |
| Generation Dates on File | Jan 2009 to Dec 2024 |
| Initial Operation Date | January 2009 |
| Annual Generation | 210.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator BC Details Operating January 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 120 MW |
| Summer Capacity | 120 MW |
| Winter Capacity | 120 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2009 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 60 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 60 |
|---|---|
| Predominant Turbine Manufacturer | Gamesa |
| Predominant Turbine Model Number | G87-2.0 |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 256 |
Barton Chapel Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #721 | Weaver Wind | Township 16, ME | 220.7 GWh |
| #722 | Point Wind | Tehachapi, CA | 219.1 GWh |
| #723 | Pebble Springs Wind LLC | Wasco, OR | 219.0 GWh |
| #724 | Bison 2 Wind Energy Center | New Salem, ND | 218.7 GWh |
| #725 | Wethersfield | Gainsville, NY | 218.5 GWh |
| #726 | Star Point Wind Project LLC | Wasco, OR | 217.8 GWh |
| #727 | Crescent Ridge | Tiskilwa, IL | 216.5 GWh |
| #728 | Flat Water Wind Farm LLC | Du Bois, NE | 215.6 GWh |
| #729 | Top Hat Wind | IL | 215.5 GWh |
| #730 | Gratiot Wind Park | Breckenridge, MI | 211.2 GWh |
| #732 | North Allegheny Windpower Project | Lilly, PA | 210.0 GWh |
| #733 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 210.0 GWh |
| #734 | Nine Canyon | Kennewick, WA | 209.3 GWh |
| #735 | Windthorst-2 | Archer, TX | 206.4 GWh |
| #736 | Broken Bow Wind LLC | Broken Bow, NE | 205.7 GWh |
| #737 | NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh |
| #738 | Strauss Wind Farm | Lompoc, CA | 205.5 GWh |
| #739 | Scurry County Wind LP | Snyder, TX | 205.4 GWh |
| #740 | Elm Creek Wind II LLC | Trimont, MN | 205.4 GWh |
| #741 | La Casa Wind | Ranger, TX | 204.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Barton Chapel Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 54.9 mi |
| Bobcat Bluff Wind Project LLC | Archer, TX | 462.3 GWh | 33.8 mi |
| Bridgeport Gas Processing Plant | Bridgeport, TX | 47.9 GWh | 32 mi |
| Buckthorn Wind | Mingus, TX | 364.8 GWh | 47.1 mi |
| Graham | Graham, TX | 1.0 TWh | 17.4 mi |
| Jack County | Bridgeport, TX | 5.2 TWh | 21.7 mi |
| Keechi Wind | Jacksboro, TX | 394.9 GWh | 11.5 mi |
| La Casa Wind | Ranger, TX | 204.0 GWh | 35.2 mi |
| R W Miller | Palo Pinto, TX | 779.6 GWh | 27.3 mi |
| Senate Wind LLC | Bryson, TX | 413.7 GWh | 10.8 mi |
| Shannon Wind | Windhorst, TX | 444.2 GWh | 31.7 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 50 mi |
| Trinity Hills | Olney, TX | 788.0 GWh | 31.9 mi |
| WAL3773 | Fort Worth, TX | 227.0 MWh | 52.9 mi |
| WAL5764 | Fort Worth, TX | 235.0 MWh | 53.4 mi |
| WAL972 | Fort Worth, TX | 209.0 MWh | 55 mi |
| Westside Landfill Gas Recovery | Aledo, TX | 15.7 GWh | 51.2 mi |
| Windthorst-2 | Archer, TX | 206.4 GWh | 32.2 mi |
| Wise County Power LLC | Poolville, TX | 3.2 TWh | 24.2 mi |
| Young Wind | Graham, TX | 1.6 TWh | 30.7 mi |