Sky River Wind Energy Center
13000 Jameson Road, Tehachapi, CA 93561Plant Summary Information
Sky River Wind Energy Center is ranked #29 out of 110 wind farms in California in terms of total annual net electricity generation.
Sky River Wind Energy Center generated 50.6 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sky River Wind Energy Center |
---|---|
Utility Name | Sky River Wind LLC |
Location | Kern County, CA |
Initial Operation Date | February 1991 |
Last Update | Dec 2024 |
Annual Generation | 245.0 GWh |
Annual Consumption | 893.0 k MMBtu |
Ranked #2,149 out of 12,288 Power Plants Nationwide | |
Ranked #668 out of 1,353 Wind Power Plants Nationwide | |
Ranked #225 out of 1,564 California Power Plants | |
Ranked #29 out of 110 California Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Sky River LLC (2013 to 2019) Sky River Wind LLC (2020 to 2024) |
Map of Sky River Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sky River Wind Energy Center.
Monthly Net Generation for Sky River Wind Energy Center
Sky River Wind Energy Center Details
Summary Information | |
---|---|
Plant Name | Sky River Wind Energy Center (50536) |
Plant Address | 13000 Jameson Road, Tehachapi, CA 93561 |
Utility | Sky River Wind LLC (64156) |
Latitude, Longitude | 35.2608, -118.2469 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | February 1991 |
Annual Generation | 245.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 91-59-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator SRW1 Details Operating September 2021
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 60.2 MW |
Summer Capacity | 60.2 MW |
Winter Capacity | 60.2 MW |
Minimum Load | 5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 21 |
Turbine Details | |
Number Of Turbines | 21 |
---|---|
Predominant Turbine Manufacturer | Siemens Gamesa |
Predominant Turbine Model Number | SG 2.9-129 |
Design Wind Speed | 23 MPH |
Wind Quality Class | 1 - High Wind |
Turbine Hub Height Feet | 300 |
Sky River Wind Energy Center Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Sky River LLC | 700 Universe Blvd., Juno Beach, FL 33408 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#658 | Rockland Wind Farm | American Falls, ID | 250.6 GWh |
#659 | Blackstone Wind Farm LLC | Ransom, IL | 250.1 GWh |
#660 | Los Vientos Wind 1B | Sebastian, TX | 249.4 GWh |
#661 | Arkwright Summit Wind Farm LLC | Fredonia, NY | 249.2 GWh |
#662 | Rising Tree Wind Farm | Mojave, CA | 249.0 GWh |
#663 | Oliver Wind IV | Hannover, ND | 248.3 GWh |
#664 | Golden Hills Wind | Livermore, CA | 247.4 GWh |
#665 | Coram Energy LLC (4.5MW) | Tehachapi, CA | 246.4 GWh |
#666 | Farmers City Wind LLC | Tarkio, MO | 246.4 GWh |
#667 | Klondike Windpower II | Wasco, OR | 245.8 GWh |
#669 | Rolling Hills | Glenrock, WY | 244.8 GWh |
#670 | Sandy Ridge Wind 2, LLC | Tyrone, PA | 243.9 GWh |
#671 | Lake Benton I | Lake Benton, MN | 243.8 GWh |
#672 | Lost Lakes Wind Farm LLC | Lake Park, IA | 243.7 GWh |
#673 | Los Vientos V Wind Power | Rio Grande City, TX | 242.8 GWh |
#674 | NaturEner Glacier Wind Energy 1 | Ethridge, MT | 240.8 GWh |
#675 | Beech Ridge Energy LLC | Rupert, WV | 240.6 GWh |
#676 | Wessington Springs | Wessington Springs, SD | 239.2 GWh |
#677 | Oasis Wind | Mojave, CA | 238.4 GWh |
#678 | Meadow Lake Wind Farm II LLC | Lafayette, IN | 237.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sky River Wind Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
85 A | Tehachapi, CA | 71.2 GWh | 12.2 mi |
85 B | Tehachapi, CA | 97.6 GWh | 12 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 96.1 GWh | 12 mi |
Cameron Ridge LLC | Mojave, CA | 144.0 GWh | 13.4 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 131.0 GWh | 13.1 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 131.2 GWh | 13.1 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 116.1 GWh | 12.4 mi |
North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 6.9 mi |
Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 3.6 mi |
Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 4.1 mi |
RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 10.8 mi |
Ridgetop | Mojave, CA | 145.9 GWh | 13.5 mi |
Ridgetop Energy LLC | Mojave, CA | 27.0 GWh | 13.8 mi |
Rising Tree Wind Farm | Mojave, CA | 249.0 GWh | 12.8 mi |
Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 12.1 mi |
Rising Tree Wind Farm III | Mojave, CA | 261.4 GWh | 13.8 mi |
Tehachapi Wind Resource II | Tehachapi, CA | 46.1 GWh | 11.3 mi |
Terra-Gen VG Wind LLC | Tehachapi, CA | 7.6 GWh | 12.5 mi |
Voyager Wind II | Mojave, CA | 494.0 GWh | 13 mi |
Voyager Wind IV | Mojave, CA | 80.9 GWh | 12.6 mi |