North Allegheny Windpower Project
St. Hwy 53 & US Hwy 22, Lilly, PA 15938Plant Summary Information
North Allegheny Windpower Project is ranked #11 out of 27 wind farms in Pennsylvania in terms of total annual net electricity generation.
North Allegheny Windpower Project generated 16.0 GWh during the 3-month period between May 2023 to August 2023.
Plant Name | North Allegheny Windpower Project |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Blair County, PA |
Initial Operation Date | September 2009 |
Last Update | Aug 2023 |
Annual Generation | 124.6 GWh |
Annual Consumption | 425.2 k MMBtu |
Ranked #2,907 out of 11,455 Power Plants Nationwide | |
Ranked #835 out of 1,337 Wind Power Plants Nationwide | |
Ranked #76 out of 236 Pennsylvania Power Plants | |
Ranked #11 out of 27 Pennsylvania Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Duke Energy DEGS North Allegheny (2013 to 2021) Duke Energy Renewables Services (2022 to 2022) |
Map of North Allegheny Windpower Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Allegheny Windpower Project.
Monthly Net Generation for North Allegheny Windpower Project
North Allegheny Windpower Project Details
Summary Information | |
---|---|
Plant Name | North Allegheny Windpower Project (56651) |
Plant Address | St. Hwy 53 & US Hwy 22 Lilly, PA 15938 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 40.4381, -78.5436 |
Generation Dates on File | Sep 2009 to Aug 2023 |
Initial Operation Date | September 2009 |
Annual Generation | 124.6 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pennsylvania Electric Co (14711) PA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 70 MW |
Summer Capacity | 70 MW |
Winter Capacity | 70 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2009 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 35 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 70 MW |
Planned Repower | December 2023 |
Other Planned Modifications | No |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 35 |
---|---|
Predominant Turbine Manufacturer | Gamesa |
Predominant Turbine Model Number | G87-2.0 |
Design Wind Speed | 14.9 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 272 |
North Allegheny Windpower Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Duke Energy DEGS North Allegheny | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#825 | Linden Wind Energy Project | Goldendale, WA | 130.9 GWh |
#826 | Kawailoa Wind | Haleiwa, HI | 130.2 GWh |
#827 | McFadden Ridge | Rock River, WY | 129.9 GWh |
#828 | Voyager Wind III | Mojave, CA | 128.3 GWh |
#829 | Chanarambie Power Partners, LLC | Lake Wilson, MN | 127.7 GWh |
#830 | Poseidon Wind, LLC | Herber, AZ | 127.0 GWh |
#831 | Rock River I LLC | Rock River, WY | 126.7 GWh |
#832 | Clinton | Churubusco, NY | 125.8 GWh |
#833 | Hancock Wind Plant | T22 MD, ME | 125.3 GWh |
#834 | Canyon Wind Project, LLC | Scurry, TX | 125.1 GWh |
#836 | Llano Estacado Wind Ranch | White Deer, TX | 124.0 GWh |
#837 | Big Turtle Wind Farm 2 | Harbor Beach, MI | 122.7 GWh |
#838 | Sandy Ridge Wind Farm | Tyrone, PA | 122.2 GWh |
#839 | North Bend Wind Project, LLC | SD | 122.2 GWh |
#840 | Oak Glen Wind Farm | Blooming Prairie, MN | 122.1 GWh |
#841 | Mojave 3/4/5 | Mojave, CA | 121.4 GWh |
#842 | Fourmile Ridge | Frostburg, MD | 121.0 GWh |
#843 | Pakini Nui Wind Farm | Naalehu, HI | 120.9 GWh |
#844 | Dry Lake Wind LLC | Heber, AZ | 120.0 GWh |
#845 | Storm Lake 1 | Alta, IA | 119.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding North Allegheny Windpower Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allegheny Ridge Wind Farm | Portage, PA | 189.4 GWh | 4.2 mi |
Cambria Wind LLC | Sidman, PA | 153.2 GWh | 12.1 mi |
Chestnut Flats Wind Farm | Altoona, PA | 105.0 GWh | 6.8 mi |
Colver Green Energy | Colver, PA | 752.0 GWh | 15.5 mi |
Conemaugh | New Florence, PA | 3.6 TWh | 27.5 mi |
CPV Fairview Energy Center | Johnstown, PA | 7.9 TWh | 16.5 mi |
CPV Maple Hill Solar | Portage, PA | 26.4 GWh | 8.1 mi |
Ebensburg Power | Ebensburg, PA | 373.6 GWh | 10.8 mi |
Forward Windpower LLC | Berlin, PA | 61.6 GWh | 29.6 mi |
Glades Pike Generation Plant | Somerset, PA | 10.7 GWh | 39.7 mi |
Highland North Wind Farm | Sidman, PA | 194.5 GWh | 10.9 mi |
Homer City Generating Station | Homer City, PA | 670.0 GWh | 34.7 mi |
Indiana University of Pennsylvania | Indiana, PA | 23.7 GWh | 34.6 mi |
Patton Wind Farm | Patton, PA | 91.1 GWh | 15.5 mi |
Sandy Ridge Wind 2, LLC | Tyrone, PA | 111.3 GWh | 27.1 mi |
Sandy Ridge Wind Farm | Tyrone, PA | 122.2 GWh | 24.2 mi |
Seward (PA) | New Florence, PA | 2.5 TWh | 25.9 mi |
Stony Creek Wind Farm LLC | Berlin, PA | 153.4 GWh | 31.6 mi |
Warrior Ridge Hydro | Petersburg, PA | 218.5 MWh | 27.7 mi |
William F Matson Generating Station | Huntingdon, PA | 75.8 GWh | 28.4 mi |