North Allegheny Windpower Project
St. Hwy 53 & US Hwy 22, Lilly, PA 15938Plant Summary Information
North Allegheny Windpower Project is ranked #6 out of 27 wind farms in Pennsylvania in terms of total annual net electricity generation.
North Allegheny Windpower Project generated 78.8 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | North Allegheny Windpower Project |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Blair County, PA |
Initial Operation Date | September 2009 |
Last Update | Mar 2025 |
Annual Generation | 203.5 GWh |
Annual Consumption | 695.4 k MMBtu |
Ranked #2,331 out of 11,623 Power Plants Nationwide | |
Ranked #718 out of 1,344 Wind Power Plants Nationwide | |
Ranked #61 out of 225 Pennsylvania Power Plants | |
Ranked #6 out of 27 Pennsylvania Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Duke Energy DEGS North Allegheny (2013 to 2021) Duke Energy Renewables Services (2022 to 2023) |
Map of North Allegheny Windpower Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Allegheny Windpower Project.
Monthly Net Generation for North Allegheny Windpower Project
North Allegheny Windpower Project Details
Summary Information | |
---|---|
Plant Name | North Allegheny Windpower Project (56651) |
Plant Address | St. Hwy 53 & US Hwy 22, Lilly, PA 15938 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 40.4381, -78.5436 |
Generation Dates on File | Sep 2009 to Mar 2025 |
Initial Operation Date | September 2009 |
Annual Generation | 203.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Pennsylvania Electric Co (14711) PA |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating September 2009
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 75 MW |
Summer Capacity | 75 MW |
Winter Capacity | 75 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | September 2009 |
Combined Heat & Power | No |
---|---|
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 35 |
Planned New Prime Mover | WT |
Planned Energy Source | WND |
Planned New Nameplate Capacity | 70 MW |
Planned Repower | April 2024 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 35 |
---|---|
Predominant Turbine Manufacturer | Gamesa |
Predominant Turbine Model Number | G87-2.0 |
Design Wind Speed | 14.9 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 272 |
North Allegheny Windpower Project Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Duke Energy DEGS North Allegheny | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#708 | Steele Flats Wind Project LLC | Diller, NE | 209.0 GWh |
#709 | Spearville | Ford, KS | 208.9 GWh |
#710 | Elm Creek Wind LLC | Trimont, MN | 208.9 GWh |
#711 | Cedar Springs Wind IV | Douglas, WY | 208.6 GWh |
#712 | Hoosier Wind Project LLC | Goodland, IN | 207.8 GWh |
#713 | Taloga Wind LLC | Putnam, OK | 205.6 GWh |
#714 | Oasis Wind | Mojave, CA | 205.4 GWh |
#715 | Meadow Lake Wind Farm II LLC | Lafayette, IN | 205.1 GWh |
#716 | San Gorgonio Windplant WPP1993 | North Palm Springs, CA | 204.3 GWh |
#717 | Crescent Ridge | Tiskilwa, IL | 203.8 GWh |
#719 | Hog Creek Wind Project | Ada, OH | 203.2 GWh |
#720 | Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh |
#721 | Scurry County Wind II | Snyder, TX | 201.1 GWh |
#722 | Red Mesa Wind LLC | Seboyeta, NM | 201.1 GWh |
#723 | Windthorst-2 | Archer, TX | 201.0 GWh |
#724 | Flat Water Wind Farm LLC | Du Bois, NE | 200.7 GWh |
#725 | Milo Wind Project LLC | Portales, NM | 200.6 GWh |
#726 | Allegheny Ridge Wind Farm | Portage, PA | 200.6 GWh |
#727 | Buffalo Gap Wind Farm | Merkel, TX | 198.5 GWh |
#728 | Spearville 3 LLC | Spearville, KS | 198.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding North Allegheny Windpower Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allegheny Ridge Wind Farm | Portage, PA | 200.6 GWh | 4.2 mi |
Cambria Wind LLC | Sidman, PA | 121.6 GWh | 12.1 mi |
Chestnut Flats Wind Farm | Altoona, PA | 92.8 GWh | 6.8 mi |
Colver Green Energy | Colver, PA | 702.3 GWh | 15.5 mi |
Conemaugh | New Florence, PA | 4.0 TWh | 27.5 mi |
CPV Fairview Energy Center | Johnstown, PA | 7.6 TWh | 16.5 mi |
CPV Maple Hill Solar | Portage, PA | 162.5 GWh | 8.1 mi |
Ebensburg Power | Ebensburg, PA | 285.1 GWh | 10.8 mi |
Forward Windpower LLC | Berlin, PA | 44.3 GWh | 29.6 mi |
Glades Pike Generation Plant | Somerset, PA | 11.1 GWh | 39.7 mi |
Highland North Wind Farm | Sidman, PA | 167.3 GWh | 10.9 mi |
Indiana University of Pennsylvania | Indiana, PA | 12.6 GWh | 34.6 mi |
Patton Wind Farm | Patton, PA | 81.2 GWh | 15.5 mi |
Sandy Ridge Wind 2, LLC | Tyrone, PA | 243.9 GWh | 27.1 mi |
Sandy Ridge Wind Farm | Tyrone, PA | 114.5 GWh | 24.2 mi |
Seward (PA) | New Florence, PA | 2.0 TWh | 25.9 mi |
Somerset Windpower LLC | Ohiopyle, PA | 6.2 GWh | 40.2 mi |
Stony Creek Wind Farm LLC | Berlin, PA | 128.0 GWh | 31.6 mi |
UN-School House LLC | Morris Township, PA | 31.0 GWh | 41 mi |
William F Matson Generating Station | Huntingdon, PA | 72.2 GWh | 28.4 mi |