Buckthorn Wind
11265 Country Road 109, Mingus, TX 76463Plant Summary Information
Buckthorn Wind is ranked #147 out of 224 wind farms in Texas in terms of total annual net electricity generation.
Buckthorn Wind generated 71.5 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Buckthorn Wind |
|---|---|
| Utility Name | Buckthorn Wind Project, LLC |
| Location | Erath County, TX |
| Initial Operation Date | December 2017 |
| Last Update | Sep 2025 |
| Annual Generation | 353.9 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,751 out of 12,539 Power Plants Nationwide | |
| Ranked #516 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #338 out of 799 Texas Power Plants | |
| Ranked #147 out of 224 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Buckthorn Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buckthorn Wind.
Monthly Net Generation for Buckthorn Wind
Buckthorn Wind Details
| Summary Information | |
|---|---|
| Plant Name | Buckthorn Wind (60983) |
| Plant Address | 11265 Country Road 109, Mingus, TX 76463 |
| Utility | Buckthorn Wind Project, LLC (60617) |
| Latitude, Longitude | 32.37131, -98.37739 |
| Generation Dates on File | Dec 2017 to Sep 2025 |
| Initial Operation Date | December 2017 |
| Annual Generation | 353.9 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator BWIND Details Operating December 2017
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 100.5 MW |
| Summer Capacity | 100.5 MW |
| Winter Capacity | 100.5 MW |
| Minimum Load | 3.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 29 |
| Turbine Details | |
| Number Of Turbines | 29 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V126-3.45 |
| Design Wind Speed | 16.7 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 298 |
Buckthorn Wind Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #506 | Palmas Wind, LLC | Rio Hondo, TX | 358.7 GWh |
| #507 | Benton County Wind Farm | Earl Park, IN | 357.6 GWh |
| #508 | Baron Winds Farm | Cohocton, NY | 357.4 GWh |
| #509 | Vansycle II Wind Energy Center | Athena, OR | 357.3 GWh |
| #510 | White Rock West Wind Project | Anadarko, OK | 356.3 GWh |
| #511 | Seiling Wind II | Seiling, OK | 356.1 GWh |
| #512 | Arbuckle Mountain Wind Farm LLC | Davis, OK | 355.9 GWh |
| #513 | Colorado Highlands Wind | Fleming, CO | 355.0 GWh |
| #514 | Bitter Ridge Wind Farm, LLC | Redkey, IN | 354.6 GWh |
| #515 | Settlers Trail Wind Farm LLC | Sheldon, IL | 353.9 GWh |
| #517 | Los Vientos Wind 1B | Sebastian, TX | 353.9 GWh |
| #518 | Roscoe Wind Farm LLC | Roscoe, TX | 352.5 GWh |
| #519 | Tule Wind LLC | Boulevard, CA | 351.7 GWh |
| #520 | High Lonesome Mesa LLC | Willard, NM | 351.7 GWh |
| #521 | Willow Creek Wind Power LLC | Newell, SD | 351.7 GWh |
| #522 | Blue Summit II Wind | Vernon, TX | 351.5 GWh |
| #523 | Duran Mesa LLC | Duran, NM | 351.3 GWh |
| #524 | Buffalo Gap 2 Wind Farm | Merkel, TX | 351.2 GWh |
| #525 | Hopkins Ridge Wind | Dayton, WA | 350.9 GWh |
| #526 | Tyler Bluff Wind Project, LLC | Muenster, TX | 350.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buckthorn Wind.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barton Chapel Wind Farm | Jacksboro, TX | 210.9 GWh | 47.1 mi |
| BMP Wind (TX) | Baird, TX | 830.5 GWh | 53.7 mi |
| Century Oak Wind Project, LLC | Cisco, TX | 515.5 GWh | 45.8 mi |
| Comanche Peak | Glen Rose, TX | 18.9 TWh | 34.9 mi |
| DeCordova Steam Electric Station | Granbury, TX | 36.9 GWh | 39.6 mi |
| Flat Top Wind I | Mullin, TX | 752.9 GWh | 49.3 mi |
| Graham | Graham, TX | 1.0 TWh | 54.5 mi |
| Grizzly Ridge Solar | Hamilton County, TX | 137.3 GWh | 44.8 mi |
| Logans Gap Wind LLC | Comanche, TX | 579.2 GWh | 42.1 mi |
| R W Miller | Palo Pinto, TX | 799.8 GWh | 20.2 mi |
| Ranchland Wind Project I | Cisco, TX | 431.4 GWh | 46.2 mi |
| Ranchland Wind Project II | Cisco, TX | 491.6 GWh | 46.1 mi |
| Roadrunner Wind Farm | Cisco, TX | 914.8 GWh | 42.9 mi |
| Silver Star I Wind Power Project | Dublin, TX | 200.5 GWh | 6.2 mi |
| TPE Erath Solar, LLC | Stephenville, TX | 22.6 GWh | 12.4 mi |
| Walnut Springs Solar | Walnut Springs, TX | 8.4 GWh | 40.9 mi |
| Wise County Power LLC | Poolville, TX | 2.9 TWh | 54.7 mi |
| Wolf Hollow I LP | Granbury, TX | 3.1 TWh | 37.8 mi |
| Wolf Hollow II | Granbury, TX | 5.8 TWh | 37.6 mi |
| Yellow Jacket | Meridian, TX | 10.0 GWh | 52 mi |