Notrees Windpower Hybrid
19991 Sheep Pasture Rd., Goldsmith, TX 79741Plant Summary Information
Notrees Windpower Hybrid is ranked #173 out of 224 wind farms in Texas in terms of total annual net electricity generation.
Notrees Windpower Hybrid generated 57.2 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Notrees Windpower Hybrid |
|---|---|
| Utility Name | Duke Energy Renewables Services |
| Location | Ector County, TX |
| Initial Operation Date | April 2009 |
| Last Update | Sep 2025 |
| Annual Generation | 264.5 GWh |
| Annual Consumption | 994.4 k MMBtu |
| Ranked #2,120 out of 12,539 Power Plants Nationwide | |
| Ranked #631 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #392 out of 799 Texas Power Plants | |
| Ranked #173 out of 224 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Duke Energy DEGS Notrees (2013 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Notrees Windpower Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Notrees Windpower Hybrid.
Monthly Net Generation for Notrees Windpower Hybrid
Notrees Windpower Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Notrees Windpower Hybrid (56961) |
| Plant Address | 19991 Sheep Pasture Rd., Goldsmith, TX 79741 |
| Utility | Duke Energy Renewables Services (65411) |
| Latitude, Longitude | 31.995, -102.82833 |
| Generation Dates on File | Apr 2009 to Sep 2025 |
| Initial Operation Date | April 2009 |
| Annual Generation | 264.5 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator GE Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 60 MW |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 40 |
| Turbine Details | |
| Number Of Turbines | 40 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Generator VESTA Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 92.5 MW |
| Summer Capacity | 92.5 MW |
| Winter Capacity | 92.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 56 |
| Turbine Details | |
| Number Of Turbines | 56 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V82-1.65 |
| Design Wind Speed | 15.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Generator BATT Details Operating December 2012
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Jointly Owned |
| Nameplate Capacity | 36 MW |
| Summer Capacity | 36 MW |
| Winter Capacity | 36 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 13.6 |
|---|---|
| Maximum Charge Rate | 36 MW |
| Maximum Discharge Rate | 36 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 36 |
| Storage Enclosure Type | BL |
| Frequency Regulation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 56961 / 56951 |
| Direct Support Gen Id | GE / VESTA |
| Support T D Asset | Yes |
Notrees Windpower Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator BATT | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator BATT | 99.00% |
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator GE | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator GE | 99.00% |
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator VESTA | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator VESTA | 99.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #621 | High Plains | Rock River, WY | 274.1 GWh |
| #622 | Twin Ridges Wind Farm | Meyersdale, PA | 273.9 GWh |
| #623 | High Prairie Wind Farm | Queen City, MO | 273.5 GWh |
| #624 | Vantage Wind Energy LLC | Ellensburg, WA | 273.2 GWh |
| #625 | Pioneer Wind Park, LLC | Glenrock, WY | 273.0 GWh |
| #626 | Saratoga Wind Farm | Lime Springs, IA | 272.3 GWh |
| #627 | Eight Point Wind | Rexville, NY | 271.3 GWh |
| #628 | Alta Wind XI | Mojave, CA | 269.5 GWh |
| #629 | Meadow Lake Wind Farm III LLC | Lafayette, IN | 269.3 GWh |
| #630 | Steele Flats Wind Project LLC | Diller, NE | 269.1 GWh |
| #632 | Hatchet Ridge Wind Project | Burney, CA | 268.2 GWh |
| #633 | Shiloh III Wind Project LLC | Birds Landing, CA | 265.2 GWh |
| #634 | Bull Creek Wind | O'Donnell, TX | 265.2 GWh |
| #635 | Mehoopany Wind Energy LLC | Noxen, PA | 265.0 GWh |
| #636 | Gray County Wind Energy | Montezuma, KS | 264.1 GWh |
| #637 | Mendota Hills, LLC | Paw Paw, IL | 263.7 GWh |
| #638 | Harvest Wind Project | Roosevelt, WA | 263.7 GWh |
| #639 | Borderlands Wind, LLC | Quemado, NM | 263.6 GWh |
| #640 | Campbell Hill Windpower | Glenrock, WY | 263.4 GWh |
| #641 | Windstar 1 | Tehachapi, CA | 263.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Notrees Windpower Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 974.1 GWh | 19.5 mi |
| Bakke | Andrews, TX | 221.0 MWh | 26.8 mi |
| Ector County Energy Center | Goldsmith, TX | 648.7 GWh | 15.1 mi |
| Frankel | Andrews, TX | 165.0 MWh | 26.8 mi |
| Goldsmith | Goldsmith, TX | 184.0 MWh | 11.4 mi |
| Jumbo Hill Wind Project | Andrews, TX | 595.9 GWh | 27.9 mi |
| N. Mary Francis | Odessa, TX | 216.0 MWh | 23.8 mi |
| Oberon IA | Odessa, TX | 306.3 GWh | 21.5 mi |
| Oberon IB | Odessa, TX | 61.4 GWh | 22.3 mi |
| Odessa-Ector Power Plant | Odessa, TX | 7.9 TWh | 31.3 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 40.5 GWh | 11.4 mi |
| Permian Basin | Monahans, TX | 464.5 GWh | 29.5 mi |
| Phoebe Solar | Kermit, TX | 554.5 GWh | 10.7 mi |
| Prospero Solar | Andrews, TX | 758.9 GWh | 20.2 mi |
| Prospero Solar II | Andrews, TX | 671.4 GWh | 19.4 mi |
| SPS1 Dollarhide | Jal, NM | 23.0 GWh | 20.3 mi |
| SPS2 Jal | Jal, NM | 21.1 GWh | 24.5 mi |
| Swift Air Solar I | Goldsmith, TX | 228.1 GWh | 17.5 mi |
| Tumbleweed | Andrews, TX | 200.0 MWh | 29.3 mi |
| Westover | Odessa, TX | 185.0 MWh | 25 mi |