Notrees Windpower Hybrid
19991 Sheep Pasture Rd., Goldsmith, TX 79741Plant Summary Information
Notrees Windpower Hybrid is ranked #190 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Notrees Windpower Hybrid generated 39.8 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Notrees Windpower Hybrid |
|---|---|
| Utility Name | Deriva Energy |
| Location | Ector County, TX |
| Initial Operation Date | April 2009 |
| Last Update | Jun 2026 |
| Annual Generation | 217.0 GWh |
| Annual Consumption | 810.2 k MMBtu |
| Ranked #2,441 out of 13,094 Power Plants Nationwide | |
| Ranked #725 out of 1,369 Wind Power Plants Nationwide | |
| Ranked #462 out of 858 Texas Power Plants | |
| Ranked #190 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Duke Energy DEGS Notrees (2013 to 2021) Duke Energy Renewables Services (2022 to 2024) Deriva Energy (2025 to 2025) |
Map of Notrees Windpower Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Notrees Windpower Hybrid.
Monthly Net Generation for Notrees Windpower Hybrid
Monthly Plant Fuel Consumption for Notrees Windpower Hybrid
Notrees Windpower Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Notrees Windpower Hybrid (56961) |
| Plant Address | 19991 Sheep Pasture Rd., Goldsmith, TX 79741 |
| Utility | Deriva Energy (65411) |
| Latitude, Longitude | 31.995, -102.82833 |
| Generation Dates on File | Apr 2009 to Jun 2026 |
| Initial Operation Date | April 2009 |
| Annual Generation | 217.0 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator GE Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 60 MW |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 40 |
| Turbine Details | |
| Number Of Turbines | 40 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Generator VESTA Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 92.5 MW |
| Summer Capacity | 92.5 MW |
| Winter Capacity | 92.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 56 |
| Turbine Details | |
| Number Of Turbines | 56 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V82-1.65 |
| Design Wind Speed | 15.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Generator BATT Details Operating December 2012
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Jointly Owned |
| Nameplate Capacity | 36 MW |
| Summer Capacity | 36 MW |
| Winter Capacity | 36 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 13.6 |
|---|---|
| Maximum Charge Rate | 36 MW |
| Maximum Discharge Rate | 36 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 36 |
| Storage Enclosure Type | BL |
| Frequency Regulation | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 56961 / 56951 |
| Direct Support Gen Id | GE / VESTA |
| Support T D Asset | Yes |
Notrees Windpower Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator BATT | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator BATT | 99.00% |
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator GE | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator GE | 99.00% |
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator VESTA | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator VESTA | 99.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #715 | Vasco Winds | Livermore, CA | 233.7 GWh |
| #716 | Crystal Lake 3 LLC | Britt, IA | 233.0 GWh |
| #717 | Stony Creek Wind Farm NY | Strykersville, NY | 232.9 GWh |
| #718 | Hackberry Wind Farm | Albany, TX | 228.4 GWh |
| #719 | Twin Buttes Wind Project | Lamar, CO | 228.2 GWh |
| #720 | Wessington Springs | Wessington Springs, SD | 225.9 GWh |
| #721 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 225.1 GWh |
| #722 | Corriedale Wind Energy | Cheyenne, WY | 224.6 GWh |
| #723 | Broken Bow Wind LLC | Broken Bow, NE | 221.7 GWh |
| #724 | Oasis Wind | Mojave, CA | 221.1 GWh |
| #726 | Smoky Hills Wind Project Phase II | Lincoln, KS | 220.4 GWh |
| #727 | Rockland Wind Farm | American Falls, ID | 219.4 GWh |
| #728 | Alta Wind VIII | Mojave, CA | 219.2 GWh |
| #729 | San Juan Mesa Wind Project LLC | Elida, NM | 219.1 GWh |
| #730 | Point Wind | Tehachapi, CA | 218.9 GWh |
| #731 | Top Hat Wind | Beason, IL | 215.5 GWh |
| #732 | High Winds LLC | Birds Landing, CA | 214.3 GWh |
| #733 | Hog Creek Wind Project | Ada, OH | 213.6 GWh |
| #734 | Gratiot Wind Park | Breckenridge, MI | 212.9 GWh |
| #735 | Blue Canyon Windpower VI LLC | Carnegie, OK | 212.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Notrees Windpower Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh | 19.5 mi |
| Bakke | Andrews, TX | 107.0 MWh | 26.8 mi |
| Ector County Energy Center | Goldsmith, TX | 934.6 GWh | 15.1 mi |
| Frankel | Andrews, TX | 67.0 MWh | 26.8 mi |
| Goldsmith | Goldsmith, TX | 101.0 MWh | 11.4 mi |
| N. Mary Francis | Odessa, TX | 116.0 MWh | 23.8 mi |
| Oberon IA | Odessa, TX | 254.1 GWh | 21.5 mi |
| Oberon IB | Odessa, TX | 46.1 GWh | 22.3 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 38.8 GWh | 11.4 mi |
| Phoebe Solar | Kermit, TX | 507.5 GWh | 10.7 mi |
| Prospero Solar | Andrews, TX | 678.4 GWh | 20.2 mi |
| Prospero Solar II | Andrews, TX | 653.3 GWh | 19.4 mi |
| Rockhound A | Odessa, TX | 57.9 GWh | 26.1 mi |
| Rockhound C | Odessa, TX | 12.3 GWh | 26.1 mi |
| SPS1 Dollarhide | Jal, NM | 22.5 GWh | 20.3 mi |
| SPS2 Jal | Jal, NM | 21.8 GWh | 24.5 mi |
| Swift Air Solar I | Goldsmith, TX | 384.3 GWh | 17.5 mi |
| Swift Air Solar II | Odessa, TX | 215.3 GWh | 26.1 mi |
| Swift Air Solar III | Odessa, TX | 146.9 GWh | 26.1 mi |
| Westover | Odessa, TX | 100.0 MWh | 25 mi |