Notrees Windpower Hybrid

19991 Sheep Pasture Rd., Goldsmith, TX 79741

Plant Summary Information

Notrees Windpower Hybrid is ranked #173 out of 224 wind farms in Texas in terms of total annual net electricity generation.

Notrees Windpower Hybrid generated 57.2 GWh during the 3-month period between June 2025 to September 2025.

Plant NameNotrees Windpower Hybrid
Utility NameDuke Energy Renewables Services
LocationEctor County, TX
Initial Operation DateApril 2009
Last Update Sep 2025
Annual Generation 264.5 GWh
Annual Consumption 994.4 k MMBtu
Ranked #2,120 out of 12,539 Power Plants Nationwide
Ranked #631 out of 1,362 Wind Power Plants Nationwide
Ranked #392 out of 799 Texas Power Plants
Ranked #173 out of 224 Texas Wind Power Plants
Fuel Types Wind
Previous Operator Duke Energy DEGS Notrees (2013 to 2021)
Duke Energy Renewables Services (2022 to 2024)

Map of Notrees Windpower Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Notrees Windpower Hybrid.

Create Your Account Today

Monthly Net Generation for Notrees Windpower Hybrid

Notrees Windpower Hybrid Details

Summary Information
Plant NameNotrees Windpower Hybrid (56961)
Plant Address19991 Sheep Pasture Rd., Goldsmith, TX 79741
UtilityDuke Energy Renewables Services (65411)
Latitude, Longitude31.995, -102.82833
Generation Dates on FileApr 2009 to Sep 2025
Initial Operation DateApril 2009
Annual Generation 264.5 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 138.00 kV
Energy StorageYes

Generator GE Details Operating April 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipJointly Owned
Nameplate Capacity60 MW
Summer Capacity60 MW
Winter Capacity60 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys40
Turbine Details
Number Of Turbines40
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed15 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

Generator VESTA Details Operating April 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipJointly Owned
Nameplate Capacity92.5 MW
Summer Capacity92.5 MW
Winter Capacity92.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys56
Turbine Details
Number Of Turbines56
Predominant Turbine ManufacturerVestas
Predominant Turbine Model NumberV82-1.65
Design Wind Speed15.8 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

Generator BATT Details Operating December 2012

TechnologyBatteries
Prime MoverBattery
OwnershipJointly Owned
Nameplate Capacity36 MW
Summer Capacity36 MW
Winter Capacity36 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH13.6
Maximum Charge Rate36 MW
Maximum Discharge Rate36 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating36
Storage Enclosure TypeBL
Frequency RegulationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id56961 / 56951
Direct Support Gen IdGE / VESTA
Support T D AssetYes

Notrees Windpower Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator BATT1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator BATT99.00%
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator GE1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator GE99.00%
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator VESTA1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator VESTA99.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#621High PlainsRock River, WY274.1 GWh
#622Twin Ridges Wind FarmMeyersdale, PA273.9 GWh
#623High Prairie Wind FarmQueen City, MO273.5 GWh
#624Vantage Wind Energy LLCEllensburg, WA273.2 GWh
#625Pioneer Wind Park, LLCGlenrock, WY273.0 GWh
#626Saratoga Wind FarmLime Springs, IA272.3 GWh
#627Eight Point WindRexville, NY271.3 GWh
#628Alta Wind XIMojave, CA269.5 GWh
#629Meadow Lake Wind Farm III LLCLafayette, IN269.3 GWh
#630Steele Flats Wind Project LLCDiller, NE269.1 GWh
#632Hatchet Ridge Wind ProjectBurney, CA268.2 GWh
#633Shiloh III Wind Project LLCBirds Landing, CA265.2 GWh
#634Bull Creek WindO'Donnell, TX265.2 GWh
#635Mehoopany Wind Energy LLCNoxen, PA265.0 GWh
#636Gray County Wind EnergyMontezuma, KS264.1 GWh
#637Mendota Hills, LLCPaw Paw, IL263.7 GWh
#638Harvest Wind ProjectRoosevelt, WA263.7 GWh
#639Borderlands Wind, LLCQuemado, NM263.6 GWh
#640Campbell Hill WindpowerGlenrock, WY263.4 GWh
#641Windstar 1Tehachapi, CA263.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Notrees Windpower Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
2W Permian Solar Project HybridAndrews, TX974.1 GWh19.5 mi
BakkeAndrews, TX221.0 MWh26.8 mi
Ector County Energy CenterGoldsmith, TX648.7 GWh15.1 mi
FrankelAndrews, TX165.0 MWh26.8 mi
GoldsmithGoldsmith, TX184.0 MWh11.4 mi
Jumbo Hill Wind ProjectAndrews, TX595.9 GWh27.9 mi
N. Mary FrancisOdessa, TX216.0 MWh23.8 mi
Oberon IAOdessa, TX306.3 GWh21.5 mi
Oberon IBOdessa, TX61.4 GWh22.3 mi
Odessa-Ector Power PlantOdessa, TX7.9 TWh31.3 mi
Oxy Renewable Energy - GoldsmithGoldsmith, TX40.5 GWh11.4 mi
Permian BasinMonahans, TX464.5 GWh29.5 mi
Phoebe SolarKermit, TX554.5 GWh10.7 mi
Prospero SolarAndrews, TX758.9 GWh20.2 mi
Prospero Solar IIAndrews, TX671.4 GWh19.4 mi
SPS1 DollarhideJal, NM23.0 GWh20.3 mi
SPS2 JalJal, NM21.1 GWh24.5 mi
Swift Air Solar IGoldsmith, TX228.1 GWh17.5 mi
TumbleweedAndrews, TX200.0 MWh29.3 mi
WestoverOdessa, TX185.0 MWh25 mi