Notrees Windpower Hybrid
19991 Sheep Pasture Rd., Goldsmith, TX 79741Plant Summary Information
Notrees Windpower Hybrid is ranked #190 out of 228 wind farms in Texas in terms of total annual net electricity generation.
Notrees Windpower Hybrid generated 55.4 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Notrees Windpower Hybrid |
|---|---|
| Utility Name | Duke Energy Renewables Services |
| Location | Ector County, TX |
| Initial Operation Date | April 2009 |
| Last Update | May 2026 |
| Annual Generation | 220.4 GWh |
| Annual Consumption | 846.2 k MMBtu |
| Ranked #2,413 out of 13,081 Power Plants Nationwide | |
| Ranked #720 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #454 out of 852 Texas Power Plants | |
| Ranked #190 out of 228 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Duke Energy DEGS Notrees (2013 to 2021) Duke Energy Renewables Services (2022 to 2025) |
Map of Notrees Windpower Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Notrees Windpower Hybrid.
Monthly Net Generation for Notrees Windpower Hybrid
Monthly Plant Fuel Consumption for Notrees Windpower Hybrid
Notrees Windpower Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Notrees Windpower Hybrid (56961) |
| Plant Address | 19991 Sheep Pasture Rd., Goldsmith, TX 79741 |
| Utility | Duke Energy Renewables Services (65411) |
| Latitude, Longitude | 31.995, -102.82833 |
| Generation Dates on File | Apr 2009 to May 2026 |
| Initial Operation Date | April 2009 |
| Annual Generation | 220.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Oncor Electric Delivery Company LLC (44372) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator GE Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 60 MW |
| Summer Capacity | 60 MW |
| Winter Capacity | 60 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 40 |
| Turbine Details | |
| Number Of Turbines | 40 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.5 SLE |
| Design Wind Speed | 15 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Generator VESTA Details Operating April 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Jointly Owned |
| Nameplate Capacity | 92.5 MW |
| Summer Capacity | 92.5 MW |
| Winter Capacity | 92.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Turbines/Hydrokinetic Buoys | 56 |
| Turbine Details | |
| Number Of Turbines | 56 |
|---|---|
| Predominant Turbine Manufacturer | Vestas |
| Predominant Turbine Model Number | V82-1.65 |
| Design Wind Speed | 15.8 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 272 |
Generator BATT Details Operating December 2012
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Jointly Owned |
| Nameplate Capacity | 36 MW |
| Summer Capacity | 36 MW |
| Winter Capacity | 36 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2012 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 13.6 |
|---|---|
| Maximum Charge Rate | 36 MW |
| Maximum Discharge Rate | 36 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 36 |
| Storage Enclosure Type | BL |
| Frequency Regulation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 56961 / 56951 |
| Direct Support Gen Id | GE / VESTA |
| Support T D Asset | Yes |
Notrees Windpower Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator BATT | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator BATT | 99.00% |
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator GE | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator GE | 99.00% |
| TE Notrees LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator VESTA | 1.00% |
| DEGS Wind 1 LLC | 400 S Tryon StST3153, Charlotte, NC 28285 | Generator VESTA | 99.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #710 | Gray County Wind Energy | Montezuma, KS | 237.3 GWh |
| #711 | Klondike Windpower II | Wasco, OR | 235.8 GWh |
| #712 | Lake Benton I | Lake Benton, MN | 234.7 GWh |
| #713 | Vasco Winds | Livermore, CA | 233.7 GWh |
| #714 | Borderlands Wind, LLC | Quemado, NM | 233.7 GWh |
| #715 | Stony Creek Wind Farm NY | Strykersville, NY | 232.9 GWh |
| #716 | Crystal Lake 3 LLC | Britt, IA | 230.8 GWh |
| #717 | Hackberry Wind Farm | Albany, TX | 228.4 GWh |
| #718 | Twin Buttes Wind Project | Lamar, CO | 228.2 GWh |
| #719 | FPL Energy Vansycle LLC (OR) | Touchet, OR | 225.1 GWh |
| #721 | San Juan Mesa Wind Project LLC | Elida, NM | 223.9 GWh |
| #722 | Wessington Springs | Wessington Springs, SD | 223.7 GWh |
| #723 | Broken Bow Wind LLC | Broken Bow, NE | 221.7 GWh |
| #724 | Oasis Wind | Mojave, CA | 221.1 GWh |
| #725 | Smoky Hills Wind Project Phase II | Lincoln, KS | 220.4 GWh |
| #726 | Rockland Wind Farm | American Falls, ID | 219.4 GWh |
| #727 | Alta Wind VIII | Mojave, CA | 219.2 GWh |
| #728 | Corriedale Wind Energy | Cheyenne, WY | 218.0 GWh |
| #729 | Point Wind | Tehachapi, CA | 216.2 GWh |
| #730 | Top Hat Wind | Beason, IL | 215.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Notrees Windpower Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 2W Permian Solar Project Hybrid | Andrews, TX | 1.0 TWh | 19.5 mi |
| Bakke | Andrews, TX | 107.0 MWh | 26.8 mi |
| Ector County Energy Center | Goldsmith, TX | 934.6 GWh | 15.1 mi |
| Frankel | Andrews, TX | 67.0 MWh | 26.8 mi |
| Goldsmith | Goldsmith, TX | 101.0 MWh | 11.4 mi |
| Jumbo Hill Wind Project | Andrews, TX | 579.1 GWh | 27.9 mi |
| N. Mary Francis | Odessa, TX | 116.0 MWh | 23.8 mi |
| Oberon IA | Odessa, TX | 262.9 GWh | 21.5 mi |
| Oberon IB | Odessa, TX | 47.8 GWh | 22.3 mi |
| Oxy Renewable Energy - Goldsmith | Goldsmith, TX | 38.8 GWh | 11.4 mi |
| Phoebe Solar | Kermit, TX | 515.5 GWh | 10.7 mi |
| Prospero Solar | Andrews, TX | 694.4 GWh | 20.2 mi |
| Prospero Solar II | Andrews, TX | 654.3 GWh | 19.4 mi |
| SPS1 Dollarhide | Jal, NM | 22.5 GWh | 20.3 mi |
| SPS2 Jal | Jal, NM | 21.8 GWh | 24.5 mi |
| Swift Air Solar I | Goldsmith, TX | 398.2 GWh | 17.5 mi |
| Swift Air Solar II | Odessa, TX | 179.7 GWh | 26.1 mi |
| Swift Air Solar III | Odessa, TX | 123.0 GWh | 26.1 mi |
| Tumbleweed | Andrews, TX | 132.0 MWh | 29.3 mi |
| Westover | Odessa, TX | 100.0 MWh | 25 mi |