Notrees Windpower Hybrid

19991 Sheep Pasture Rd., Goldsmith, TX 79741

Plant Summary Information

Notrees Windpower Hybrid is ranked #182 out of 227 wind farms in Texas in terms of total annual net electricity generation.

Notrees Windpower Hybrid generated 48.9 GWh during the 3-month period between September 2025 to December 2025.

Plant NameNotrees Windpower Hybrid
Utility NameDuke Energy Renewables Services
LocationEctor County, TX
Initial Operation DateApril 2009
Last Update Dec 2025
Annual Generation 237.1 GWh
Annual Consumption 901.9 k MMBtu
Ranked #2,285 out of 12,613 Power Plants Nationwide
Ranked #692 out of 1,374 Wind Power Plants Nationwide
Ranked #418 out of 816 Texas Power Plants
Ranked #182 out of 227 Texas Wind Power Plants
Fuel Types Wind
Previous Operator Duke Energy DEGS Notrees (2013 to 2021)
Duke Energy Renewables Services (2022 to 2024)

Map of Notrees Windpower Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Notrees Windpower Hybrid.

Create Your Account Today

Monthly Net Generation for Notrees Windpower Hybrid

Monthly Plant Fuel Consumption for Notrees Windpower Hybrid

Notrees Windpower Hybrid Details

Summary Information
Plant NameNotrees Windpower Hybrid (56961)
Plant Address19991 Sheep Pasture Rd., Goldsmith, TX 79741
UtilityDuke Energy Renewables Services (65411)
Latitude, Longitude31.995, -102.82833
Generation Dates on FileApr 2009 to Dec 2025
Initial Operation DateApril 2009
Annual Generation 237.1 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 138.00 kV
Energy StorageYes

Generator GE Details Operating April 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipJointly Owned
Nameplate Capacity60 MW
Summer Capacity60 MW
Winter Capacity60 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys40
Turbine Details
Number Of Turbines40
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed15 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

Generator VESTA Details Operating April 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipJointly Owned
Nameplate Capacity92.5 MW
Summer Capacity92.5 MW
Winter Capacity92.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys56
Turbine Details
Number Of Turbines56
Predominant Turbine ManufacturerVestas
Predominant Turbine Model NumberV82-1.65
Design Wind Speed15.8 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

Generator BATT Details Operating December 2012

TechnologyBatteries
Prime MoverBattery
OwnershipJointly Owned
Nameplate Capacity36 MW
Summer Capacity36 MW
Winter Capacity36 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH13.6
Maximum Charge Rate36 MW
Maximum Discharge Rate36 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating36
Storage Enclosure TypeBL
Frequency RegulationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id56961 / 56951
Direct Support Gen IdGE / VESTA
Support T D AssetYes

Notrees Windpower Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator BATT1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator BATT99.00%
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator GE1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator GE99.00%
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator VESTA1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator VESTA99.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#682Blackstone Wind Farm LLCRansom, IL250.1 GWh
#683Rising Tree Wind FarmMojave, CA249.0 GWh
#684Golden Hills WindLivermore, CA247.4 GWh
#685Farmers City Wind LLCTarkio, MO246.4 GWh
#686Klondike Windpower IIWasco, OR245.8 GWh
#687Sky River Wind Energy CenterTehachapi, CA245.0 GWh
#688Rolling HillsGlenrock, WY244.8 GWh
#689Lake Benton ILake Benton, MN243.8 GWh
#690Lost Lakes Wind Farm LLCLake Park, IA243.7 GWh
#691South Peak WindGeyser, MT243.6 GWh
#693Oasis WindMojave, CA238.4 GWh
#694Meadow Lake Wind Farm II LLCLafayette, IN237.4 GWh
#695Crystal Lake 3 LLCBritt, IA236.6 GWh
#696Armenia Mountain Wind FarmMainesburg, PA235.4 GWh
#697Gratiot Wind ParkBreckenridge, MI234.9 GWh
#698Point WindTehachapi, CA234.1 GWh
#699Los Vientos V Wind PowerRio Grande City, TX233.6 GWh
#700High Winds LLCBirds Landing, CA233.3 GWh
#701Pinyon Pine IIMojave, CA233.1 GWh
#702Twin Buttes Wind ProjectLamar, CO233.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Notrees Windpower Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
2W Permian Solar Project HybridAndrews, TX1.0 TWh19.5 mi
BakkeAndrews, TX221.0 MWh26.8 mi
Ector County Energy CenterGoldsmith, TX648.7 GWh15.1 mi
FrankelAndrews, TX165.0 MWh26.8 mi
GoldsmithGoldsmith, TX184.0 MWh11.4 mi
Jumbo Hill Wind ProjectAndrews, TX598.9 GWh27.9 mi
N. Mary FrancisOdessa, TX216.0 MWh23.8 mi
Oberon IAOdessa, TX302.7 GWh21.5 mi
Oberon IBOdessa, TX61.9 GWh22.3 mi
Oxy Renewable Energy - GoldsmithGoldsmith, TX40.5 GWh11.4 mi
Phoebe SolarKermit, TX557.3 GWh10.7 mi
Prospero SolarAndrews, TX759.4 GWh20.2 mi
Prospero Solar IIAndrews, TX667.0 GWh19.4 mi
SPS1 DollarhideJal, NM23.0 GWh20.3 mi
SPS2 JalJal, NM21.1 GWh24.5 mi
Swift Air Solar IGoldsmith, TX311.5 GWh17.5 mi
Swift Air Solar IIOdessa, TX33.9 GWh26.1 mi
Swift Air Solar IIIOdessa, TX21.3 GWh26.1 mi
TumbleweedAndrews, TX200.0 MWh29.3 mi
WestoverOdessa, TX185.0 MWh25 mi