Notrees Windpower Hybrid

19991 Sheep Pasture Rd., Goldsmith, TX 79741

Plant Summary Information

Notrees Windpower Hybrid is ranked #183 out of 227 wind farms in Texas in terms of total annual net electricity generation.

Notrees Windpower Hybrid generated 62.0 GWh during the 3-month period between November 2025 to February 2026.

Plant NameNotrees Windpower Hybrid
Utility NameDuke Energy Renewables Services
LocationEctor County, TX
Initial Operation DateApril 2009
Last Update Feb 2026
Annual Generation 236.5 GWh
Annual Consumption 891.3 k MMBtu
Ranked #2,297 out of 12,637 Power Plants Nationwide
Ranked #697 out of 1,376 Wind Power Plants Nationwide
Ranked #422 out of 820 Texas Power Plants
Ranked #183 out of 227 Texas Wind Power Plants
Fuel Types Wind
Previous Operator Duke Energy DEGS Notrees (2013 to 2021)
Duke Energy Renewables Services (2022 to 2024)

Map of Notrees Windpower Hybrid

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Notrees Windpower Hybrid.

Create Your Account Today

Monthly Net Generation for Notrees Windpower Hybrid

Monthly Plant Fuel Consumption for Notrees Windpower Hybrid

Notrees Windpower Hybrid Details

Summary Information
Plant NameNotrees Windpower Hybrid (56961)
Plant Address19991 Sheep Pasture Rd., Goldsmith, TX 79741
UtilityDuke Energy Renewables Services (65411)
Latitude, Longitude31.995, -102.82833
Generation Dates on FileApr 2009 to Feb 2026
Initial Operation DateApril 2009
Annual Generation 236.5 GWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 138.00 kV
Energy StorageYes

Generator GE Details Operating April 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipJointly Owned
Nameplate Capacity60 MW
Summer Capacity60 MW
Winter Capacity60 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys40
Turbine Details
Number Of Turbines40
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number1.5 SLE
Design Wind Speed15 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

Generator VESTA Details Operating April 2009

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipJointly Owned
Nameplate Capacity92.5 MW
Summer Capacity92.5 MW
Winter Capacity92.5 MW
Minimum Load0.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateApril 2009
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Solid Fuel Gasification No
Turbines/Hydrokinetic Buoys56
Turbine Details
Number Of Turbines56
Predominant Turbine ManufacturerVestas
Predominant Turbine Model NumberV82-1.65
Design Wind Speed15.8 MPH
Wind Quality Class2 - Medium Wind
Turbine Hub Height Feet272

Generator BATT Details Operating December 2012

TechnologyBatteries
Prime MoverBattery
OwnershipJointly Owned
Nameplate Capacity36 MW
Summer Capacity36 MW
Winter Capacity36 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2012
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Solid Fuel Gasification No
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH13.6
Maximum Charge Rate36 MW
Maximum Discharge Rate36 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating36
Storage Enclosure TypeBL
Frequency RegulationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id56961 / 56951
Direct Support Gen IdGE / VESTA
Support T D AssetYes

Notrees Windpower Hybrid Plant Owners

Owner NameAddressGeneratorOwnership
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator BATT1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator BATT99.00%
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator GE1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator GE99.00%
TE Notrees LLC400 S Tryon StST3153, Charlotte, NC 28285Generator VESTA1.00%
DEGS Wind 1 LLC400 S Tryon StST3153, Charlotte, NC 28285Generator VESTA99.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#687Rising Tree Wind FarmMojave, CA249.0 GWh
#688Apple Blossom Wind FarmPigeon, MI248.5 GWh
#689Wheatridge 1Lexington, OR248.1 GWh
#690Golden Hills WindLivermore, CA247.4 GWh
#691Farmers City Wind LLCTarkio, MO246.4 GWh
#692Klondike Windpower IIWasco, OR245.8 GWh
#693Sky River Wind Energy CenterTehachapi, CA245.0 GWh
#694Rolling HillsGlenrock, WY244.8 GWh
#695Lake Benton ILake Benton, MN243.8 GWh
#696Lost Lakes Wind Farm LLCLake Park, IA243.7 GWh
#698San Juan Mesa Wind Project LLCElida, NM240.5 GWh
#699Oasis WindMojave, CA238.4 GWh
#700Meadow Lake Wind Farm II LLCLafayette, IN237.4 GWh
#701Borderlands Wind, LLCQuemado, NM237.2 GWh
#702Armenia Mountain Wind FarmMainesburg, PA235.4 GWh
#703Kibby Wind FacilityChain of Ponds, ME234.8 GWh
#704Gratiot Wind ParkBreckenridge, MI234.6 GWh
#705Los Vientos V Wind PowerRio Grande City, TX233.6 GWh
#706High Winds LLCBirds Landing, CA233.3 GWh
#707Pinyon Pine IIMojave, CA233.1 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Notrees Windpower Hybrid.

Plant NamePlant LocationAnnual GenerationDistance
2W Permian Solar Project HybridAndrews, TX1.0 TWh19.5 mi
BakkeAndrews, TX221.0 MWh26.8 mi
Ector County Energy CenterGoldsmith, TX648.7 GWh15.1 mi
FrankelAndrews, TX165.0 MWh26.8 mi
GoldsmithGoldsmith, TX184.0 MWh11.4 mi
Jumbo Hill Wind ProjectAndrews, TX598.9 GWh27.9 mi
N. Mary FrancisOdessa, TX216.0 MWh23.8 mi
Oberon IAOdessa, TX288.4 GWh21.5 mi
Oberon IBOdessa, TX56.7 GWh22.3 mi
Oxy Renewable Energy - GoldsmithGoldsmith, TX40.5 GWh11.4 mi
Phoebe SolarKermit, TX537.3 GWh10.7 mi
Prospero SolarAndrews, TX739.4 GWh20.2 mi
Prospero Solar IIAndrews, TX659.8 GWh19.4 mi
SPS1 DollarhideJal, NM23.0 GWh20.3 mi
SPS2 JalJal, NM21.1 GWh24.5 mi
Swift Air Solar IGoldsmith, TX364.7 GWh17.5 mi
Swift Air Solar IIOdessa, TX81.5 GWh26.1 mi
Swift Air Solar IIIOdessa, TX54.6 GWh26.1 mi
TumbleweedAndrews, TX200.0 MWh29.3 mi
WestoverOdessa, TX185.0 MWh25 mi