Star Point Wind Project LLC
98100 Baseline Lane, Wasco, OR 97065Plant Summary Information
Star Point Wind Project LLC is ranked #38 out of 267 power plants in Oregon in terms of total annual net electricity generation.
Star Point Wind Project LLC generated 38.9 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Star Point Wind Project LLC |
---|---|
Utility Name | Avangrid Power LLC |
Location | Sherman County, OR |
Initial Operation Date | February 2010 |
Last Update | Dec 2024 |
Annual Generation | 217.8 GWh |
Annual Consumption | 773.2 k MMBtu |
Ranked #2,309 out of 12,312 Power Plants Nationwide | |
Ranked #713 out of 1,355 Wind Power Plants Nationwide | |
Ranked #38 out of 267 Oregon Power Plants | |
Ranked #17 out of 49 Oregon Wind Power Plants | |
Fuel Types | Wind |
Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) Avangrid Power LLC (2024 to 2024) |
Map of Star Point Wind Project LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Star Point Wind Project LLC.
Monthly Net Generation for Star Point Wind Project LLC
Star Point Wind Project LLC Details
Summary Information | |
---|---|
Plant Name | Star Point Wind Project LLC (57096) |
Plant Address | 98100 Baseline Lane, Wasco, OR 97065 |
Utility | Avangrid Power LLC (15399) |
Latitude, Longitude | 45.51, -120.48 |
Generation Dates on File | Feb 2010 to Dec 2024 |
Initial Operation Date | February 2010 |
Annual Generation | 217.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG10-8-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Avangrid Renewables LLC (AVRN) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Bonneville Power Administration (1738) OR |
Grid Voltage | 32.30 kV |
Energy Storage | No |
Generator 1 Details Operating February 2010
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 98.7 MW |
Summer Capacity | 98.7 MW |
Winter Capacity | 98.7 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | February 2010 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 47 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 47 |
---|---|
Predominant Turbine Manufacturer | Suzlon |
Predominant Turbine Model Number | S88-2100 |
Design Wind Speed | 15.6 MPH |
Wind Quality Class | 3 - Low Wind |
Turbine Hub Height Feet | 259 |
Star Point Wind Project LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#703 | Ponderosa Wind II | Balko, OK | 225.9 GWh |
#704 | Bison 3 Wind Energy Center | New Salem, ND | 223.3 GWh |
#705 | Vasco Winds | Livermore, CA | 223.0 GWh |
#706 | Goat Wind LP | Sterling City, TX | 222.5 GWh |
#707 | Alta Wind VIII | Mojave, CA | 222.0 GWh |
#708 | Weaver Wind | Township 16, ME | 219.8 GWh |
#709 | Pebble Springs Wind LLC | Wasco, OR | 219.0 GWh |
#710 | Bison 2 Wind Energy Center | New Salem, ND | 218.7 GWh |
#711 | Wethersfield | Gainsville, NY | 218.5 GWh |
#712 | Corriedale Wind Energy | Cheyenne, WY | 218.1 GWh |
#714 | Independence Wind Farm | Manchester, IA | 217.4 GWh |
#715 | Coachella Hills Wind | Palm Springs, CA | 216.5 GWh |
#716 | Crescent Ridge | Tiskilwa, IL | 216.5 GWh |
#717 | Flat Water Wind Farm LLC | Du Bois, NE | 215.6 GWh |
#718 | Foote Creek I | McFadden, WY | 215.5 GWh |
#719 | Penascal II Wind Project LLC | Sarita, TX | 211.0 GWh |
#720 | Barton Chapel Wind Farm | Jacksboro, TX | 210.9 GWh |
#721 | Nine Canyon | Kennewick, WA | 209.3 GWh |
#722 | Allegheny Ridge Wind Farm | Portage, PA | 209.1 GWh |
#723 | Fairbanks Wind Park | Garden, MI | 208.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Star Point Wind Project LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Arlington Wind Power Project | Arlington, OR | 201.0 GWh | 19.6 mi |
Biglow Canyon Wind Farm | Wasco, OR | 930.4 GWh | 11.6 mi |
Condon Windpower LLC | Condon, OR | 77.0 GWh | 18.8 mi |
Golden Hill Wind | Wasco, OR | 592.0 GWh | 11.6 mi |
Goodnoe Hills | Goldendale, WA | 275.5 GWh | 18.9 mi |
Harvest Wind Project | Roosevelt, WA | 263.7 GWh | 21.9 mi |
Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh | 4.6 mi |
John Day | Rufus, OR | 7.4 TWh | 17.6 mi |
Klondike Wind Power | Wasco, OR | 17.8 GWh | 4.7 mi |
Klondike Windpower II | Wasco, OR | 245.8 GWh | 6.9 mi |
Klondike Windpower III | Wasco, OR | 690.5 GWh | 5.2 mi |
Leaning Juniper | Arlington, OR | 275.2 GWh | 16.4 mi |
Leaning Juniper Wind Power II | Arlington, OR | 416.6 GWh | 14.4 mi |
Linden Wind Energy Project | Goldendale, WA | 96.5 GWh | 21.8 mi |
Montague Solar | Arlington, OR | 372.1 GWh | 14.7 mi |
Montague Wind Power Facility LLC | Arlington, OR | 484.5 GWh | 19.6 mi |
PaTu Wind Farm LLC | Wasco, OR | 29.9 GWh | 9.7 mi |
Waste Management Columbia Ridge LFGTE | Arlington, OR | 55.3 GWh | 9.9 mi |
Wheat Field Wind Power Project | Arlington, OR | 198.0 GWh | 13.9 mi |
WyEast Solar | Wasco, OR | 21.1 GWh | 7.8 mi |