R W Miller
2217 F.M.Road 3137, Palo Pinto, TX 76484Plant Summary Information
R W Miller is ranked #94 out of 313 natural gas power plants in Texas in terms of total annual net electricity generation.
R W Miller is comprised of 5 generators and generated 18.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | R W Miller |
|---|---|
| Utility Name | RW Miller Power LLC |
| Location | Palo Pinto County, TX |
| Initial Operation Date | October 1968 |
| Last Update | May 2026 |
| Annual Generation | 586.3 GWh |
| Annual Consumption | 8.7 M MMBtu |
| Ranked #1,164 out of 13,081 Power Plants Nationwide | |
| Ranked #527 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #226 out of 852 Texas Power Plants | |
| Ranked #94 out of 313 Texas Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Brazos Electric Power Coop Inc (2013 to 2022) RW Miller Power LLC (2023 to 2025) |
Map of R W Miller
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for R W Miller.
Monthly Net Generation for R W Miller
Monthly Plant Fuel Consumption for R W Miller
R W Miller Details
| Summary Information | |
|---|---|
| Plant Name | R W Miller (3628) |
| Plant Address | 2217 F.M.Road 3137, Palo Pinto, TX 76484 |
| Utility | RW Miller Power LLC (66086) |
| Latitude, Longitude | 32.6581, -98.3103 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | October 1968 |
| Annual Generation | 586.3 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Lake Palo Pinto |
| Ash Impoundment | Yes Lined Operating |
| Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | ATMOS ENERGY CORPORATION |
| Natural Gas Storage | No |
Generator 1 Details Out of Service October 1968
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MIL_MILG1_2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MIL_MILG1_2 |
| Nameplate Capacity | 66 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 66 MW |
| Winter Capacity | 66 MW |
| Minimum Load | 20 MW |
| Uprate/Derate Completed | No |
| Status | Out of Service |
| First Operation Date | October 1968 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Multiple Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 1972
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MIL_MILG1_2 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MIL_MILG1_2 |
| Nameplate Capacity | 100 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 118 MW |
| Winter Capacity | 118 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1972 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 118 MW |
| Net Winter Capacity With Natural Gas | 118 MW |
| Net Summer Capacity With Oil | 75 MW |
| Net Winter Capacity With Oil | 75 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 3 Details Operating August 1975
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MIL_MILG345 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MIL_MILG345 |
| Nameplate Capacity | 200 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 195 MW |
| Winter Capacity | 195 MW |
| Minimum Load | 40 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1975 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | OVER |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 195 MW |
| Net Winter Capacity With Natural Gas | 195 MW |
| Net Summer Capacity With Oil | 155 MW |
| Net Winter Capacity With Oil | 155 MW |
| Time To Switch From Gas To Oil | 6H |
| Time To Switch From Oil To Gas | 6H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 4 Details Operating July 1994
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MIL_MILG345 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MIL_MILG345 |
| Nameplate Capacity | 118.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 104 MW |
| Winter Capacity | 118 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | July 1994 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 104 MW |
| Net Winter Capacity With Natural Gas | 104 MW |
| Net Summer Capacity With Oil | 104 MW |
| Net Winter Capacity With Oil | 104 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
Generator 5 Details Operating July 1994
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | MIL_MILG345 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | MIL_MILG345 |
| Nameplate Capacity | 118.8 MW |
| Nameplate Power Factor | 0.9 |
| Summer Capacity | 104 MW |
| Winter Capacity | 118 MW |
| Minimum Load | 35 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1994 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Subcritical Technology | No |
| Multiple Fuels | Yes |
| Cofire Fuels | Yes |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Cofire Energy Source | NG / DFO |
|---|---|
| Switch When Operating | Yes |
| Net Summer Capacity With Natural Gas | 104 MW |
| Net Winter Capacity With Natural Gas | 104 MW |
| Net Summer Capacity With Oil | 104 MW |
| Net Winter Capacity With Oil | 104 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Air Permit Limits | Yes |
R W Miller Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #517 | Morris Cogeneration LLC | Morris, IL | 621.2 GWh |
| #518 | Anadarko Plant | Anadarko, OK | 615.9 GWh |
| #519 | Horseshoe Lake | Harrah, OK | 614.9 GWh |
| #520 | JM Shafer Generating Station | Ft. Lupton, CO | 613.9 GWh |
| #521 | RockGen Energy Center | Cambridge, WI | 624.8 GWh |
| #522 | Louisa Generation Facility | Gordonsville, VA | 646.1 GWh |
| #523 | Kennedy International Airport Cogen | Jamaica, NY | 609.1 GWh |
| #524 | Roseton Generating Facility | Newsburgh, NY | 795.9 GWh |
| #525 | Marathon Bay Area Cogen | Martinez, CA | 595.6 GWh |
| #526 | Naughton | Kemmerer, WY | 1.7 TWh |
| #528 | Shell Chemical | Geismar, LA | 585.3 GWh |
| #529 | R D Green | Robards, KY | 580.7 GWh |
| #530 | SABIC Innovative Plastics Mt. Vernon | Mount Vernon, IN | 579.6 GWh |
| #531 | Oleander Power Project LP | Cocoa, FL | 579.6 GWh |
| #532 | NAFTA Region Olefins Complex Cogen Fac | Port Arthur, TX | 577.5 GWh |
| #533 | Ocean State Power II | Harrisville, RI | 576.9 GWh |
| #534 | Bethpage Power Plant | Hicksville, NY | 573.5 GWh |
| #535 | JCO Oxides Olefins Plant | Port Neeches, TX | 569.5 GWh |
| #536 | Trumbull Energy Center | Warren, OH | 569.2 GWh |
| #537 | Gerald Andrus | Greenville, MS | 566.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding R W Miller.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Barton Chapel Wind Farm | Jacksboro, TX | 127.5 GWh | 27.3 mi |
| Bridgeport Gas Processing Plant | Bridgeport, TX | 46.6 GWh | 47.4 mi |
| Buckthorn Wind | Mingus, TX | 368.4 GWh | 20.2 mi |
| Comanche Peak | Glen Rose, TX | 20.0 TWh | 39.4 mi |
| DeCordova Steam Electric Station | Granbury, TX | 48.8 GWh | 39.7 mi |
| Graham | Graham, TX | 1.1 TWh | 37.3 mi |
| Hecate Energy Longhorn Solar LLC | Jacksboro, TX | 291.7 GWh | 26.7 mi |
| Jack County | Bridgeport, TX | 4.5 TWh | 36.8 mi |
| Keechi Wind | Jacksboro, TX | 394.9 GWh | 34.6 mi |
| La Casa Wind | Ranger, TX | 300.7 GWh | 21.4 mi |
| Roadrunner Wind Farm | Cisco, TX | 960.8 GWh | 48.9 mi |
| Senate Wind LLC | Bryson, TX | 393.7 GWh | 38 mi |
| Silver Star I Wind Power Project | Dublin, TX | 204.9 GWh | 24.1 mi |
| TPE Erath Solar, LLC | Stephenville, TX | 23.7 GWh | 28 mi |
| WAL3773 | Fort Worth, TX | 408.0 MWh | 48.6 mi |
| Westside Landfill Gas Recovery | Aledo, TX | 18.8 GWh | 45.2 mi |
| Wise County Power LLC | Poolville, TX | 3.1 TWh | 36.1 mi |
| Wolf Hollow I LP | Granbury, TX | 3.1 TWh | 40.5 mi |
| Wolf Hollow II | Granbury, TX | 4.9 TWh | 40.2 mi |
| Young Wind | Graham, TX | 1.5 TWh | 44.8 mi |