Eland Solar & Storage Center, Phase 1 Hy
TBD, Mojave, CA 93280Plant Summary Information
Eland Solar & Storage Center, Phase 1 Hy is ranked #62 out of 818 solar farms in California in terms of total annual net electricity generation.
Eland Solar & Storage Center, Phase 1 Hy generated 135.0 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Eland Solar & Storage Center, Phase 1 Hy |
---|---|
Utility Name | 68SF 8me LLC |
Location | Kern County, CA |
Initial Operation Date | November 2024 |
Last Update | May 2025 |
Annual Generation | 290.5 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,960 out of 12,312 Power Plants Nationwide | |
Ranked #209 out of 6,191 Solar Power Plants Nationwide | |
Ranked #181 out of 1,568 California Power Plants | |
Ranked #62 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Map of Eland Solar & Storage Center, Phase 1 Hy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eland Solar & Storage Center, Phase 1 Hy.
Monthly Net Generation for Eland Solar & Storage Center, Phase 1 Hy
Eland Solar & Storage Center, Phase 1 Hy Details
Summary Information | |
---|---|
Plant Name | Eland Solar & Storage Center, Phase 1 Hy (61168) |
Plant Address | TBD, Mojave, CA 93280 |
Utility | 68SF 8me LLC (60797) |
Latitude, Longitude | 35.2237, -117.977 |
Generation Dates on File | Nov 2024 to May 2025 |
Initial Operation Date | November 2024 |
Annual Generation | 290.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator 61168 Details Operating November 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 150 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Multiple Fuels | No |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 600 |
---|---|
Maximum Charge Rate | 150 MW |
Maximum Discharge Rate | 150 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 100 |
Storage Enclosure Type | CS |
Frequency Regulation | Yes |
Load Following | Yes |
Voltage Or Reactive Power Support | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 60797 |
Direct Support Gen Id | 61168 |
Support T D Asset | Yes |
Generator 68SF8 Details Operating November 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 309.6 MW |
Nameplate Power Factor | 0.95 |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 60 |
DC Net Capacity | 384 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Eland Solar & Storage Center, Phase 1 Hy Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 61168 | 100.00% |
Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | Generator 68SF8 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#199 | AP Sunray LLC | Knippa, TX | 309.2 GWh |
#200 | Brittlebush Solar | Coolidge, AZ | 308.9 GWh |
#201 | Porter Solar, LLC (TX) | Krum, TX | 307.2 GWh |
#202 | SR DeSoto I, LLC | DeSoto, GA | 306.8 GWh |
#203 | Quitman II Solar | Quitman, GA | 306.6 GWh |
#204 | Edwards Sanborn E2 | Mojave, CA | 292.0 GWh |
#205 | Storey Solar and Storage | Coolidge, AZ | 292.9 GWh |
#206 | Hornet Solar (TX) | Tulia, TX | 305.2 GWh |
#207 | Concho Valley Solar, LLC | San Angelo, TX | 304.5 GWh |
#208 | Fighting Jays Solar Project | Needville, TX | 304.5 GWh |
#210 | Harry Allen Solar Energy LLC | Apex, NV | 300.5 GWh |
#211 | Corazon Energy LLC | Rachito Las Lomas, TX | 298.9 GWh |
#212 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
#213 | Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh |
#214 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 297.7 GWh |
#215 | CA Flats Solar 150, LLC | Shandon, CA | 297.6 GWh |
#216 | Wistaria Ranch Solar | Calexico, CA | 294.8 GWh |
#217 | Campo Verde Solar | El Centro, CA | 294.7 GWh |
#218 | River Ferry Solar 1 | West Union, IL | 293.9 GWh |
#219 | Battle Mountain Solar Project | Battle Mountain, NV | 289.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eland Solar & Storage Center, Phase 1 Hy.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beacon Solar Plant Site 2 | Cantil, CA | 115.3 GWh | 3.2 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 95.4 GWh | 3.7 mi |
CalCity Solar 1 | California City, CA | 7.9 GWh | 5.7 mi |
California City | California City, CA | 4.6 GWh | 4.6 mi |
Difwind Farms Ltd VI | Mojave, CA | 14.9 GWh | 16.2 mi |
Edwards Sanborn S1 | Mojave, CA | 96.2 GWh | 16.2 mi |
Edwards Sanborn S3 | Mojave, CA | 82.2 GWh | 16.5 mi |
Edwards Sanborn S4 | Mojave, CA | 83.9 GWh | 16.7 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 129.9 GWh | 3.8 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 128.2 GWh | 2.9 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 116.4 GWh | 3.5 mi |
North Sky River Energy LLC | Weldon, CA | 435.0 GWh | 14.6 mi |
Pine Tree Solar Project | Owenyo, CA | 7.2 GWh | 12.4 mi |
Pine Tree Wind Power Project | Cantil, CA | 115.4 GWh | 11.3 mi |
RE Barren Ridge 1 | Mojave, CA | 175.0 GWh | 5.3 mi |
Rising Tree Wind Farm II | Mojave, CA | 58.7 GWh | 16 mi |
Sky River Wind Energy Center | Tehachapi, CA | 245.0 GWh | 15.4 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 248.2 GWh | 3.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh | 2.1 mi |
Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh | 1.8 mi |