Eland Solar & Storage Center, Phase 1 Hybrid
TBD, Mojave, CA 93280Plant Summary Information
Eland Solar & Storage Center, Phase 1 Hybrid is ranked #83 out of 761 solar farms in California in terms of total annual net electricity generation.
Eland Solar & Storage Center, Phase 1 Hybrid generated 137.3 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Eland Solar & Storage Center, Phase 1 Hybrid |
---|---|
Utility Name | 68SF 8me LLC |
Location | Kern County, CA |
Initial Operation Date | Not Available |
Last Update | Mar 2025 |
Annual Generation | 205.6 GWh |
Annual Consumption | 731.1 k MMBtu |
Ranked #2,312 out of 11,623 Power Plants Nationwide | |
Ranked #286 out of 5,666 Solar Power Plants Nationwide | |
Ranked #256 out of 1,487 California Power Plants | |
Ranked #83 out of 761 California Solar Power Plants | |
Fuel Types | Solar |
Map of Eland Solar & Storage Center, Phase 1 Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Eland Solar & Storage Center, Phase 1 Hybrid.
Monthly Net Generation for Eland Solar & Storage Center, Phase 1 Hybrid
Eland Solar & Storage Center, Phase 1 Hybrid Details
Summary Information | |
---|---|
Plant Name | Eland Solar & Storage Center, Phase 1 Hybrid (61168) |
Plant Address | TBD, Mojave, CA 93280 |
Utility | 68SF 8me LLC (60797) |
Latitude, Longitude | 35.2237, -117.977 |
Generation Dates on File | Nov 2024 to Mar 2025 |
Initial Operation Date | Not Available |
Annual Generation | 205.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Los Angeles Department of Water and Power (LDWP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Los Angeles Department of Water & Power (11208) CA |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Eland Solar & Storage Center, Phase 1 Hybrid Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | 100.00% |
Arevon Asset Management | 8800 N Gainey Center Dr, Suite 250, Scottsdale, AZ 85258 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#276 | Fish Springs | Reno, NV | 219.4 GWh |
#277 | Albemarle Beach Solar | Roper, NC | 221.6 GWh |
#278 | Butler Solar Project 103 | Butler, GA | 219.8 GWh |
#279 | Iron Springs Solar, LLC | Cedar City, UT | 219.3 GWh |
#280 | Black Bear Solar 1 | Montgomery, AL | 219.2 GWh |
#281 | Robins Air Force Base Solar | Macon, GA | 216.1 GWh |
#282 | Escalante Solar II, LLC | Milford, UT | 216.0 GWh |
#283 | Escalante Solar I, LLC | Milford, UT | 215.1 GWh |
#284 | Chicot Solar | Lake Village, AR | 214.4 GWh |
#285 | Oak Solar | Gaston, NC | 214.4 GWh |
#287 | Copper Mountain Solar 4, LLC | Boulder City, NV | 214.2 GWh |
#288 | Granite Mountain Solar East, LLC | Cedar City, UT | 214.0 GWh |
#289 | Escalante Solar III, LLC | Milford, UT | 213.7 GWh |
#290 | Quinto Solar PV Project | Gustine, CA | 213.5 GWh |
#291 | Waverly Solar, LLC | Waverly, VA | 212.8 GWh |
#292 | Onion River | Sheboygan Cedar Grove, WI | 212.6 GWh |
#293 | Holliday Creek Solar | Fort Dodge, IA | 211.9 GWh |
#294 | Happy Solar 1 | Searcy, AR | 211.6 GWh |
#295 | Searcy Solar Hybrid | Searcy, AR | 210.2 GWh |
#296 | Point Beach Solar | Two Creeks, WI | 209.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Eland Solar & Storage Center, Phase 1 Hybrid.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Beacon Solar Plant Site 2 | Cantil, CA | 114.7 GWh | 3.2 mi |
Beacon Solar Plant Site 5 | Cantil, CA | 96.1 GWh | 3.7 mi |
CalCity Solar 1 | California City, CA | 7.4 GWh | 5.7 mi |
California City | California City, CA | 5.3 GWh | 4.6 mi |
Difwind Farms Ltd VI | Mojave, CA | 15.3 GWh | 16.2 mi |
Edwards Sanborn S1 | Mojave, CA | 92.8 GWh | 16.2 mi |
Edwards Sanborn S3 | Mojave, CA | 81.5 GWh | 16.5 mi |
Edwards Sanborn S4 | Mojave, CA | 77.1 GWh | 16.7 mi |
Hecate Energy Beacon Solar 1 | Cantil, CA | 131.0 GWh | 3.8 mi |
Hecate Energy Beacon Solar 3 | Cantil, CA | 131.2 GWh | 2.9 mi |
Hecate Energy Beacon Solar 4 | Cantil, CA | 116.1 GWh | 3.5 mi |
North Sky River Energy LLC | Weldon, CA | 386.6 GWh | 14.6 mi |
Pine Tree Solar Project | Owenyo, CA | 6.9 GWh | 12.4 mi |
Pine Tree Wind Power Project | Cantil, CA | 61.0 GWh | 11.3 mi |
RE Barren Ridge 1 | Mojave, CA | 169.5 GWh | 5.3 mi |
Rising Tree Wind Farm II | Mojave, CA | 47.7 GWh | 16 mi |
Sky River Wind Energy Center | Tehachapi, CA | 201.6 GWh | 15.4 mi |
Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.2 GWh | 3.9 mi |
Springbok Solar Farm 1 | Cantil, CA | 291.6 GWh | 2.1 mi |
Springbok Solar Farm 2 | Cantil, CA | 404.2 GWh | 1.8 mi |