Storey Solar and Storage
430 East Steele Road, Coolidge, AZ 85128Plant Summary Information
Storey Solar and Storage is ranked #43 out of 166 power plants in Arizona in terms of total annual net electricity generation.
Storey Solar and Storage generated 91.8 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Storey Solar and Storage |
---|---|
Utility Name | Storey Energy Center, LLC |
Location | Pinal County, AZ |
Initial Operation Date | September 2023 |
Last Update | May 2025 |
Annual Generation | 292.9 GWh |
Annual Consumption | 1.2 M MMBtu |
Ranked #1,950 out of 12,312 Power Plants Nationwide | |
Ranked #205 out of 6,191 Solar Power Plants Nationwide | |
Ranked #43 out of 166 Arizona Power Plants | |
Ranked #13 out of 113 Arizona Solar Power Plants | |
Fuel Types | Solar |
Map of Storey Solar and Storage
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Storey Solar and Storage.
Monthly Net Generation for Storey Solar and Storage
Storey Solar and Storage Details
Summary Information | |
---|---|
Plant Name | Storey Solar and Storage (65956) |
Plant Address | 430 East Steele Road, Coolidge, AZ 85128 |
Utility | Storey Energy Center, LLC (64801) |
Latitude, Longitude | 32.8882, -111.4978 |
Generation Dates on File | Nov 2023 to May 2025 |
Initial Operation Date | September 2023 |
Annual Generation | 292.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Salt River Project (SRP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Salt River Project (16572) AZ |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator STORY Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 122 MW |
Summer Capacity | 88 MW |
Winter Capacity | 88 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Time From Cold Shutdown To Full Load | 10M |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Bifacial | Yes |
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 89 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator STOBA Details Operating September 2023
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 88 MW |
Summer Capacity | 88 MW |
Winter Capacity | 88 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 264 |
---|---|
Maximum Charge Rate | 88 MW |
Maximum Discharge Rate | 88 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 29 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Frequency Regulation | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 65956 |
Direct Support Gen Id | STORY |
Support T D Asset | No |
Storey Solar and Storage Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#195 | Fort Powhatan Solar | Disputanta, VA | 313.2 GWh |
#196 | Cavalier Solar | Smithfield, VA | 312.2 GWh |
#197 | Rancho Seco Solar II, LLC | Twin Cities, CA | 310.8 GWh |
#198 | Elora Solar | Elora, TN | 310.5 GWh |
#199 | AP Sunray LLC | Knippa, TX | 309.2 GWh |
#200 | Brittlebush Solar | Coolidge, AZ | 308.9 GWh |
#201 | Porter Solar, LLC (TX) | Krum, TX | 307.2 GWh |
#202 | SR DeSoto I, LLC | DeSoto, GA | 306.8 GWh |
#203 | Quitman II Solar | Quitman, GA | 306.6 GWh |
#204 | Edwards Sanborn E2 | Mojave, CA | 292.0 GWh |
#206 | Hornet Solar (TX) | Tulia, TX | 305.2 GWh |
#207 | Concho Valley Solar, LLC | San Angelo, TX | 304.5 GWh |
#208 | Fighting Jays Solar Project | Needville, TX | 304.5 GWh |
#209 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 290.5 GWh |
#210 | Harry Allen Solar Energy LLC | Apex, NV | 300.5 GWh |
#211 | Corazon Energy LLC | Rachito Las Lomas, TX | 298.9 GWh |
#212 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
#213 | Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh |
#214 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 297.7 GWh |
#215 | CA Flats Solar 150, LLC | Shandon, CA | 297.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Storey Solar and Storage.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Banner Solar Ironwood | Queen Creek, AZ | 3.8 GWh | 22.8 mi |
Bonnybrooke PV | Florence, AZ | 121.2 GWh | 14.6 mi |
Brittlebush Solar | Coolidge, AZ | 308.9 GWh | 2.6 mi |
Central Line Solar, LLC | Coolidge, AZ | 275.5 GWh | 5.5 mi |
Coolidge Generation Station | Coolidge, AZ | 74.7 GWh | 2 mi |
Copper Crossing Energy and Research Cent | Florence, AZ | 5.1 GWh | 18.5 mi |
Desert Basin | Casa Grande, AZ | 2.0 TWh | 16.9 mi |
East Line Solar | Coolidge, AZ | 244.2 GWh | 4.8 mi |
Eleven Mile Solar Center | Coolidge, AZ | 741.1 GWh | 5.8 mi |
Pinal Central Energy Center Hybrid | Casa Grande, AZ | 54.1 GWh | 3.2 mi |
Poseidon Solar, LLC | Globe, AZ | 50.2 GWh | 18.8 mi |
Red Rock | Red Rock, AZ | 84.1 GWh | 26.3 mi |
Saguaro | Red Rock, AZ | 135.2 GWh | 25.9 mi |
Saint Solar | Coolidge, AZ | 278.7 GWh | 1.5 mi |
Sandstone Solar | Florence, AZ | 117.2 GWh | 10.9 mi |
Sundance | Casa Grande, AZ | 350.8 GWh | 6 mi |
Union HS at Casa Grande | Casa Grande, AZ | 2.9 GWh | 14.4 mi |
Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.8 GWh | 12.5 mi |
Walmart Casa Grande | Casa Grande, AZ | 1.8 GWh | 16 mi |
West Line Solar, LLC | City of Eloy, AZ | 272.1 GWh | 9.7 mi |