Brittlebush Solar
4674 S. Vail Rd, Coolidge, AZ 85128Plant Summary Information
Brittlebush Solar is ranked #36 out of 170 power plants in Arizona in terms of total annual net electricity generation.
Brittlebush Solar generated 82.0 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Brittlebush Solar |
|---|---|
| Utility Name | Randolph Solar Park LLC |
| Location | Pinal County, AZ |
| Initial Operation Date | November 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 536.8 GWh |
| Annual Consumption | 2.0 M MMBtu |
| Ranked #1,279 out of 12,637 Power Plants Nationwide | |
| Ranked #96 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #36 out of 170 Arizona Power Plants | |
| Ranked #10 out of 117 Arizona Solar Power Plants | |
| Fuel Types | Solar |
Map of Brittlebush Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Brittlebush Solar.
Monthly Net Generation for Brittlebush Solar
Monthly Plant Fuel Consumption for Brittlebush Solar
Brittlebush Solar Details
| Summary Information | |
|---|---|
| Plant Name | Brittlebush Solar (67799) |
| Plant Address | 4674 S. Vail Rd, Coolidge, AZ 85128 |
| Utility | Randolph Solar Park LLC (66394) |
| Latitude, Longitude | 32.92581, -111.49048 |
| Generation Dates on File | Nov 2024 to Feb 2026 |
| Initial Operation Date | November 2024 |
| Annual Generation | 536.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Salt River Project (SRP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Salt River Project (16572) AZ |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator GEN01 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 200 MW |
| Summer Capacity | 200 MW |
| Winter Capacity | 200 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 282.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Brittlebush Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #86 | Fort Bend Solar LLC | East Bernard, TX | 554.6 GWh |
| #87 | Orion III Solar Project | Buckholts, TX | 553.8 GWh |
| #88 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 537.1 GWh |
| #89 | Golden Field Solar III, LLC | Rosamond, CA | 524.2 GWh |
| #90 | Porter Solar, LLC (TX) | Krum, TX | 546.2 GWh |
| #91 | Galloway 1 Solar Farm | Paint Rock, TX | 545.0 GWh |
| #92 | Dodge Flat | Reno, NV | 540.1 GWh |
| #93 | Taygete Energy Project LLC | Coyanosa, TX | 544.7 GWh |
| #94 | Stampede Solar Hybrid | Saltillo, TX | 533.2 GWh |
| #95 | Phoebe Solar | Kermit, TX | 537.3 GWh |
| #97 | Azure Sky Solar | Haskell, TX | 526.8 GWh |
| #98 | Daggett 2 | Daggett, CA | 516.0 GWh |
| #99 | Ash Creek Solar | Abbott, TX | 532.2 GWh |
| #100 | Hardin Solar III | Alger, OH | 529.7 GWh |
| #101 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 523.4 GWh |
| #102 | 7V Solar Ranch | Muldoon, TX | 523.6 GWh |
| #103 | Escalante (NM) | Grants, NM | 520.5 GWh |
| #104 | Noble Solar | Krum, TX | 515.1 GWh |
| #105 | Sun Streams 3 | Arlington, AZ | 477.6 GWh |
| #106 | Angelo Solar | San Angelo, TX | 515.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Brittlebush Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Banner Solar Ironwood | Queen Creek, AZ | 3.8 GWh | 20.3 mi |
| Bonnybrooke PV | Florence, AZ | 121.2 GWh | 12.4 mi |
| Box Canyon (AZ) | Florence, AZ | 609.7 GWh | 17.7 mi |
| Central Line Solar, LLC | Coolidge, AZ | 267.2 GWh | 7.8 mi |
| Coolidge Generation Station | Coolidge, AZ | 55.8 GWh | 0.9 mi |
| Copper Crossing Energy and Research Cent | Florence, AZ | 5.1 GWh | 15.8 mi |
| Desert Basin | Casa Grande, AZ | 2.7 TWh | 17.4 mi |
| East Line Solar | Coolidge, AZ | 251.3 GWh | 7 mi |
| Eleven Mile Solar Center | Coolidge, AZ | 791.1 GWh | 7.4 mi |
| Pinal Central Energy Center Hybrid | Casa Grande, AZ | 55.8 GWh | 4.9 mi |
| Poseidon Solar, LLC | Globe, AZ | 50.2 GWh | 16.2 mi |
| Queen Creek Solar Farm | Queen Creek, AZ | 40.7 GWh | 24.6 mi |
| Saint Solar | Coolidge, AZ | 280.7 GWh | 4.2 mi |
| Sandstone Solar | Florence, AZ | 117.2 GWh | 8.3 mi |
| Storey Solar and Storage | Coolidge, AZ | 299.6 GWh | 2.6 mi |
| Sundance | Casa Grande, AZ | 274.2 GWh | 5.8 mi |
| Union HS at Casa Grande | Casa Grande, AZ | 2.9 GWh | 14.4 mi |
| Vista Grande HS at Casa Grande | Casa Grande, AZ | 2.8 GWh | 13.1 mi |
| Walmart Casa Grande | Casa Grande, AZ | 1.8 GWh | 16.8 mi |
| West Line Solar, LLC | City of Eloy, AZ | 256.0 GWh | 12.3 mi |